Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 80548: 1993-060-00 EXP SAFE - CLATSOP CO 2019
Project Number:
Title:
Select Area Fisheries Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 100.00%
Contract Number:
80548
Contract Title:
1993-060-00 EXP SAFE - CLATSOP CO 2019
Contract Continuation:
Previous: Next:
77299: 1993-060-00 EXP SAFE - CLATSOP CO 2018
  • 83292: 1993-060-00 EXP 1993-060-00 EXP SAFE - CLATSOP CO 2020
Contract Status:
Closed
Contract Description:
The Select Area Fisheries Enhancement Project is a well-established cooperative program that strives to deliver quality commercial and recreational salmon fishing opportunities in a setting which maximizes the return of hatchery production into fisheries.  Funding support of this project is shared by the Bonneville Power Administration, the states of Oregon and Washington, Mitchell Act funds, and fisher/processor voluntary contributions.

The objectives of this project are mitigation, protection of endangered species, minimizing negative impact of SAFE fisheries and production on the environment, and providing for the most efficient use of hatchery stocks.  All objectives are accomplished by producing salmon for harvest in the lower Columbia River commercial and sports fisheries locally, and regionally for commercial and sports fisheries in the Pacific Northwest coastal zones.  The fish produced are select area bright fall Chinook, spring Chinook and lower Columbia River hatchery coho provide fish for harvest when fishing is curtailed to protect endangered stocks of fish and in Select Areas where the incidence of endangered fish is minimal and closely monitored.  The fish produced from this program are able to be identified separate from the endangered stocks by marking with coded wire tags.  Avoiding negative impact of rearing activities on the environment is accomplished through the successful net-pen rearing strategies that facilitate rapid out-outmigration and reduce incidence of disease.  Minimizing the incidence of hatchery fish on the spawning grounds by maximizing harvest of hatchery fish occurs through active in-season management of the commercial fisheries, fishing periods, gear restrictions and area boundaries, which have been refined over time to minimize impacts to listed species. Harvest rates are monitored under the Oregon Department of Fish & Wildlife's SAFE contract.

This project will continue the development of the SAFE sites to maximize harvest of returning adults and minimize catch of non-SAFE stocks at existing sites; coordinate activities with Washington and Oregon Departments of Fish and Wildlife, Clatsop County, Bonneville Power Administration, and the National Oceanic and Atmospheric Administration; and compile project results and information.
Account Type(s):
Expense
Contract Start Date:
10/05/2018
Contract End Date:
09/30/2019
Current Contract Value:
$477,778
Expenditures:
$477,778

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
BPA EC Compliance Met A: 165. Produce Environmental Compliance Documentation 10/01/2018 12/31/2018
2019 Hatchery Management Plan B: 174. Produce Hatchery Management Plan for spring Chinook, fall Chinook and coho salmon 10/01/2018 12/31/2018
800,000 2016 brood spring Chinook smolts C: 176. 2017 brood hatchery spring Chinook 03/31/2019 03/21/2019
1,365,000 2017 brood early stock lower Columbia River hatchery coho smolts D: 176. 2017 brood early stock lower Columbia River hatchery coho 04/30/2019 06/25/2019
Complete and attach 2018 winter, spring, summer and fall assessment contributions E: 141. Other Reports for BPA 05/31/2019 05/31/2019
BPA project administration requirements F: 119. Select Area Fisheries Enhancement Project Management 09/30/2019 09/30/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 174 Produce Plan
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 176 Produce Hatchery Fish

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Environmental Compliance Documentation 10/01/2018
B 174 Produce Hatchery Management Plan for spring Chinook, fall Chinook and coho salmon
C 176 2017 brood hatchery spring Chinook
D 176 2017 brood early stock lower Columbia River hatchery coho
E 141 Other Reports for BPA 10/01/2018
F 119 Select Area Fisheries Enhancement Project Management 10/01/2018
G 132 Multi Year 2017-2019 SAFE Report - CCF Contribution provided to ODFW 10/01/2018
H 185 Quarterly Status Reports 10/01/2018