Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74314 REL 57: 2006-003-00 EXP DESERT WILDLIFE AREA O&M
Project Number:
Title:
Desert Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Crab 100.00%
Contract Number:
74314 REL 57
Contract Title:
2006-003-00 EXP DESERT WILDLIFE AREA O&M
Contract Continuation:
Previous: Next:
74314 REL 27: 2006-003-00 EXP DESERT WILDLIFE AREA O&M
Contract Status:
Closed
Contract Description:
The Desert Wildlife Mitigation Project operates and maintains a total of 6 (TD-1,2,3,4,5,6) wetland enhancement projects on the Desert Wildlife Area that have been funded, in part, by the BPA. This contract will provide funding to operate and maintain the enhanced wetlands for one year to ensure they remain functional.

TD-1: Located adjacent to the Frenchman Hills Wasteway. When operated in the fall, 9 wetland basins are filled by diverting surface water from the wasteway into managed wetland basins/cells. The TD-1 project is considered a flow-through system that diverts irrigation water return flow from the wasteway into the project, with return flows back to the wasteway downstream of the inlet structure.
Current enhancements at the TD-1 Project include:  installation of 9 water control structures, construction of ditches and dikes for water management, sculpting wetland
basins to optimal depth for wetland obligate birds, island development, armoring 400 ft of dikes to protect against beaver and burrowing mammals, and seeding of disturbed soil resulting from construction activities.

TD-1: Annual regular and recurring operation and maintenance activities and costs include:  coordination with BOR and Quincy Irrigation District, inspecting and repairing enhancements, establishing desirable vegetation through varied methods, controlling undesirable vegetation and noxious weeds, operating water control structures to inundate and dewater the project to benefit seasonal migrants, inspecting and maintaining dike and water control structure integrity and function, monitor waterfowl use of the project, producing required BPA reports, and administering the contract.

TD-2: Located adjacent to the Winchester Wasteway.  Due to the relatively high water table which is influenced by seasonal wasteway flows, this passive project created shallow wetlands by excavating organic material from 19 late-succession stage wetlands. Enhancements include construction of 1,200 feet of isolation dikes to minimize potential infestation of unwanted fish populations, strategic armoring of the dikes to protect against beaver damage and burrowing mammals, and seeding disturbed soils resulting from construction activities.

TD-2: Annual regular and recurring operation and maintenance activities and costs include:  inspecting and repairing enhancements, monitoring and control of undesirable vegetation and noxious weeds, producing required BPA reports, and administering the contract. Management of all project ponds attempts to provide desirable habitat for waterfowl, shore birds, and other wetland species.

TD-3, TD-4, TD-5, and TD-6 were identified and included in the original project proposal as areas that would provide improved benefits for migratory and residential wetland associate species through strategic management techniques. TD-3 and TD-5 are influenced by the Frenchman Hills Wasteway, while TD-4 and TD-6 by the Winchester Wasteway. Annual activities on these sites have been limited to monitoring and treating invasive and non-desirable vegetation. These projects continue to provide wildlife benefits despite there being no formal enhancements to date.  
Account Type(s):
Expense
Contract Start Date:
02/01/2019
Contract End Date:
01/31/2020
Current Contract Value:
$121,735
Expenditures:
$121,735

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
BPA Administrative duties B: 119. BPA Administrative Requirements 01/31/2020 01/29/2020
Environmental Compliance C: 165. Environmental compliance documentation 01/31/2020 01/29/2020
Seed 20 acres of moist soil vegetation at TD-1 project site D: 47. Moist soil seeding in TD-1 10/31/2019 10/31/2019
TD-1 cells tilled E: 181. Till cells at TD1 10/31/2019 10/31/2019
Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2, TD-4, TD-6 F: 198. Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2 01/31/2020 01/29/2020
Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1, TD-3, TD-5 G: 198. Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 01/31/2020 01/29/2020
Armor dikes at the TD-1 site H: 186. Inspect and repair water control structures and dikes at TD-1 site 01/31/2020 01/29/2020
Armor dikes at the TD-2 site I: 186. Inspect and repair dikes at TD-2 site 01/31/2020 01/29/2020
Seed and plant plugs into disturbed soil at TD-1 J: 186. Seed and plant plugs into disturbed soil at TD-1 site 01/31/2020 01/29/2020
Seed and plant plugs into disturbed soil at TD-2 K: 186. Seed and plant plugs into disturbed soil at TD-2 site 01/31/2020 01/29/2020
Water in wetland cells at TD-1 L: 186. Operate water control structures at TD-1 01/31/2020 01/29/2020
Numbers and species of waterfowl using TD-1 and TD-2 waters through the spring, fall and winter M: 157. Fall and winter waterfowl counts 01/31/2020
Attach 2018-2019 Annual Progress Report in Pisces N: 132. Submit Progress Report for the period Feb 2018 to Jan 2019 08/31/2019 09/30/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 2 instances of WE 198 Maintain Vegetation
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2019
B 119 BPA Administrative Requirements 02/01/2019
C 165 Environmental compliance documentation 02/01/2019
D 47 Moist soil seeding in TD-1 02/01/2019
E 181 Till cells at TD1 02/01/2019
F 198 Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2 02/01/2019
G 198 Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 02/01/2019
H 186 Inspect and repair water control structures and dikes at TD-1 site 02/01/2019
I 186 Inspect and repair dikes at TD-2 site 02/01/2019
J 186 Seed and plant plugs into disturbed soil at TD-1 site 02/01/2019
K 186 Seed and plant plugs into disturbed soil at TD-2 site 02/01/2019
L 186 Operate water control structures at TD-1 02/01/2019
M 157 Fall and winter waterfowl counts 02/01/2019
N 132 Submit Progress Report for the period Feb 2018 to Jan 2019 02/01/2019