Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
76913 REL 13
Contract Title:
2007-394-00 EXP ID WATERSHED HAB RESTOR LEMHI - USBWP
Contract Continuation:
Previous: Next:
76913 REL 4: 2007-394-00 EXP ID WATERSHED HAB RESTOR LEMHI
  • 76913 REL 21: 2007-394-00 EXP ID WATERSHED HAB RESTOR LEMHI- PLANNING
Contract Status:
Closed
Contract Description:
The primary goal of this contract is to continue to develop projects that protect, enhance and restore anadromous and resident fish habitat and to achieve a balance between resource protection and use in the Upper Salmon River Basin. Project selection is based off existing relationships, ranking through the Salmon Basin Technical Team, and a continuing effort starting in 2017 on a new science-based process led by efforts bewtween OSC and the BOR, resulting in the Integrated Rehabilitation Assessment (IRA). The IRA is continuing to be developed through 2018-2020. This contract also builds on continuing to improve multi-year planning and design, and collaboration with BPA staff.

This contract provides resources in support of the Upper Salmon Basin Watershed Program (USBWP), which is administered by the Office of Species Conservation (OSC).  The USBWP will continue to identify, select, and develop projects for implementation occuring under other BPA projects, such as 2007-399-00 or 2010-072-00. Projects are developed to address identified limiting factors for anadromous fish, which improves habitat conditions, resulting in increased survival rates. The USBWP facilitates collaboration and coordination of basin-wide restoration efforts among local entities and private landowners to implement these projects.

A locally staffed office develops projects focused on addressing factors limiting the productivity of ESA-listed Pacific salmonids presented in the Salmon Subbasin Management Plan (2004) and the Federal Columbia River Power System (FCRPS) Biological Opinion, and provides collaboration and coordination on basin wide restoration efforts among local entities. This contract provides staff and operational support in order to accelerate the pace of project development of high priority, on-the-ground fish habitat improvement projects that will be implemented under Idaho Fish Accord and Capital BPA projects, including 2007-072-00 and 2007-399-00.

Account Type(s):
Expense
Contract Start Date:
09/01/2019
Contract End Date:
08/31/2020
Current Contract Value:
$350,795
Expenditures:
$350,795

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Effective implementation management and timely contract administration A: 119. Routine administration of contract 08/31/2020 08/31/2020
Completed Annual Report C: 132. Submit Progress Report for the period (Sept 2018 ) to (Aug 2019) 01/31/2020 01/13/2020
Coordination of the Upper Salmon Basin Watershed D: 191. Watershed Coordination of the Upper Salmon Basin 08/31/2020 08/31/2020
Projects identified, proposals ranked and submitted E: 114. Identify and Select Projects in the Upper Salmon Basin 08/31/2020 08/31/2020
Complete Section 7 ESA Consultation and IDWR/ACOE permitting F: 165. Section 7 ESA consultation, permitting, Section 106 cultural consultation, NEPA 08/31/2020 08/31/2020
Provide tech review of designs and draft documents G: 122. Provide design technical review 08/31/2020 08/31/2020
Produce engineering designs for Lemhi conservation projects. H: 175. Produce engineering designs for Lemhi conservation actions 08/31/2020 08/31/2020
Conduct outreach and education on USBWP mission, projects, and fish habitat I: 99. Outreach and education 08/31/2020 08/31/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Routine administration of contract 09/01/2019
B 185 Periodic Status Reports for BPA 09/01/2019
C 132 Submit Progress Report for the period (Sept 2018 ) to (Aug 2019) 09/01/2019
D 191 Watershed Coordination of the Upper Salmon Basin 09/01/2019
E 114 Identify and Select Projects in the Upper Salmon Basin 09/01/2019
F 165 Section 7 ESA consultation, permitting, Section 106 cultural consultation, NEPA 09/01/2019
G 122 Provide design technical review 09/01/2019
H 175 Produce engineering designs for Lemhi conservation actions 09/01/2019
I 99 Outreach and education 09/01/2019