Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73354 REL 34: 2007-155-00 EXP DEVELOP A MASTER PLAN FOR A REARING FACILITY
Project Number:
Title:
Develop a Master Plan for a Rearing Facility to Enhance Selected Populations of White Sturgeon in the Columbia River Basin
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Columbia Lower Middle 100.00%
Contract Number:
73354 REL 34
Contract Title:
2007-155-00 EXP DEVELOP A MASTER PLAN FOR A REARING FACILITY
Contract Continuation:
Previous: Next:
73354 REL 14: 2007-155-00 EXP DEVELOP A STURGEON HATCHERY MASTER PLAN
  • 73354 REL 50: 2007-155-00 EXP DEVELOP A MASTER PLAN FOR A REARING FACILITY
Contract Status:
Closed
Contract Description:
In this contract year we will  
1)  complete Step I of the Hatchery Master Planning Process through the ISRP review and NPCC acceptance, and  
2) initiate  Step 2 of the process including the NEPA review.
Account Type(s):
Expense
Contract Start Date:
09/15/2019
Contract End Date:
08/31/2020
Current Contract Value:
$95,032
Expenditures:
$95,032

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Contract Development & Direction B: 119. Contract Development and Direction 08/31/2020
Step 2: Master Plan Revisions C: 196. STEP 2: Master Plan Step 2 Tasks 08/31/2020
Step 2 Environmental Compliance Documents D: 165. STEP 2: Assist with NEPA process contracted by BPA 08/31/2020
Completed Water Plan for the Sturgeon Master Plan Facility E: 174. Water Evaluations at Marion Drain Hatchery Site 08/31/2020
Final Engineering Plan on the overall operation of the proposed facility. F: 174. Engineering support to update Marion Drain conceptual design 08/31/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS
  • 1 instance of WE 196 Council Step Process
  • 2 instances of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Contract Development and Direction
C 196 STEP 2: Master Plan Step 2 Tasks
D 165 STEP 2: Assist with NEPA process contracted by BPA
E 174 Water Evaluations at Marion Drain Hatchery Site
F 174 Engineering support to update Marion Drain conceptual design
G 132 Annual progress report not required