Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84082: 2003-063-00 EXP USFWS REPRO SUCCESS ABERNATHY CREEK
Project Number:
Title:
Natural Reproductive Success and Demographic Effects of Hatchery-Origin Steelhead in Abernathy Creek, Washington
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
84082
Contract Title:
2003-063-00 EXP USFWS REPRO SUCCESS ABERNATHY CREEK
Contract Continuation:
Previous: Next:
81000: 2003-063-00 EXP REPRO SUCCESS ABERNATHY CREEK
Contract Status:
Complete
Contract Description:
Our goal is to compare hatchery-origin and natural-origin steelhead and assess the demographic effects of hatchery fish supplementation in Abernathy Creek relative to two control streams. Currently the ability of hatchery-origin steelhead to contribute to the recovery of naturally spawning populations while minimizing genetic and ecological risks is unknown.

This project will compare hatchery-origin (HOR) and natural-origin (NOR) steelhead trout, simultaneously investigating methods of operating a conservation hatchery and the effectiveness of artificial production of an integrated NOR/HOR broodstock on recovery. This directly addresses 2008 NOAA Fisheries FCRPS Biological Opinion (NWF v. NMFS, Civ. No. CV 01-640-RE (D. Oregon)) reasonable and prudent alternatives (RPAs) 63.1, 64.1, and 64.2. The ability of HOR adults to contribute, via supplementation, to the recovery of naturally spawning steelhead populations is still a major uncertainty in the Pacific Northwest. This question has been debated intensively throughout the Columbia River Basin for over 10 years but remains unresolved. Additionally, the source of broodstock for supplementation programs may have negative genetic and ecological impacts on natural populations. The development of native broodstocks of hatchery steelhead may pose unacceptable biological risks to naturally spawning populations that are listed as threatened or endangered under the Endangered Species Act (ESA). The traditional method of initiating new hatchery broodstock of anadromous salmonids is to trap adults during their spawning migration. However, removing NOR adults from ESA listed populations may not be biologically acceptable because such activities may further depress those populations. Also, trapping large numbers of adult steelhead may not be feasible in many subbasins because high water in the spring during steelhead migrations often destroys temporary weirs. As a result, alternative methods for developing broodstocks from NOR steelhead are highly desired.

Abernathy Fish Technology Center (AFTC) developed an integrated NOR/HOR steelhead broodstock starting with pre-smolt NOR juveniles collected from Abernathy Creek that were reared to sexual maturity in a hatchery. This project provides an assessment of an alternative method of establishing a native salmonid broodstock when large numbers of native adults are unavailable, a common issue for the establishment of conservation hatcheries.  Broodstock programs developed through juvenile collections have the advantage of increasing the genetic effective population size by potentially incorporating the offspring of all adults that spawn successfully within a stream or watershed.  In turn, greater genetic effective population size of the hatchery stock reduces the risk of genetically “swamping” the natural spawning population with a few over-represented families. In order to minimize genetic differences between NOR and HOR steelhead, we will continue to utilize captured NOR steelhead to maintain an integrated NOR/HOR broodstock. NOR and HOR upstream migrating adults will continue to be genotyped so we can focus on parentage assignment for adults.  

Our renewed focus on strict adherence to spawning protocols will allow us to assess our ability to maintain genetic similarity between the HOR and NOR components of the Abernathy Creek steelhead population and correct the effects of previously using a small proportion of NOR broodstock in the hatchery.  This project year, juvenile steelhead production and adult returns occurring within Abernathy Creek will be compared to two control streams (i.e. Germany and Mill creeks).  In addition, we are evaluating hatchery rearing methods and their impacts on behavior, physiology, and gene expression of HOR steelhead. We continue to assess demographic changes and differences in behavior and physiology between NOR and HOR steelhead to evaluate the impact of the supplementation program. Assignment of adult progeny will also allow us to assess correlations in biological characteristics (e.g. physiological traits, run timing, return size and age) between parents and returning adult offspring.  Comparing HOR and NOR adults coupled with monitoring demographic changes in population abundance along with behavioral and physiological differences, with appropriate natural population controls, is critical to assessment of artificial production in conservation hatcheries.

OBJECTIVES
Objective  1. Maintain a conservation hatchery broodstock of steelhead using protocols to minimize effects of artificial rearing on an integrated broodstock.
Objective  2. Use selectively-neutral, DNA markers to determine the amount of genetic change associated with captive rearing of NOR steelhead.
Objective  3. Estimate total annual smolt emigration and behavior of steelhead in Abernathy, Germany, and Mill creeks.
Objective  4. Assess physiological status of HOR and NOR steelhead smolts.
Objective  5. Control passage of HOR and NOR for evaluation of relative reproductive success; retain some steelhead for conservation hatchery broodstock.
Objective  6. Develop conservation hatchery broodstock of steelhead that is genetically integrated.
Objective  7. Determine the relative, natural reproductive success of hatchery-origin (HOR) and natural-origin (NOR) steelhead in Abernathy Creek above Abernathy Fish Technology Center. This objective will not be worked on in 2018.
Objective  8. Manage and administer project and communicate work and results to BPA and the scientific community.
There was a 9th Objective to be completed by WA Department of Fish and Wildlife. No more effort will be expended on that Objective.

PROJECT CLOSURE
This project will end in three years, and project years 2018, 2019, 2020 will be dedicated to gathering data from the last few returning adult steelhead and reporting. The soft closing of this project will allow irretrievable, unique information to be collected from brood year 2017 juveniles as well as brood year 2015, 2016, and 2017 returning adults and specific objectives such as evaluating genetic change to be met. In 2018, a study of juvenile fish fed low fat vs. typical diets and a comparison of gene expression of the two groups will be completed, adult brood year 2015 hatchery steelhead will be removed from Abernathy Creek, and natural origin steelhead will be passed upstream. Appropriate data and samples will be collected from the juveniles and adults. Subsequent years (2019 and 2020) will only require removing adult hatchery steelhead from Abernathy Creek and passing natural origin steelhead upstream after collecting data and samples. All three years will include staff time to analyze data, write reports, and publish peer reviewed papers. In summary, the soft closing of this project will:
• Allow us to finish important genetics and nutritional studies that may help to explain why hatchery origin fish may have lower relative reproductive success
• Prevent the investment in rearing steelhead from being wasted
• Allow return data for all Abernathy Creek hatchery origin adult steelhead to be collected
• Prevent steelhead smolts from being euthanized
• Prevent returning hatchery adult steelhead from having uncontrolled access to the upper Abernathy Creek watershed
• Allow important results about conservation hatcheries and interactions between wild and hatchery steelhead to be finalized and disseminated via reports and publications
Account Type(s):
Expense
Contract Start Date:
01/01/2020
Contract End Date:
12/31/2020
Current Contract Value:
$146,549
Expenditures:
$146,046

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Iaa
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Effective implementation and administration of project in FY 20 12/31/2020 12/31/2020
Obtain NEPA documents C: 165. NEPA 12/31/2020 12/31/2020
Maintain hatchery facilities D: 61. Maintain fish culture facilities 06/30/2020 06/30/2020
Hatchery Genetic Management Plan for Abernathy Creek steelhead E: 174. Update hatchery genetic management plan 06/30/2020 06/30/2020
Monitor PIT tagged NOR/HOR adult steelhead; collect & store PIT tag data F: 157. Monitor NOR/HOR steelhead; maintain antennas; collect & store PIT tag data 12/31/2020 12/31/2020
Capture adult HOR/NOR steelhead; release some above weir; retain some for integrated broodstoc G: 157. Capture and collect genetic samples from HOR/NOR steelhead; release NOR above weir 12/31/2020 12/31/2020
Calculate smolt-adult return rate for integrated conservation hatchery steelhead broodstock H: 162. Analyze/interpret data using additional information collected from returning steelhead 12/31/2020 12/31/2020
Submit manuscript to peer reviewed journals for publication. I: 183. Write papers and submit to peer reviewed journals for publication. 12/31/2020 12/31/2020
Completed Annual Report J: 132. Submit Progress Report for the period (Jan 2019) to (Dec 2019) 12/31/2020 12/31/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 183 Produce Journal Article
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Effective implementation and administration of project in FY 20
C 165 NEPA
D 61 Maintain fish culture facilities 12/16/2019
E 174 Update hatchery genetic management plan 11/12/2019
F 157 Monitor NOR/HOR steelhead; maintain antennas; collect & store PIT tag data 12/16/2019
G 157 Capture and collect genetic samples from HOR/NOR steelhead; release NOR above weir 12/16/2019
H 162 Analyze/interpret data using additional information collected from returning steelhead
I 183 Write papers and submit to peer reviewed journals for publication.
J 132 Submit Progress Report for the period (Jan 2019) to (Dec 2019)