Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74314 REL 98: 1991-047-00 EXP SHERMAN CREEK HATCHERY
Project Number:
Title:
Sherman Creek Hatchery Operations and Maintenance (O&M)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Columbia Upper 100.00%
Contract Number:
74314 REL 98
Contract Title:
1991-047-00 EXP SHERMAN CREEK HATCHERY
Contract Continuation:
Previous: Next:
74314 REL 62: 1991-047-00 EXP SHERMAN CREEK HATCHERY
Contract Status:
Closed
Contract Description:
This project is funded by the Bonneville Power Administration under directives by the Northwest Power Conservation Councils Columbia River Basin Fish & Wildlife Program, Resident Fish Substitution Measures, 1987 to current (Subbasin Plan), as partial mitigation for anadromous and resident fish losses in the blocked areas above Chief Joseph and Grand Coulee Dams.  Sherman Creek Hatchery provides artificial production on Lake Roosevelt consistent with the Lake Roosevelt Guiding Document and the Lake Roosevelt Fisheries Evaluation Project (LRFEP) recommendations. This proposal was prepared through the collective assistance of the entire Lake Roosevelt Fishery Enhancement Projects with the LRFEP as project lead.

The Sherman Creek Hatchery (SCH) is one of two facilities provided to partially mitigate for the loss of anadromous and resident fish due to the construction of Columbia River mainstem dams. The intent of this project is to continue working with the Lake Roosevelt artificial production projects to provide readily accessible sport and Tribal subsistence fisheries that are compatible and beneficial to the ecological conditions in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). It is located immediately adjacent to Lake Roosevelt at the mouth of Sherman Creek. This is three miles west of Kettle Falls, Washington and 101 miles upstream from Grand Coulee Dam.

SCH consisting of three large concrete raceways and support facilities was constructed by BPA in 1991, and became operational in April 1992 with first releases later that year. In 1999 SCH added twenty net pens at river mile 699 to facilitate increased rearing capabilities on Lake Roosevelt. Washington Department of Fish and Wildlife (WDFW) performs annual operations and maintenance with funding provided by BPA. In 1991 BPA and WDFW entered into a non-discretionary 25-year Memorandum of Agreement to fund the operations and maintenance.

Current operations under this project include when available use of native / indigenous stocks for propagation into Upper Columbia River Basin Waters.

The intent of this project is to continue working with the Lake Roosevelt artificial production projects to provide readily accessible sport and Tribal subsistence fisheries that are compatible and beneficial to the ecological conditions in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments). Artificial production has been determined a feasible method for sustaining viable fisheries in Lake Roosevelt and Banks Lake. The Washington Department of Fish and Wildlife, Spokane Tribe, Colville Confederated Tribes and Lake Roosevelt Development Association/Lake Roosevelt Volunteer Net Pen Project are cooperating in a comprehensive artificial production program to produce kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) for annual releases into the project area. The program consists of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery and Lake Roosevelt Rainbow Trout Net Pen Projects. The Lake Roosevelt and Banks Lake Fisheries Evaluation Programs monitor and evaluate release strategies and production methods for the aforementioned projects.

Between 1985 and 2019 the collective projects have annually produced up to 800,000 rainbow trout and 4 million kokanee salmon for release into Lake Roosevelt and 700,000 kokanee fry for Banks Lake.

The current annual release goals include: 250,000 triploid kokanee yearlings and 750,000 triploid rainbow trout yearlings for the project area.

All egg transfers will be spawned and shipped under current WDFW fish culture guidelines which include density, and fish health specifications found in part in US Fish & Wildlife Service, Fish Hatchery Management Manual, Piper, R.G., 1982.

State, tribes and federal government have developed a fish and egg health policy that sets standards for all fish production facilities in the state. The policy requires testing of fish and eggs before transferring them to another hatchery or planting them in streams outside their native waters. This policy regulates approximately 40 tribal facilities and more than 100 state and federal hatcheries. It is designed to prevent the spread of diseases among salmon in the state. Washington State Co-managers Fish Health Manual (WDFW, 1996).

Washington Department of Fish and Wildlife and Western Washington Treaty Indian Tribes. 1998. Co-managers of Washington fish health policy. Fish Health Division, Hatcheries Program. Washington Dept. Fish and Wildlife, Olympia.  
Account Type(s):
Expense
Contract Start Date:
03/01/2020
Contract End Date:
02/28/2021
Current Contract Value:
$333,140
Expenditures:
$333,140

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Obtain/maintain all applicable local, state, and federal necessary permits A: 165. Obtain / Maintain Permits 02/28/2021 02/28/2021
Release up to 225,000 rainbow trout. B: 176. BY 2018 Spokane (WDFW) Stock Rainbow Trout Fingerling Rearing and Release 07/01/2020 05/22/2020
Rear up to 300,000 rainbow trout in raceways and net pens for release into Roosevelt Lake. C: 176. BY 2019 Spokane (WDFW) Stock Rainbow Trout Fingerling Rearing 12/01/2020 11/12/2020
Produce Healthy Fish D: 60. Fish Health Monitoring 02/28/2021 02/28/2021
Maintain Sherman Creek Hatchery / Net Pens. E: 61. Sherman Creek Hatchery & Net Pens - Maintenance and Repair 02/28/2021 02/28/2021
Represent WDFW and BPA on the Lake Roosevelt Project and participate on tours within the blocked area. F: 99. Outreach and Education 02/28/2021 02/28/2021
Manage Sherman Creek Hatchery including Scope of Work and metrics reporting. G: 119. SOW, Accrual and Metrics Reporting 02/28/2021 02/28/2021
Monthly record keeping and reporting. H: 141. Other Reports for BPA 02/28/2021 02/28/2021
Produce Annual Operations and Maintenance Plan I: 174. Produce an Annual Operation Plan 02/28/2021 02/28/2021
Completed Annual Report J: 132. Submit Progress Report for the period (Jan 2019) to (Dec 2019) 02/28/2021 12/02/2020
Completed Annual Report L: 132. Submit Progress Report for the period (Jan 2017 ) to (Dec 2017) 11/30/2020 11/30/2020
Completed Annual Report M: 132. Submit Progress Report for the period (Jan 2018) to (Dec 2018) 11/30/2020 11/30/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sturgeon, White (A. transmontanus) - Lower Columbia River
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
Kokanee (Oncorhynchus nerka)
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
Trout, Rainbow (Oncorhynchus mykiss)
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain / Maintain Permits
B 176 BY 2018 Spokane (WDFW) Stock Rainbow Trout Fingerling Rearing and Release 02/04/2020
C 176 BY 2019 Spokane (WDFW) Stock Rainbow Trout Fingerling Rearing 02/04/2020
D 60 Fish Health Monitoring 02/04/2020
E 61 Sherman Creek Hatchery & Net Pens - Maintenance and Repair 02/04/2020
F 99 Outreach and Education
G 119 SOW, Accrual and Metrics Reporting
H 141 Other Reports for BPA
I 174 Produce an Annual Operation Plan 02/04/2020
J 132 Submit Progress Report for the period (Jan 2019) to (Dec 2019)
K 185 Periodic Status Reports for BPA
L 132 Submit Progress Report for the period (Jan 2017 ) to (Dec 2017)
M 132 Submit Progress Report for the period (Jan 2018) to (Dec 2018)