Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 218: 1997-013-25 EXP YKFP (LOWER YAKIMA) SUPPLEMENTATION COMPLEX O&M
Project Number:
Title:
Yakima River Operations and Maintenance (O&M) for Hatcheries and Acclimation Sites-Yakima/Klickitat Fisheries Project (YKFP)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
56662 REL 218
Contract Title:
1997-013-25 EXP YKFP (LOWER YAKIMA) SUPPLEMENTATION COMPLEX O&M
Contract Continuation:
Previous: Next:
56662 REL 194: 1997-013-25 EXP YKFP (LOWER YAKIMA) SUPPLEMENTATION COMPLEX O&M
  • 56662 REL 243: 1997-013-25 EXP YKFP (LOWER YAKIMA) PROSSER HATCHERY COMPLEX O&M
Contract Status:
Issued
Contract Description:
The Yakima Coho Project and the Yakima Fall Chinook Project are components of the Yakima/Klickitat Fisheries Project (YKFP).   The YKFP is a project designed to use artificial propagation in an attempt to re-establish, supplement, or increase natural production and harvest opportunities of anadromous salmonids while maintaining the long-term fitness of the target population, and while keeping ecological and genetic impacts on non-target species within specified limits.  The planning, implementation, and evaluation of this project were initially guided by the framework developed by the Regional Assessment of Supplementation Project (RASP 1992), but are currently being reviewed for compliance with the recommendations of the Hatchery Scientific Review Group for the Columbia Basin.  The YKFP is designed as an experiment to resolve uncertainties associated with supplementation.  As a "laboratory," the YKFP will help determine the role of supplementation in increasing natural production of anadromous salmonids.  Both controlled experiments and monitoring and evaluation of natural populations contribute information.    

Consistent with the Pacific Northwest Power Planning Council's (NPPC) Fish and Wildlife Program (NPPC 1994), the objectives of the YKFP are to:
• Enhance existing stocks of anadromous fish in the Yakima and Klickitat river basins, while maintaining genetics and ecological resources.
• Reintroduce stocks formerly present in the basins.
• Apply the knowledge gained through supplementation throughout the Columbia River Basin.
Overall Project objectives are achieved while adhering to all relevant environmental laws and regulations, including National Environmental Policy Act (NEPA) and Endangered Species Act (ESA) requirements
    
The YKFP endorses an adaptive management policy, which allows for Project objectives and strategies to change as new information becomes available from Project experiments, monitoring and evaluation, and literature reviews.  

Wild stocks of coho salmon (Oncorhynchus kisutch) were once widely distributed within the Columbia River Basin.  However, coho salmon probably became extinct in the Yakima River in the early 1980s.  For this reason, efforts to restore coho within the Yakima basin have relied largely upon releases of hatchery coho because wild stocks did not exist to supplement.  Hatchery coho releases began in the Yakima basin in 1983 with the first release of 324,000 Little White Salmon hatchery smolts.  At that time, the program was primarily for harvest augmentation.  

The goal of Yakima Coho Project is to determine the feasibility of re-establishing a naturally spawning coho population and a significant fall fishery for coho within the Yakima River Basin, while keeping adverse ecological impacts within specified limits.  The current status of the program indicates that some natural production is occurring, but the population is driven by the hatchery component.  In order to increase the opportunity for increased local adaptation, the program is planning to increase the number of naturally produced adults that will be used in the broodstock of the hatchery component.

The Yakima Klickitat Fisheries Project's (YKFP) ongoing fall Chinook research program aims to test the application of supplementation principles to the two lower Yakima River fall Chinook populations, the mainstem and Marion Drain stocks.  The Marion Drain stock spawns in Marion Drain.  Marion Drain is a man-made 19-mile irrigation return ditch constructed in the early 1900's.  The other Yakima stock, the "mainstem stock", is the most abundant stock in the Yakima sub-basin.  The mainstem stock is genetically similar to the composite stock of upriver bright (URB) fall Chinook in the Columbia River, and the Marion Drain stock is similar to Snake and Deschutes River fall Chinook. Genetic sampling has determined that the stocks are not distinct; the differences detected in 2006 are likely the result of the particularly small sample sizes available from Marion Drain.

Another component of the Fall Chinook program is to evaluate the feasibility of reestablishing the early fall/summer run population in the Yakima River between Wapato and Naches.  Summer run Chinook eggs are collected at Wells dam and transferred to Prosser/Marion Drain for incubation and early rearing, to be released into the lower Naches River.
Account Type(s):
Expense
Contract Start Date:
07/01/2020
Contract End Date:
06/30/2021
Current Contract Value:
$1,970,500
Expenditures:
$1,576,400

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shirley Alvarado Yakama Confederated Tribes No Interested Party shirley_alvarado@yakama.com (509) 865-5121x6304
Joe Blodgett Yakama Confederated Tribes Yes Supervisor joe_blodgett@yakama.com (509) 865-6262x6372
Michael Fiander Yakama Confederated Tribes Yes Contract Manager Michael_Fiander@yakama.com (509) 945-5894
Andre L'Heureux Bonneville Power Administration Yes COR allheureux@bpa.gov (503) 230-4482
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Michelle O'Malley Bonneville Power Administration Yes Backup COR mmomalley@bpa.gov (503) 230-5138
Michele Palmer Bonneville Power Administration Yes Env. Compliance Lead mlpalmer@bpa.gov (503) 230-5351
Rubi Rodriquez Yakama Confederated Tribes Yes Administrative Contact rubi_rodriquez@yakama.com (509) 865-5121x6335
Mel Sampson Yakama Confederated Tribes No Supervisor mel@yakama.com (509) 865-5121x6303
Charles Strom Yakama Confederated Tribes Yes Supervisor osprey@qwestoffice.net (509) 674-3701
Adrienne Wilson Yakama Confederated Tribes No Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Project implementation management and contract administration 06/30/2021 06/29/2021
Compliance documentation and assistance for environmental and cultural resource clearances B: 165. Environmental and Cultural Resource compliance assistance and clearance documentation 06/30/2021 06/29/2021
Safe and effective operation and maintenance of LYRSR sites and facilities. C: 61. Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery and the Acclimation Sites 06/30/2021 06/29/2021
Maintain fish health of LYRSR project fish D: 60. USFWS to Maintain Fish Health: Lower Yakima River Supplementation and Research Facilities 06/30/2021 06/29/2021
Reintroduce Coho to the Yakima Basin E: 176. Reintroduction of Coho in the Yakima Basin (BY 2019): Phase II (rear-acclimate-release) 06/30/2021 06/29/2021
Reintroduce coho to the Yakima Basin F: 176. Reintroduction of Coho in the Yakima Basin (BY 2020): Phase I (collect-spawn-incubate-rear) 06/30/2021 06/29/2021
Increase Yakima River Mainstem Fall Chinook through supplementation G: 176. Supplementation to Increase Yakima Mainstem Subyearling Fall Chinook (BY 2020) 06/30/2021 06/29/2021
Produce Early Fall/Summer Chinook (BY20) H: 176. Produce Early Fall/Summer Chinook: sub-yearlings (BY 2020) 06/30/2021 06/29/2021
Updated Annual Plans I: 174. Update (2020): a) Annual Operation Plan; and b) Annual Maintenance Plan 03/15/2021 03/15/2021
Produce monthly reports (Quarterly) J: 141. Monthly production status reports (BPA) 06/30/2021 06/29/2021
Successful Step-1 (Hatchery Master Plan) Review outcome K: 196. Complete Step-1: Respond to ISRP review and comment; continue collaborative discussions with BPA 06/30/2021 06/29/2021
Circular rearing tanks purchased and installed to improve and secure rearing conditions for juvenile fish L: 171. Circular Tanks (Prosser Hatchery): Replace failing equipment to maintain existing rearing capacity 06/30/2021 06/29/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 196 Council Step Process
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 196 Council Step Process
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project implementation management and contract administration
B 165 Environmental and Cultural Resource compliance assistance and clearance documentation
C 61 Operate & Maintain the Prosser Hatchery, Marion Drain Hatchery and the Acclimation Sites 07/07/2020
D 60 USFWS to Maintain Fish Health: Lower Yakima River Supplementation and Research Facilities 03/30/2020
E 176 Reintroduction of Coho in the Yakima Basin (BY 2019): Phase II (rear-acclimate-release) 04/06/2020
F 176 Reintroduction of Coho in the Yakima Basin (BY 2020): Phase I (collect-spawn-incubate-rear) 03/30/2020
G 176 Supplementation to Increase Yakima Mainstem Subyearling Fall Chinook (BY 2020) 03/30/2020
H 176 Produce Early Fall/Summer Chinook: sub-yearlings (BY 2020) 06/05/2020
I 174 Update (2020): a) Annual Operation Plan; and b) Annual Maintenance Plan 03/30/2020
J 141 Monthly production status reports (BPA)
K 196 Complete Step-1: Respond to ISRP review and comment; continue collaborative discussions with BPA
L 171 Circular Tanks (Prosser Hatchery): Replace failing equipment to maintain existing rearing capacity 07/07/2020
M 185 Periodic Status Reports for BPA
N 132 [Deliverable due next period]: Progress Report (2-year): 2020 and 2021 (01/01/2020 - 12/31/2021)