Contract 73354 REL 65: 2007-155-00 EXP DEVELOP STURGEON MASTER PLAN; SUPPORT DESIGN
Project Number:
Title:
Develop a Master Plan for a Rearing Facility to Enhance Selected Populations of White Sturgeon in the Columbia River Basin
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Columbia Lower Middle 100.00%
Contract Number:
73354 REL 65
Contract Title:
2007-155-00 EXP DEVELOP STURGEON MASTER PLAN; SUPPORT DESIGN
Contract Continuation:
Previous: Next:
73354 REL 50: 2007-155-00 EXP DEVELOP A MASTER PLAN FOR A REARING FACILITY
  • 73354 REL 82: 2007-155-00 EXP SUPPORT DESIGN OF YN STURGEON HATCHERY
Contract Status:
Issued
Contract Description:
Continuing contract for White Sturgeon Master Plan. A planned production level hatchery for white sturgeon to augment declining and depressed white sturgeon populations upstream of Bonneville Dam. Facility to be located near Toppenish WA on lands owned and managed by the Yakama Nation.
Account Type(s):
Expense
Contract Start Date:
09/01/2021
Contract End Date:
08/31/2022
Current Contract Value:
$144,457
Expenditures:
$70,419

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Contract Development & Direction B: 119. Contract Development and Direction 08/31/2022
Step 2: Master Plan Revisions C: 196. STEP 2: Master Plan Step 2 Tasks 08/31/2022
Sturgeon Working Group D: 189. Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin 08/31/2022
Step 2 Environmental Compliance Documents E: 165. STEP 2: Assist with NEPA process contracted by BPA 08/31/2022
Completed Water Plan for the Sturgeon Master Plan Facility F: 174. Water Evaluations at Marion Drain Hatchery Site 08/31/2022
Provide input to preliminary design process for the Marion Drain Sturgeon Facility G: 175. Preliminary Design of the Marion Drain Sturgeon facility 08/31/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS
  • 1 instance of WE 196 Council Step Process
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Contract Development and Direction
C 196 STEP 2: Master Plan Step 2 Tasks
D 189 Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin
E 165 STEP 2: Assist with NEPA process contracted by BPA
F 174 Water Evaluations at Marion Drain Hatchery Site
G 175 Preliminary Design of the Marion Drain Sturgeon facility
H 132 Annual progress report not required