Close Message
CBFish website will be offline for several hours starting at 5 PM today for maintenance. Thank you for your patience.
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 79905 REL 16: 1992-026-01 EXP GRMW SUBBASIN GAUGING STATION OPERATION 2022
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
79905 REL 16
Contract Title:
1992-026-01 EXP GRMW SUBBASIN GAUGING STATION OPERATION 2022
Contract Continuation:
Previous: Next:
79905 REL 9: 1992-026-01 EXP GRMW SUBBASIN GAUGING STATION OPERATION 2021
  • 90768 REL 2: 1992-026-01 EXP GRMW SUBBASIN GAUGING STATION OPERATION 2023
Contract Status:
Closed
Contract Description:
Objective

The project objective is to continue stream flow gauging at twelve locations in the Grande Ronde Basin.  The project will maintain annual flow records at these stations.  The data from these  stations, as well as the other stations, will provide flow information essential to water management, water quality control, and evaluation of restoration projects in the Grande Ronde Basin.

The Grande Ronde Model Watershed Program Operations - Action Plan identifies both water quantity and quality as major issues/concerns in the  Grande Ronde Basin.  Stream flow gauging stations provide essential data for water management decisions and evaluating success of water conservation restoration projects.  Long-term continuous stream flow monitoring is necessary.  

Currently there are seven gauging stations in the Upper and Middle Grande Ronde (Union County) and five in the Lower Grande Ronde (Wallowa County) funded in this SOW.  All the stations have flow records dating back at least 20 years.  The Grande Ronde River near Perry river reach has continuously recorded flows since 1904 and provides hourly flow information via satellite telemetry and internet support provided by the National Weather Service.   The Upper Catherine Creek station has continuously recorded flows since 1912.  Five stations are cooperatively supported by the Forest Service (USFS funds) and operated out of the local Water Master office.  Two sites; Catherine Creek at Union, and Grande Ronde River near Perry are cooperative stations operated out of the local Watermaster Office.  Five gauges exist in Wallowa County including two each on the Lostine and Wallowa Rivers and one on Bear Creek.  The upper Lostine and Bear Creek sites have been in operation since the early 1900's with both Wallowa sites and the Lower Lostine having been established in 1995.

Gauging Stations to be Monitored:
Grande Ronde River (2)
Meadow Creek (2)
Five Point Creek
North Fork Catherine Creek
Catherine Creek
Lostine River (2)
Wallowa River (2)
Bear Creek

This contract addresses the operation of twelve gauges in the Grande Ronde Basin; seven in Union County and five in Wallowa County.

The operation of gauging sites in the Grande Ronde Basin has depended on support from BPA and OWEB for the last 20-years.  In the past USGS operated and helped funds more gauge stations in the basin than they currently do, and at this time they only operate 3 and funds 2, and none of these 12 are included in that list. The BOR historically operated or helped fund gauge stations in the basin but is no longer able to partially support any of the stations in the Grande Ronde Basin.  

Clarification:  Water years runs from October 1 through September 30 of the following year and there are overlapping work elements so several points of clarification need to be made:

1.  A water year starts on October 1 and ends on September 30 of the following year.
2.  Provisional (non final) flow record is compiled immediately following the conclusion of the water year and this work is typically done between October 1 and December 31.
3.  Final flow record is completed following provisional record completion and this work is typically done between January 1 and April 1.  
4.  All provisional and final record production is completed after data is collected for one complete water year.
5.  Final flow record is not typically delivered until 7 months post water year completion.
6.  As flow data is collected for one water year provisional and final record is compiled for the previous water year.
Account Type(s):
Expense
Contract Start Date:
10/01/2021
Contract End Date:
09/30/2022
Current Contract Value:
$79,692
Expenditures:
$79,692

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Lindsey Arotin Bonneville Power Administration Yes Env. Compliance Lead ldarotin@bpa.gov (503) 230-4039
Mary Estes Grande Ronde Model Watershed Foundation Yes Administrative Contact mary@grmw.org (541) 663-0570
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Kayla Morinaga Grande Ronde Model Watershed Foundation Yes Contract Manager kayla@grmw.org (541) 663-0570
Jesse Steele Grande Ronde Model Watershed Foundation Yes Supervisor jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Alexandra Towne Grande Ronde Model Watershed Foundation Yes Interested Party alex@grmw.org (541) 663-0570
Sean Welch Bonneville Power Administration Yes F&W Approver spwelch@bpa.gov (503) 230-7691
Seth White Columbia River Inter-Tribal Fish Commission (CRITFC) No Interested Party whis@critfc.org (503) 731-1300
Ian Wilson Grande Ronde Model Watershed Foundation Yes Technical Contact ian@grmw.org (541) 426-0389
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Complete environmental compliance process A: 165. Environmental compliance documentation 09/30/2022 09/30/2022
Complete data collection for the water year beginning 10/1/2021 and ending 9/30/2022. B: 157. Collect stream flow measurements on twelve Grande Ronde Basin gauging stations 09/30/2022 09/30/2022
Complete provisional and final flow records C: 162. Generate provisional and final flow records 09/30/2022 09/30/2022
Effective implementation management and timely contract administration D: 119. Project administration 09/30/2022 09/30/2022
Completed Annual Report E: 132. 2021 Water Year Report - 10/1/20 - 9/30/21 09/30/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance documentation
B 157 Collect stream flow measurements on twelve Grande Ronde Basin gauging stations 07/30/2021
C 162 Generate provisional and final flow records
D 119 Project administration
E 132 2021 Water Year Report - 10/1/20 - 9/30/21
F 185 Quarterly Status Reports