Close Message
CBFish website will be offline for several hours starting at 5 PM today for maintenance. Thank you for your patience.
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74017 REL 108: 1999-017-00 EXP LAPWAI CREEK WATERSHED RESTORATION
Project Number:
Title:
Protect and Restore Lapwai Creek Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
74017 REL 108
Contract Title:
1999-017-00 EXP LAPWAI CREEK WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
74017 REL 88: 1999-017-00 EXP LAPWAI CREEK WATERSHED RESTORATION
  • 84044 REL 24: 1999-017-00 EXP LAPWAI CREEK WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
PROJECT/CONTRACT HISTORY:

Our mission is to work proactively within the region’s diverse landscapes to restore and protect the ecological processes of the Lapwai Creek watershed to the greatest extent possible.  We will work to rehabilitate habitat that will support healthy, self-sustaining fish populations and provide clean water for the benefit of all.  We will work within present challenges and opportunities toward achieving a balance whereby all communities can thrive for generations to come.

Hé-yey, Nez Perce for steelhead or rainbow trout (Oncorhynchus mykiss), are a culturally and ecologically significant resource of the Lapwai Creek watershed and compose a portion of the federally listed Snake River Basin Steelhead distinct population segment (DPS).  The majority of the Lapwai Creek drainage is federally identified as critical habitat for this DPS while also providing habitat for the federally listed Snake River Nacó’x, or fall Chinook (Oncorhynchus tshawytscha), evolutionarily significant unit (ESU).  The Nez Perce Soil and Water Conservation District (District) and the Nez Perce Tribe Department of Fisheries Resources Management- Watershed (Tribe), in an effort to support the continued existence of these and other aquatic species, have developed the "Strategy for the Ecological Restoration of Lapwai Creek Watershed" document (2009) to direct efforts and resources toward the highest priority restoration projects and areas of the Lapwai Creek watershed. This restoration strategy is attached to this project in CBFish under contract 46784.

The prioritization framework considered four aspects to determine the relative importance of performing restoration in a certain area: density of critical fish species, physical condition of the habitat, water quantity, and water quality.  It was established, through vigorous data analysis within these four areas, that the top three areas to pursue restoration within the Lapwai Creek watershed are Lapwai Creek from stream km 17-34, Sweetwater Creek from the mouth to km 13, and from the mouth of Lapwai Creek to km 17.

Presence of steelhead within the Lapwai Creek watershed has been documented through the following work that has been conducted to various degrees since 2003: 1) the 2003-2006 BPA funded project to collect juvenile steelhead fish distribution and abundance data (this data set was the basis of the watershed restoration plan), 2) juvenile steelhead density monitoring conducted in 2010-2019 by University of Idaho, and 3) an adult PIT tag study conducted by the Nez Perce Tribe from 2010-2019. Based upon the adult data indicating that Mission Creek and Sweetwater Creek have similar numbers of adult fish, these tributaries will continue to be a priority for restoration. Instream habitat in mainstem Lapwai Creek will also be addressed, as described in this contract through the Reach 14 and the highway pullout removal projects.  

SUMMARY OF FY22 CONTRACT:

The "Strategy for the Ecological Restoration of Lapwai Creek Watershed" was the main reference for prioritizing implementation and developing the FY22 SOW.  Within this document the two highest priority reaches within the Lapwai Creek drainage were Upper Lapwai Creek and Lower Sweetwater Creek.  

Implementation projects planned for the 2022 SOW include the following:

A total of 6 sites, treating 17.35 acres.

o  Tribal Trust Unit 3123 Spring Creek Raceway- implementation of noxious weed control and maintenance of riparian planting on 1.0 acre.
o  Tribal Trust Unit 3123 Spring Creek Wetlands- implementation of noxious weed control on 1.0 acre.
o  Tribal Trust Unit 3125 Fisheries Building -  implementation of noxious weed control and maintenance of riparian planting on 0.4 acre.
o  Tribal Allotment 365 - implementation of noxious weed control and maintenance of riparian plantings on 5.45 acres.
o  Tribal Allotment 419A - implementation of noxious weed control on 9.0 acres.
o  Lutes Wetland adjacent to Tribal Allotment 350 - implementation of noxious weed control and maintenance of plantings on 0.5 acre.
    
Instream Complexity - Implement Post Assisted Log Structure (PALS) project on Lapwai Creek - Tribal Allotment 3125.  This project falls within the Lapwai Creek reach identified in the Strategy for Ecological Restoration of Lapwai Creek Watershed document.  This area ranked third in priority. The PALS project is intended to improve instream habitat complexity and will provide additional benefits in a portion of Lapwai Creek that has experienced an increase in base water flows (an additional 4.5 cfs at 50 degrees) due to the 2017 Lewiston Orchards Water and Land Title Exchange Project.

Floodplain Restoration - Reach 14 --  This reach of Lapwai Creek holds the highest density of juvenile steelhead in the Lapwai Creek watershed (Chandler & Parot, 2003), and was ranked by Lapwai Creek Watershed Ecological Restoration Strategy (Richardson, Rasmussen & Chandler, 2008) as the highest priority area for targeting restoration to improve steelhead habitat and populations. Stabilizing this reach of Lapwai Creek and restoring natural stream processes and functions will increase the availability of high quality rearing habitat for juvenile steelhead.

Floodplain Restoration -- In coordination with the Idaho Transportation Department's Highway 95 Culdesac Canyon passing lane improvement project, NPT has the opportunity to remove one of the existing streamside pullouts in the summer/fall of 2022 and will re-vegetate the disturbed site with a native grass/forb mix. This will reclaim some of the historic floodplain that Lapwai Creek lost due to the construction of Highway 95.

Outreach and Education-- Education and outreach will continue to the general public, fellow professionals, high school and college students, and especially elementary school students, e.g. the  "Steelhead in the Classroom" program for 6th graders. Partners include the Lapwai School District, Lewiston School District, and Idaho Department of Fish and Game.
Account Type(s):
Expense
Contract Start Date:
05/01/2022
Contract End Date:
04/30/2023
Current Contract Value:
$499,803
Expenditures:
$499,803

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Daniel Affonso Bonneville Power Administration No CO Assistant dxaffonso@bpa.gov (503) 230-3893
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Bobby Hills Nez Perce Tribe Yes Interested Party bobbyh@nezperce.org (208) 621-3537
Travis House Nez Perce Tribe Yes Interested Party thouse@nezperce.org (208) 621-4739
David Kaplowe Bonneville Power Administration Yes Supervisor djkaplowe@bpa.gov (503) 230-5365
Shawn Kaschmitter Nez Perce Tribe Yes Contract Manager shawnk@nezperce.org (208) 621-4728
Eric Leitzinger Bonneville Power Administration Yes F&W Approver ejleitzinger@bpa.gov (503) 230-3534
Jessica Power Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Virginia Preiss Bonneville Power Administration Yes COR vdpreiss@bpa.gov (503) 230-3619
Carolyn Sharp Bonneville Power Administration Yes Env. Compliance Lead casharp@bpa.gov (503) 230-5206
Emmit Taylor, Jr. Nez Perce Tribe Yes Interested Party emmitt@nezperce.org (208) 621-3544
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
ESA/NEPA/NHPA Compliance complete B: 165. ESA/NEPA/NHPA Compliance for Implementation Projects 04/30/2023 02/16/2023
1.0 Acre Maintenance of Native Vegetation on TU 3123 Spring Creek Raceway C: 198. Maintain Native Vegetation and Treat Exotic Invasive Plant Species on TU 3123 Spring Creek Raceway and Wetland 04/30/2023 04/30/2023
0.40 Acres Maintenance of Native Vegetation on TU 3125 Fisheries Building D: 198. Maintain Native Vegetation and Treat Exotic Invasive Plant Species TU 3125 Fisheries Building 04/30/2023 04/30/2023
5.45 Acres of Plant maintenance and weed control at TA 365 E: 198. Maintain Native Vegetation and Treat Exotic Invasive Plant Species on TA 365 04/30/2023 04/30/2023
0.5 acres of plant maintenance and weed control at Lutes wetland, adjacent to TA 350 F: 198. Maintain Native Vegetation and Treat Exotic Invasive Plant Species at Lutes Wetland 04/30/2023 04/30/2023
9.0 Acres of Invasive Plant Management on TA 419A G: 198. Treat Exotic Invasive Plant Species and seed native grasses on TA 419A 04/30/2023 04/30/2023
Lapwai Creek Education and Outreach H: 99. Lapwai Creek Project Area Education and Outreach 04/30/2023 03/31/2023
Effective implementation management and timely contract administration I: 119. Contract Management and Administration 04/30/2023 03/31/2023
Completed Annual Report K: 132. Complete and upload report for the period May 2021 - April 2022 10/31/2022 06/13/2022
Lapwai Creek - TU 3125 PALS Installation L: 29. Lapwai Creek 3125 Post Assisted Log Structure (PALS) Installation 04/30/2023 01/11/2023
Completed channel construction at Lapwai Creek Reach 14 M: 30. Lapwai Creek Reach 14 Floodplain Restoration 04/30/2023 10/31/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 5 instances of WE 198 Maintain Vegetation
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 ESA/NEPA/NHPA Compliance for Implementation Projects
C 198 Maintain Native Vegetation and Treat Exotic Invasive Plant Species on TU 3123 Spring Creek Raceway and Wetland 04/11/2022
D 198 Maintain Native Vegetation and Treat Exotic Invasive Plant Species TU 3125 Fisheries Building 04/11/2022
E 198 Maintain Native Vegetation and Treat Exotic Invasive Plant Species on TA 365 04/11/2022
F 198 Maintain Native Vegetation and Treat Exotic Invasive Plant Species at Lutes Wetland 04/11/2022
G 198 Treat Exotic Invasive Plant Species and seed native grasses on TA 419A 04/11/2022
H 99 Lapwai Creek Project Area Education and Outreach
I 119 Contract Management and Administration
J 132 Submit Progress Report for the period May 2022 to April 2023
K 132 Complete and upload report for the period May 2021 - April 2022
L 29 Lapwai Creek 3125 Post Assisted Log Structure (PALS) Installation 04/11/2022
M 30 Lapwai Creek Reach 14 Floodplain Restoration 07/26/2022
N 29 Lapwai Creek Highway 95 Pullout Removal