Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 90647: 1998-019-00 EXP WIND RIVER WATERSHED - UCD
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
90647
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED - UCD
Contract Continuation:
Previous: Next:
88322: 1998-019-00 EXP WIND RIVER WATERSHED - UCD
  • 92814: 1998-019-00 EXP WIND RIVER WATERSHED - UCD
Contract Status:
Closed
Contract Description:
This contract supports and is part of the Wind River Watershed Project, initiated in 1998.  The project's focus is on restoration of Wind River steelhead.  In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical.  In 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia river as "threatened" under the Endangered Species Act.  Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery/restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative.  Project participants are the Underwood Conservation District (UCD), US Geological Survey, US Forest Service, and Washington Department of Fish and Wildlife.  

This contract continues Underwood Conservation District's support and participation in the project.  UCD will provide habitat restoration work in support of the recovery of the Wind River summer steelhead stock in 2022 and 2023.  During this contract work will focus on developing designs for the Hollis Creek Fish Passage Project, and Little Wind Phase V restoration, vegetation planting removal and maintenance, and  initiating permitting for the future habitat projects in the watershed, based on the current planned project list proposed to ISRP/NPCC and attached to this contract. Additionally UCD will coordinate with partners for future work which potentially includes: habitat enhancement at Martha Creek, eco-block removal on the Middle Wind River, restoration projects on Columbia Land Trust lands on the Wind River, and further restoration actions on the Little Wind River as outlined in the habitat strategy, and passage improvement/maintenance at the mouth of the Little Wind River.  Landowner willingness, feasibility and EC requirements are still being determined which will indicate which projects can move forward initially.  

Future projects have been identified and are being developed with partners and landowners, and UCD will coordinate closely with BPA to plan future project work for subsequent contract renewals.  UCD prioritizes projects that were identified and prioritized during the creation of the Wind River Habitat Restoration Strategy in 2017 (https://www.lcfrb.gen.wa.us/windriver).  However, UCD’s work on habitat restoration is influenced by many factors, including landowner willingness, input from BPA, and watershed partners, USFS, USGS, and WDFW.  Additional issues such as feasibility, access, funding, permitting, and landowner readiness often dictate which projects can move forward.  

As Skamania County continues to plan and implement High Bridge Park improvements to prevent erosion and turbidity and restore riparian vegetation along the mainstem of the Wind River (at one of the only access points along the Wind River canyon, a priority migratory and rearing reach for steelhead), UCD will continue to provide technical assistance and support toward riparian habitat improvement and best practices.  Other work such as producing periodic (quarterly) status reports, the annual progress report, coordinating with project partners, producing environmental compliance documentation, stream temperature monitoring, as well as managing and administering the project will be funded at levels to allow continued maintenance of these activities.

UCD's work benefits greatly through coordination and information sharing with BPA partners, USGS, WDFW, and USFS.  The RME partners provide integral information on fish use and abundance, habitat bottlenecks and capacity constraints.  This local expertise ensures that 1.) we are prioritizing habitat work where it is needed most and provides the biggest lift for steelhead, and 2.) we are able to get feedback and even biological monitoring in some cases, showing the effectiveness of restoration work.  In addition, coordination with USFS partners ensures that 1.) we can coordinate and partner on key, high priority projects, and 2.) we can share expertise and lessons learned about project methodologies for best results in the watershed.
Account Type(s):
Expense
Contract Start Date:
07/01/2022
Contract End Date:
06/30/2023
Current Contract Value:
$72,510
Expenditures:
$72,510

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Joshua Ashline Bonneville Power Administration Yes COR jdashline@bpa.gov (503) 230-3862
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Bengt Coffin Underwood Conservation District (UCD) No Supervisor bengtucd@gmail.com (509) 590-9165
Kristina Eilts Bonneville Power Administration Yes Env. Compliance Lead keeilts@bpa.gov (503) 230-4407
Ann Gross Underwood Conservation District (UCD) Yes Administrative Contact ann@ucdwa.org (509) 493-1936
Carly Lemon Underwood Conservation District (UCD) No Technical Contact carly@ucdwa.org (509) 493-1936
Jessica Power Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Dan Richardson Underwood Conservation District (UCD) Yes Technical Contact dan@ucdwa.org (509) 493-1936
Jan Thomas Underwood Conservation District (UCD) Yes Technical Contact jan@ucdwa.org (509) 493-1936
Tova Tillinghast Underwood Conservation District (UCD) Yes Contract Manager tova@ucdwa.org (509) 493-1936
Jesse Wilson Bonneville Power Administration Yes F&W Approver jcwilson@bpa.gov (503) 230-4506


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Effective implementation management and timely contract administration A: 119. Manage and Administer Projects 06/30/2023 06/29/2023
Environmental Compliance Complete B: 165. Environmental Compliance 06/30/2023 06/29/2023
Watershed Partner Coordination C: 191. Coordinate Project Activities with Project Partners 06/30/2023 06/29/2023
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces D: 114. Identify and Develop Potential Steelhead Habitat Restoration Projects 06/30/2023 06/29/2023
Hollis Creek Fish Passage Design E: 175. Hollis Creek Fish Passage Design 06/30/2023
Little Wind Phase V Design Complete F: 175. Little Wind River, Phase V, Habitat Enhancement Project Design Planning 06/30/2023
Riparian Planting Complete G: 47. Plant Vegetation at High Bridge (carried forward from previous contracts) 06/30/2023 06/29/2023
Noxious Weeds Treated Throughout Watershed H: 199. Watershed-wide Weed Treatment 06/30/2023 06/29/2023
Weeds treated at Stabler Bend floodplain I: 198. Noxious Weed Treatment (carried forward from previous contract) 06/30/2023 06/29/2023
Produce accessible, error-checked datasets J: 157. Water Quality Monitoring 06/30/2023 06/29/2023
Completed Annual Report K: 132. Submit Progress Report for the Period Jan 01, 2022 - Dec 31, 2022 06/30/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer Projects
B 165 Environmental Compliance
C 191 Coordinate Project Activities with Project Partners
D 114 Identify and Develop Potential Steelhead Habitat Restoration Projects
E 175 Hollis Creek Fish Passage Design 05/24/2022
F 175 Little Wind River, Phase V, Habitat Enhancement Project Design Planning 05/24/2022
G 47 Plant Vegetation at High Bridge (carried forward from previous contracts)
H 199 Watershed-wide Weed Treatment 03/24/2022
I 198 Noxious Weed Treatment (carried forward from previous contract) 05/24/2022
J 157 Water Quality Monitoring 03/16/2022
K 132 Submit Progress Report for the Period Jan 01, 2022 - Dec 31, 2022
L 185 Periodic Status Reports for BPA