Contract 84042 REL 22: 1994-044-00 EXP SAGEBRUSH FLAT WILDLIFE MITIGATION
Project Number:
Title:
Sagebrush Flat Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Columbia Upper Middle 100.00%
Contract Number:
84042 REL 22
Contract Title:
1994-044-00 EXP SAGEBRUSH FLAT WILDLIFE MITIGATION
Contract Continuation:
Previous: Next:
74314 REL 148: 1994-044-00 EXP SAGEBRUSH FLAT WILDLIFE MITIGATION
  • 84042 REL 57: 1994-044-00 EXP SAGEBRUSH FLAT WILDLIFE MITIGATION
Contract Status:
Closed
Contract Description:
The Sagebrush Flat Wildlife Area (SFWA) was approved as a wildlife mitigation project in 1992 and was re-approved for operations and maintenance (O&M) funding in 2002 as part of the Northwest Power and Conservation Council's (NPCC) Provincial /Sub-basin Planning Process. This project is located within the Columbia Plateau Province (Crab Creek Sub-basin) and partially addresses adverse impacts caused by the construction of Chief Joseph and Grand Coulee hydroelectric dams. Wildlife habitat protection and enhancement efforts to meet mitigation objectives have been underway since 1995 on the Sagebrush Flat Wildlife Area. Continued operation and maintenance activities funded by BPA are necessary to maintain and enhance wildlife habitat benefits and to ensure BPA's mitigation obligation is met. These activities are essential to further the goal of the Washington Department of Fish and Wildlife to protect and enhance shrub-steppe and other habitats necessary to recover and sustain populations of pygmy rabbits, sage grouse and sharp-tailed grouse.

Management actions planned for this contract period include continued weed control on all units plus shrub-steppe restoration and maintenance activities on up to 205 acres of former agricultural fields including mowing, summer fallowing and seeding and interseeding as needed. Roads, fences, parking areas and signs will be maintained, repaired and replaced as needed. Debris and garbage will be removed and disposed. Other quotidian tasks will be performed as needed or required.  
Account Type(s):
Expense
Contract Start Date:
10/15/2022
Contract End Date:
10/31/2023
Current Contract Value:
$427,687
Expenditures:
$427,687

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Work Element B complete as Determined necessary A: 165. NEPA, ESA, Cultural Resource Compliance 10/31/2023 10/31/2023
Upland bird feeders filled B: 36. Fill upland bird feeders. 10/31/2023 10/31/2023
Improvement of riparian habitat and upland shrub on the Bridgeport Unit complete. C: 47. Maintain, enhance, and expand riparian and upland shrub habitat - Bridgeport Unit 10/31/2023 10/31/2023
Bridgeport Unit - Corral field, field preparation for restoration for FY 2023 completed. D: 199. Prepare old agricultural fields for shrub-steppe restoration - Bridgeport Unit 08/31/2023 08/31/2022
Maintain extant and restored habitat and control noxious weeds. E: 198. Maintain extant/restored vegetation and control noxious weeds 08/31/2023 08/31/2023
Maintenance of buildings, vehicles, equipment, headquarter area, etc. complete. F: 186. Maintain buildings, vehicles, equipment, headquarters area, fences, gates, signs, area boundary and other wildlife area infrastructure developments 10/31/2023 10/31/2023
Maintenance of roads, parking areas, buildings and other physical improvements completed. H: 188. Maintain roads, parking areas and signs 10/31/2023 10/31/2023
Benefit/Income/Spending Report I: 194. Manage 2 CRP leases (10yr) and 1 SAFE lease (15yr). 10/31/2023 10/31/2023
Effective implementation management and timely contract administration K: 119. General project administration 10/31/2023 10/31/2023
Debris removed L: 27. Remove fire debris 10/31/2023 10/31/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 27 Remove Debris
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 NEPA, ESA, Cultural Resource Compliance
B 36 Fill upland bird feeders. 11/01/2022
C 47 Maintain, enhance, and expand riparian and upland shrub habitat - Bridgeport Unit 11/01/2022
D 199 Prepare old agricultural fields for shrub-steppe restoration - Bridgeport Unit 11/01/2022
E 198 Maintain extant/restored vegetation and control noxious weeds 11/01/2022
F 186 Maintain buildings, vehicles, equipment, headquarters area, fences, gates, signs, area boundary and other wildlife area infrastructure developments 11/01/2022
G 186 Repair West Foster Creek weirs damaged by spring runoff - Bridgeport unit 11/01/2022
H 188 Maintain roads, parking areas and signs 11/01/2022
I 194 Manage 2 CRP leases (10yr) and 1 SAFE lease (15yr). 11/01/2022
J 132 Submit Progress Report for previous contract period.
K 119 General project administration
L 27 Remove fire debris 11/01/2022
M 185 Periodic Status Reports for BPA