Contract 56662 REL 276: 2008-470-00 EXP YAKAMA NATION LAMPREY
Project Number:
Title:
Yakama Nation Ceded Lands Lamprey Evaluation and Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 5.00%
Methow 15.00%
Wenatchee 15.00%
Columbia Gorge Big White Salmon 5.00%
Klickitat 5.00%
Wind 5.00%
Columbia Plateau Yakima 40.00%
Mainstem - 10.00%
Contract Number:
56662 REL 276
Contract Title:
2008-470-00 EXP YAKAMA NATION LAMPREY
Contract Continuation:
Previous: Next:
56662 REL 253: 2008-470-00 EXP YAKAMA NATION LAMPREY
Contract Status:
Issued
Contract Description:
The goal of the Yakama Nation Pacific Lamprey Project (YN PLP) is to restore natural production of Pacific lamprey in the YN Ceded Lands, specifically, the Yakima, Klickitat, White Salmon, Little White Salmon, Wind, Rock, Wenatchee, Methow, and Entiat river systems. A growing body of information now exists about lamprey abundance and distribution or limiting factors throughout the Ceded lands as a result of work conducted by YN PLP and partners. Since 2009, the YN PLP has begun performing field surveys in many of these subbasins and has documented wild larval/juvenile Pacific lamprey throughout this geographic range, albeit in very low numbers. In many watersheds where translocation has not occurred, we now believe Pacific lamprey are either extirpated or "functionally" extirpated. In watersheds that have received adult translocation releases, on the other hand, larval Pacific Lamprey distribution, occupancy, and relative abundance have all consistently increased one to two years after the translocation.

One of the four primary objectives that will continue over the next couple years is to survey key habitats collecting baseline information that will be used to document long-term status and trend of these local populations and to help develop long-term restoration strategies for each of the named subbasins. Another key objective within this time frame is to identify the threats and limiting factors in each of the subbasins within the YN Ceded Lands and to build the "road map" necessary to fix or resolve these various issues. Another important objective is to implement the cost effective solutions that are available through collaboration and partnership. The final key objective will be to continue evaluating potential supplementation practices, including artificial propagation of larvae/juvenile and translocation of adult lamprey. This last objective is important in developing key management tools to help re-establish or supplement natural populations in selected watersheds.

Over the next year the YN PLP will continue focusing efforts in surveying key habitats in the Yakima, Entiat, Wenatchee, Methow, White Salmon, and other subbasins within the Ceded Lands for lamprey presence / absence, relative abundance, and distribution. We will continue to establish and survey long-term "index-sites" in each of the Ceded Land subbasins, from which to measure status and trend over time. We will evaluate and identify primary limiting factors and potential "threats" in the Ceded Land subbasins and will focus on solutions that will eliminate or reduce the identified impacts. During the end of irrigation season, we will continue to rescue lamprey in dewatered irrigation diversion facilities (with a focus on the facilities that entrain the most number of lamprey). Additionally, the YN PLP intends to finalize and begin implementing a 10-year supplementation research plan, which will identify primary supplementation objectives, locations for larva and adult out-plantings and an associated monitoring strategy. Regional coordination and outreach will also be a key element of the project to maintain and strengthen our partnerships in restoration and to reach out to the public (tribal and non-tribal) about the importance of lamprey.

The long-term project objectives are as follows:
-Consolidate and summarize current and historical information related to Pacific lamprey distribution and abundance within the YN Ceded Lands.
-Monitor larval/juvenile production using a variety of monitoring tools (e.g. genetics, screw traps, VIE and PIT tags, length and weight data, etc.).
-Identify current habitat strongholds for larval/juvenile rearing. Quantify and index relative densities of larvae/juvenile.
-Describe known and/or potential factors, including habitat characteristics, which contribute to relatively strong or weak larval/juvenile growth and production in key (or index) watersheds.    
-Identify the key limiting factors that prevent larvae/juvenile from successfully hatching, staging and achieving high levels of productivity in preferred habitats.
-Monitor adult production using a variety of monitoring tools (e.g. dam counts, adult traps, weirs, PIT and radio tags, length and weight data, etc.).
-Identify key areas where adults hold and/or spawn and identify environmental / physiological conditions that trigger spawning to occur.
-Describe known and/or potential factors, including habitat characteristics, which are key to adult holding and/or spawning.
-Identify actions that can be taken to restore or enhance adult holding and spawning.
-Identify adult and larval/juvenile lamprey migration characteristics.
-Identify known and suspected passage barriers (i.e. irrigation diversions and dams) and key limiting factors that prevent adult and larval/juvenile lamprey from successfully migrating (or spawning).
-Initiate small scale re-introductions of artificially propagated lamprey into selected areas within the Yakima Subbasin.
-Continue to translocate adults into watersheds where they have been extirpated, or nearly so, and to monitor productivity of these translocations.
Account Type(s):
Expense
Contract Start Date:
03/01/2023
Contract End Date:
02/29/2024
Current Contract Value:
$536,246
Expenditures:
$428,997

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
James Barron Bonneville Power Administration Yes COR jmbarron@bpa.gov (503) 230-5706
Tyler Beals Yakama Confederated Tribes Yes Technical Contact beat@yakamafish-nsn.gov (509) 831-2267
David Blodgett III Yakama Confederated Tribes No Supervisor blod@yakamafish-nsn.gov
Deborah Docherty Bonneville Power Administration Yes Interested Party dldocherty@bpa.gov (503) 230-4458
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Frances Hill Yakama Confederated Tribes No Administrative Contact hilf@yakamafish-nsn.gov
Tana Hoptowit Yakama Confederated Tribes No Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Ralph Lampman Yakama Confederated Tribes Yes Contract Manager lamr@yakamafish-nsn.gov (509) 388-3871
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Dave'y Lumley Yakama Confederated Tribes No Technical Contact lumd@yakamafish-nsn.gov (509) 480-8596
Jessica Power Bonneville Power Administration Yes Administrative Contact jdpower@bpa.gov (503) 230-4023
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Ensure Environmental Compliance Requirements Have Been Met A: 165. Ensure Environmental Compliance Requirements have been met 02/28/2024 02/28/2024
Produce Propagation, Rearing, & Outplanting Plan B: 174. Produce Propagation, Rearing, & Outplanting Plan 06/01/2023 06/01/2023
Larval/Juvenile Lamprey Surveys in the YN Ceded Lands C: 157. Larval/Juvenile Lamprey Surveys in the YN Ceded Lands (*with eDNA laboratory analyses) and Other Field / Lab Data 02/28/2024 02/28/2024
Lamprey Survey and Rescue in Irrigation Canals D: 28. Lamprey Survey and Rescue in Irrigation Canals 02/28/2024 02/28/2024
Participation in Public Outreach E: 99. Participation in Public Outreach 02/28/2024 02/28/2024
Participate in Local and Regional Efforts F: 161. Participate in Local and Regional Efforts 02/28/2024 02/28/2024
PIT & Floy Tag Adult Lamprey G: 158. PIT and Floy Tag Adult Lamprey 02/28/2024 02/28/2024
PIT Tag Juvenile/Larval Lamprey H: 158. PIT, VIE & Acoustic Tag Juvenile/Larval Lampreys 02/28/2024 02/28/2024
Conduct the 3-Step Process for Lamprey Artificial Propagation Activities (with CRITFC) I: 196. Conduct the 3-Step Process for Lamprey Artificial Propagation Activities (with CRITFC) 02/28/2024 02/28/2024
Conclusions from Artificial Propagation and Rearing research J: 176. Rearing - Research into Artificial Propagation and Early Life Stage Rearing 02/28/2024 02/28/2024
Report out on Outplant Early Life Stage Lamprey in the Yakima Subbasin K: 157. Release - Early Life Stage Lamprey Outplanting Monitoring 02/28/2024 02/28/2024
Adult Lamprey Translocation L: 66. Translocate Adult Lamprey from the Columbia River 02/28/2024 02/28/2024
Adult Lamprey Used for Artificial Propagation Research M: 66. Collect Adult Lamprey for research into artifical propagation 02/28/2024 02/28/2024
Data Input and Analysis N: 162. Data Input and Analysis (*& subcontract with Confluence Aquatics [John Crandall]) 02/28/2024 02/28/2024
Deliverable: Maintain and Monitor Lamprey Passage Structures O: 186. Maintain and monitor lamprey passage structures 02/28/2024 02/28/2024
Cultural and Scientific Draft Report P: 141. Other Reports for BPA 02/28/2024 02/28/2024
Deliverable: R. Produce Journal Articles Q: 183. Produce Journal Articles 02/28/2024 02/28/2024
Effective implementation management and timely contract administration R: 119. Manage and Administer Project 02/28/2024 02/28/2024
Completed Annual Report S: 132. Submit Annual Report for CY2021 (Jan 2021 to Dec 2021) 09/30/2023 03/01/2023
Completed Annual Report T: 132. Submit Annual Report for CY2022 (Jan 2022 to Dec 2022) 01/31/2024
Completed Annual Report U: 132. Submit Progress Report for CY2023 (Jan 2023) to (Dec 2023) 02/29/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 196 Council Step Process
  • 1 instance of WE 28 Trap and Haul
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 176 Produce Hatchery Fish
  • 2 instances of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 183 Produce Journal Article
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Ensure Environmental Compliance Requirements have been met
B 174 Produce Propagation, Rearing, & Outplanting Plan
C 157 Larval/Juvenile Lamprey Surveys in the YN Ceded Lands (*with eDNA laboratory analyses) and Other Field / Lab Data 02/02/2023
D 28 Lamprey Survey and Rescue in Irrigation Canals 02/02/2023
E 99 Participation in Public Outreach
F 161 Participate in Local and Regional Efforts
G 158 PIT and Floy Tag Adult Lamprey 02/02/2023
H 158 PIT, VIE & Acoustic Tag Juvenile/Larval Lampreys 02/02/2023
I 196 Conduct the 3-Step Process for Lamprey Artificial Propagation Activities (with CRITFC)
J 176 Rearing - Research into Artificial Propagation and Early Life Stage Rearing 02/02/2023
K 157 Release - Early Life Stage Lamprey Outplanting Monitoring 02/02/2023
L 66 Translocate Adult Lamprey from the Columbia River 02/02/2023
M 66 Collect Adult Lamprey for research into artifical propagation 02/02/2023
N 162 Data Input and Analysis (*& subcontract with Confluence Aquatics [John Crandall])
O 186 Maintain and monitor lamprey passage structures 02/02/2023
P 141 Other Reports for BPA
Q 183 Produce Journal Articles
R 119 Manage and Administer Project
S 132 Submit Annual Report for CY2021 (Jan 2021 to Dec 2021)
T 132 Submit Annual Report for CY2022 (Jan 2022 to Dec 2022)
U 132 Submit Progress Report for CY2023 (Jan 2023) to (Dec 2023)
V 185 Periodic Status Reports for BPA