Contract 73982 REL 190: 1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
Project Number:
Title:
Walla Walla River Basin Fish Habitat Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
73982 REL 190
Contract Title:
1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
Contract Continuation:
Previous: Next:
73982 REL 159: 1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT: PROTECT & RESTORE
  • 73982 REL 218: 1996-046-01 EXP WALLA WALLA FISH HABITAT PROJECTS
Contract Status:
Issued
Contract Description:
The CTUIR Walla Walla River Basin Fish Habitat Enhancement Project, initiated in 1996, is an ongoing effort to monitor, protect, enhance, and restore the natural form and function of rivers, floodplains, and native fish habitat. Restoration project location and selection criteria is derived from various managerial guidance documents and based upon identification and addressing factors limiting salmonid production including the Middle Columbia River Steelhead Recovery Plan (NMFS 2009), Bull Trout Recovery Plan (USFWS 2015), Walla Walla Subbasin Plan (NPCC 2004), Umatilla River Vision (Jones et al. 2008), Lower Walla Walla River Geomorphic Assessment and Action Plan (CTUIR 2014), and the Lower Mill Creek Final Habitat and Passage Assessment and Strategic Action Plan (CTUIR 2017). The Project is responsible for improving physical habitat conditions for ESA-Listed salmonid species.  

Major tasks to be completed by the project in this funding cycle include:    

1) Walla Walla River Forks Confluence: Construct improved fish screening facilities at a POD within the previously constructed floodplain and habitat restoration project.

2) South Fork Walla Walla River Adaptive Management: Complete limited adaptive management of previously completed habitat projects on the South Fork Walla Walla River to ensure continued function following major floods in February 2020.

3) Upper Walla Walla River Assessment and Action Plan: Complete inventory and assessment for the upper Walla Walla Basin used to identify and prioritize future projects.

4) Walla Walla RM 32.5: Initiate restoration designs for floodplain connection and in-stream habitat enhancement for approximately 0.6 miles of the Walla Walla River near RM 32.5.

5) McNary National Wildlife Refuge Wallula Unit: Initiate cross-agency cooperation and restoration designs for floodplain connectivity, in-stream and off-channel habitat restoration for fish and wildlife species at the confluence of the Walla Walla and Columbia Rivers.

6) Enhance riparian vegetative components at restoration project sites: Plant new vegetation and maintain previously planted areas.  
Account Type(s):
Expense
Contract Start Date:
04/01/2023
Contract End Date:
03/31/2024
Current Contract Value:
$1,165,904
Expenditures:
$1,025,996

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Effective implementation management and timely contract administration B: 119. Habitat Project Implementation Management and Contract Administration 03/31/2024 03/31/2024
Complete compliance documentation and assistance for environmental and cultural resource clearances C: 165. Environmental Compliance Clearance for ecological restoration and habitat enhancement projects 03/31/2024 03/31/2024
Program guidance provided: prioritized project list and implementation schedule D: 114. Identify and select habitat projects that benefit salmonids 03/31/2024 03/31/2024
Provide technical support through interagency coordination and public forum E: 122. Provide technical support on related resource topics 03/31/2024 03/31/2024
Completed outreach and education F: 99. Public outreach and education 03/31/2024 03/31/2024
Vegetation maintained at past project sites G: 198. Maintain Vegetation at Past Projects 03/31/2024 03/31/2024
Photo point monitoring complete H: 186. Implementation Monitoring and Adaptive Management of Past Project Sites 03/31/2024 03/31/2024
Produce fabrication-ready fish screen designs I: 141. Other Reports for BPA 12/31/2023 10/23/2023
South Fork Walla Walla River Point of Diversion intake, screen, and bypass installed J: 208. Walla Walla River Forks - POD Improvements 03/31/2024 03/29/2024
Produce final Upper Walla Walla River Assessment and Action Plan K: 115. Develop Upper Walla Walla River Assessment & Action Plan 03/31/2024
Complete adaptive management on previously completed projects L: 29. South Fork Walla Walla River Adaptive Management 03/31/2024 12/31/2023
Conceptual restoration design complete M: 175. McNary National Wildlife Refuge Wallula Unit Restoration Design 03/31/2024 03/31/2024
Produce permit-level designs N: 175. Walla Walla River RM 32.5 Floodplain Restoration and In-stream Enhancement Design 03/31/2024
Develop and submit permit-ready designs (60%) for review P: 175. Tuusi Wana Floodplain Restoration Design 03/31/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Habitat Project Implementation Management and Contract Administration
C 165 Environmental Compliance Clearance for ecological restoration and habitat enhancement projects
D 114 Identify and select habitat projects that benefit salmonids
E 122 Provide technical support on related resource topics
F 99 Public outreach and education
G 198 Maintain Vegetation at Past Projects 10/06/2021
H 186 Implementation Monitoring and Adaptive Management of Past Project Sites
I 141 Other Reports for BPA
J 208 Walla Walla River Forks - POD Improvements
K 115 Develop Upper Walla Walla River Assessment & Action Plan
L 29 South Fork Walla Walla River Adaptive Management
M 175 McNary National Wildlife Refuge Wallula Unit Restoration Design
N 175 Walla Walla River RM 32.5 Floodplain Restoration and In-stream Enhancement Design
O 132 [Deliverable due next period]: Progress Report (2-year): Calendar-year 2023 and 2024 (01/01/2023 - 12/31/2024)
P 175 Tuusi Wana Floodplain Restoration Design