56662 REL 252: 1997-051-00 EXP YAKIMA BASIN SIDE CHANNELS |
|
* Expenditures data includes accruals and are based on data through 31-Mar-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Complete |
---|---|---|---|---|
Completed Annual Report | B: 132. YKFP Habitat Project 2023 Annual Report (3/1/23-02/28/24) | 02/28/2024 | 02/28/2024 | |
Effectiveimplementationmanagement and timelycontract administration | C: 119. Project Management | 02/28/2024 | 02/28/2024 | |
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | D: 114. Identify and select projects | 09/29/2023 | 09/29/2023 | |
NEPA planning complete | E: 165. Environmental Compliance | 02/28/2024 | 02/28/2024 | |
Technical review complete | F: 122. YKFP Habitat, Water and Passage Technical Review Activities | 02/28/2024 | 02/28/2024 | |
Habitat/Passage/Structure maintained | G: 186. Maintain Habitat Projects | 02/28/2024 | 02/28/2024 | |
Human Impact & Weed Inspections | H: 198. Manage Habitat Parcels | 02/28/2024 | 02/28/2024 | |
Fence installed | I: 40. Fortune Habitat Protection | 02/29/2024 | ||
Crack willow removed | J: 199. Pott Road invasive crack willow removal | 02/28/2024 | 02/28/2024 | |
House demolished | K: 27. Pott Road house demolition | 08/31/2023 | 06/30/2023 | |
Renovation complete | L: 186. Sampson barn renovation | 11/30/2023 | 10/31/2023 | |
Relocate beavers | M: 190. Beaver Reintroduction | 02/29/2024 | ||
Design permitted for construction | P: 175. SF Tanuem Creek Floodplain Restoration RM 0.0-3.2 | 02/29/2024 | ||
Place large wood in SF Taneum Creek | Q: 29. SF Taneum Creek Floodplain Restoration Phase 1 RM 0.4- 3.2 | 02/29/2024 | ||
Build beaver dam analogs | R: 29. SF Meadow Beaver Dam Analogs, SF Taneum headwaters RM 3.7 | 02/29/2024 | ||
Design permitted for construction | S: 175. Ahtanum Village RM 5.4 Final Design | 02/28/2024 | ||
Design fully permitted for construction | T: 175. SF Cowiche RM 9.5 and Reynolds RM 0.0 at Van Wyk, Floodplain Restoration | 02/28/2024 | ||
Construction complete | U: 29. Tieton River Habitat Enhancement RM 4.2 | 02/29/2024 | ||
Design fully permitted for construction | V: 175. Taneum Creek RM 5 Final Design | 02/29/2024 | ||
Add wood as necessary | W: 29. SF Manastash headwaters at Frost Meadows Adaptive Management | 02/28/2024 | ||
Logs hauling complete | Y: 29. Procurement of materials for pre-implementation | 02/28/2024 | ||
LiDAR Acquisition | AA: 115. Acquisition for WF Teanaway River Design Data | 02/29/2024 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Coho (O. kisutch) - Unspecified Population |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Cutthroat Trout, Westslope (O. c. lewisi) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Trout, Rainbow (Oncorhynchus mykiss) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | |||||||
B | 132 | YKFP Habitat Project 2023 Annual Report (3/1/23-02/28/24) | |||||||
C | 119 | Project Management | |||||||
D | 114 | Identify and select projects | |||||||
E | 165 | Environmental Compliance | |||||||
F | 122 | YKFP Habitat, Water and Passage Technical Review Activities | |||||||
G | 186 | Maintain Habitat Projects | |||||||
H | 198 | Manage Habitat Parcels | |||||||
I | 40 | Fortune Habitat Protection | |||||||
J | 199 | Pott Road invasive crack willow removal | |||||||
K | 27 | Pott Road house demolition | |||||||
L | 186 | Sampson barn renovation | 06/01/2023 | ||||||
M | 190 | Beaver Reintroduction | |||||||
N | 175 | Yakima River Edge Habitat Phase III RM 184 | |||||||
O | 115 | Yakima River RM 164 at Thorp, Reach Assessment | |||||||
P | 175 | SF Tanuem Creek Floodplain Restoration RM 0.0-3.2 | |||||||
Q | 29 | SF Taneum Creek Floodplain Restoration Phase 1 RM 0.4- 3.2 | |||||||
R | 29 | SF Meadow Beaver Dam Analogs, SF Taneum headwaters RM 3.7 | |||||||
S | 175 | Ahtanum Village RM 5.4 Final Design | |||||||
T | 175 | SF Cowiche RM 9.5 and Reynolds RM 0.0 at Van Wyk, Floodplain Restoration | |||||||
U | 29 | Tieton River Habitat Enhancement RM 4.2 | |||||||
V | 175 | Taneum Creek RM 5 Final Design | |||||||
W | 29 | SF Manastash headwaters at Frost Meadows Adaptive Management | |||||||
X | 29 | Lick Creek pre commercial thinning and wood placement | |||||||
Y | 29 | Procurement of materials for pre-implementation | |||||||
Z | 115 | Naches River RM 18 Reach Assessment | |||||||
AA | 115 | Acquisition for WF Teanaway River Design Data |