Contract 97376: 2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION
Project Number:
Title:
CREST Estuary Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 100.00%
Contract Number:
97376
Contract Title:
2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION
Contract Continuation:
Previous: Next:
92647: 2010-004-00 EXP CREST ESTUARY HABITAT RESTORATION (CREST)
Contract Status:
Issued
Contract Description:
CREST proposes to continue to implement estuary habitat restoration projects during this contract period. Projects developed, designed, and permitted during previous contract periods will move to construction. CREST will continue to develop and design BPA-approved new restoration projects working with landowners, stakeholders, and subcontracted design and engineering consultants. CREST will also continue to invest staff time in community outreach and project development including participating in regional meetings with BPA, the Corps, as well as partner coordination forums such as the Estuary Partnership's Science Work Group (SWG). CREST biologists will conduct Level 3 pre and post project evaluation (Action Effectiveness Monitoring; AEMR) at our restoration sites in coordination with partners and the Columbia Estuary Ecosystem Restoration Program (CEERP).  

Restoration of estuary habitat focuses on habitat opportunity, capacity, and realized function critical to the recovery of threatened/endangered salmon utilizing the Columbia River Estuary. CREST Habitat Restoration Program Deliverables include:
    1) Development of BPA-approved estuary habitat restoration projects.
    2) Presenting and prioritizing restoration projects based on guidance from BPA and the Expert Regional Technical Group (ERTG)
    3) Incorporating design feedback from the ERTG, Project Review Committee (PRC) and partners.
    4) Design, permit, and implementation of 2-5 estuarine restoration projects each year.
    5) Conduct CEERP Level 3 Action Effectiveness Monitoring and Research (AEMR) of restoration projects in coordination with regional partners.

The following projects are currently in full design, engineering, and permitting and will move to construction in 2025 and 2026:

• Hogan Ranch: This project will remove 3 water control structures and rock ford, along with 3 other berm removals, and marshplain lowering to reconnect approximately 170 acres of habitat to the Multnomah Channel and Scappoose Bay.
• Warren Slough: A new 60' long bridge will be installed to provide full fish passage to the 22 acres of floodplain habitat. Wetland and riparian plantings to improve wetland function.
• South Crane: This project will remove several water control structures, breach berms, perform marshplain lowering and channel excavation to provide full fish passage to approximately 67 acres of floodplain habitat on Sauvie Island. Wetland and riparian plantings will occur to improve wetland function.
• Toaheedliini: The Toaheedliini project will involve breaching (removing) sections of a deauthorized levee in a number of locations along the Walluski River, as well as creating new  marsh channels and enhancing existing channels into the interior of the wetlands. The project will result in fish passage barrier removal and full tidal inundation to approximately 55 acres along the Walluski River.
• Crosel Creek: This project will work with a planned ODOT project to remove a culvert with a tidegate, replacing it with a box culvert to allow full fish passage to approximately 55 acres of floodplain habitat.  Channel excavation, ditch fill, and topographic complexity mounding will provide improved in-channel and floodplain complexity across the site. Wetland and riparian plantings will occur to improve wetland function.
• Netul Landing: This project will involve the construction of a setback levee and breaching a levee in multiple locations to reconnect 24 acres of off-channel floodplain habitat. Channel excavation and marshplain lowering will improve off-channel and floodplain complexity. Wetland and Riparian plantings will occur to improve wetland function.

The following projects are currently included in the contract for design, engineering, and permitting phases with the plan to move to construction in future years:

• Carr Slough: Designs for the Carr Slough project will occur in 2025 and 2026. This project will entail breaching the existing railroad berm to create full fish access and hydrologic connectivity to approximately 121 acres of floodplain wetland habitat directly off of the mainstem Columbia River. Other project actions include creation of additional tidal channels, increased channel sinousity, marshplain lowering, and riparian and emergent plantings.
• Fertile Valley: Designs for the Fertile Valley project will begin in 2025 and continue through the end of the contract (6/30/2027). This project will entail breaching the existing railroad berm to create full fish access and hydrologic connectivity to approximately approximately 100 acres of floodplain wetland habitat directly off of the mainstem Columbia River. Other project actions include creation of additional tidal channels, increased channel sinousity, marshplain lowering, and riparian and emergent plantings.
• Netul Landing: Designs for the Netul Landing project will be finalized in 2025. The project involves breaching an existing levee, creation of new tidal channel, new culverts, and construction of a setback levee. The project will open up full fish access to 24 acres of floodplain habitat along the Lewis and Clark River.
• Toaheedliini: Designs for the Toaheedliini project will be completed during 2025 and 2026. Restoration actions for this project will include removing sections of the deauthorized levee along the Walluski River in multiple locations to an elevation that matches the interior marshplain elevation. Additional excavation will also occur in the interior of the wetland to enhance the wetland channel network to further improve tidal connectivity and fish access. The site will be revegetated with native plants following construction.
• Crosel Creek: Designs to occur in 2025 through 2026. Project will focus on wetland enhancement and reconnection of historic tidal channels throughout the 55 acre site.
• Colewort Creek: Ph3: Designs to commence in 2025 through June 2027. Restoration actions include installation of new bridge or large box culvert, removal of sections of levee, ditch fill, and reconnection of tidal channels.


CREST is also pursuing various projects at the feasibility design stage. These projects include:
Blind Slough, Clatsop Fairgrounds, Malarkey Ranch, Mansfield/Mathre, and Aaron/McNary.

CREST will pursue cost share for project engineering and construction during this contract period from the National Park Service, Oregon Watershed Enhancement Board, Salmon Recovery Funding Board, United States Fish and Wildlife Service, National Oceanic and Atmospheric Administration, Lower Columbia River Estuary Partnership, and other funding sources.  

Within this contract, major work elements are directly related to implementation of previously designed projects and on engineering and permitting for outyear projects. Additional actions focus on action effectiveness monitoring, community outreach and project development.  

Projects in development will be subject to review by the Estuary Partnership's Project Review Committee (PRC) at 30% design and review and assignment of project benefits by the Expert Regional Technical Group (ERTG) at 60% design.  All projects in the estuary are also subject to cost benefit analysis and approval by BPA.  Each of the projects CREST is proposing during this contract undergoes a cost/PBU preliminary review and final scoring by ERTG.  If at any time during the scientific review and the ERTG process it is determined that proposed restoration projects do not meet BPA criteria for implementation, CREST will work with BPA to address these issues.

Post project evaluation (Level 3 AEMR) will be conducted by CREST biologists at many projects including: North Unit: Ph2, Buckmire, Bear/Mary/Ferris, Dairy Creek, Government Island, McCarthy: Ph2, John Day Crossing, West Sand Island, Woodland Islands, Hungry Harbor, Palensky, Dalton Lake, South Tongue Point, Aldrich Point, and Wolf Bay.

Both pre and post project monitoring will be conducted at Warren Slough and Hogan Ranch.  Pre project monitoring at Toaheedliini, Netul Landing, Crosel Creek, and South Crane will occur during this contract period.  Project monitoring is used at restoration sites to better quantify use and habitat lift for individual restoration sites and to inform benefits of restoration actions at projects in development.  
Account Type(s):
Expense
Contract Start Date:
07/01/2025
Contract End Date:
06/30/2027
Current Contract Value:
$11,972,750
Expenditures:

* Expenditures data includes accruals and are based on data through 30-Jun-2025.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Produce Environmental Compliance documentation B: 165. Produce EC for projects 06/30/2027
Effective implementation management and timely contract administration C: 119. Manage and Administer Projects 06/30/2027
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish D: 114. Meet with stakeholders when approached with new project 06/30/2027
Regional Data Sharing and CEERP Coordination Meetings E: 191. Participate in Regional Data Sharing; CEERP Coordination 06/30/2027
Produce accessible, error-checked datasets F: 157. AEMR (Level 3): Collect PRE-Construction AEMR Level 3 data 06/30/2027
Produce accessible, error-checked datasets G: 157. AEMR (Level 3): Collect POST-Construction AEMR Level 3 data 06/30/2027
Produce accessible, error-checked datasets H: 157. AEMR (Level 3): Collect PRE & POST-Construction AEMR Level 3 data 06/30/2027
Deliverable: An accessible, error-checked data set with metadata I: 162. Analyze Level 3 AEMR Data 06/30/2027
Completed Progress (Annual) Report -- July 2024-June 2025 L: 132. Submit Annual Progress Report for the period (July 2025) to (June 2026) 07/15/2025
Completed Progress (Annual) Report -- July 2025-June 2026 M: 132. Submit Annual Progress Report for the period (July 2026) to (June 2027) 07/15/2026
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish N: 114. MALARKEY RANCH - COORDINATION with Stakeholders/Partners 06/30/2027
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish O: 114. Blind Slough - Feasibility 06/30/2027
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish P: 114. AARON/MCNARY - FEASIBILITY 06/30/2027
Carr Slough - Design Q: 175. CARR SLOUGH - DESIGN--100% 06/30/2027
Toaheedliini - Produce 100% Design R: 175. TOAHEEDLIINI - DESIGN--100% 06/30/2026
Fort Stevens - Design S: 175. FT. STEVENS - DESIGN--100% 06/30/2027
Fertile Valley - Design T: 175. FERTILE VALLEY - DESIGN--100% 06/30/2027
Crosel Creek - Design U: 175. CROSEL CREEK - DESIGN--100% 06/30/2026
Colewort Creek Ph3 - Design V: 175. COLEWORT CREEK: PHASE 3 - DESIGN--100% 06/30/2027
South Crane - Design W: 175. SOUTH CRANE - DESIGN--100% 06/30/2026
Netul Landing - Design X: 175. NETUL LANDING - DESIGN--100% 06/30/2026
Wolf Bay - Install Permit Required Plantings Y: 47. WOLF BAY - CONSTRUCTION--Plantings 06/30/2027
Woodland Island - Permit Required Plantings Z: 47. WOODLAND ISLANDS - CONSTRUCTION--Plantings 05/31/2026
Palensky - Floodplain - Permit Required Plantings AA: 47. PALENSKY - FLOODPLAIN CONSTRUCTION--Plantings 05/31/2027
Palensky - Hwy 30 - Permit Required Plantings AB: 47. PALENSKY - HWY 30 UNDERPASS CONSTRUCTION - Plantings 05/31/2026
Aldrich Point - Permit Required Plantings AC: 47. ALDRICH POINT - CONSTRUCTION--Plantings 05/31/2026
Completed channel construction AD: 30. SOUTH CRANE - CONSTRUCTION - Realign, Connect, and/or Create Channel 12/31/2026
South Crane - Enhance Floodplain Habitat AE: 180. SOUTH CRANE - CONSTRUCTION - Modify levee 12/31/2026
South Crane - Install Bridges AF: 184. SOUTH CRANE - CONSTRUCTION - Install bridge 12/31/2026
South Crane - Seeding and Planting AG: 47. SOUTH CRANE - CONSTRUCTION - Plant Vegetation 03/31/2027
Completed channel construction AH: 30. CROSEL CREEK - CONSTRUCTION - Excavate channels 12/31/2026
Crosel Creek--Enhance Floodplain Habitat AI: 180. CROSEL CREEK - CONSTRUCTION - Enhance wetland 12/31/2026
Crosel Creek - Revegetation AJ: 47. CROSEL CREEK - CONSTRUCTION - Plant vegetation 06/30/2027
Completed channel construction AK: 30. TOAHEEDLIINI - CONSTRUCTION - Excavate Channels 12/31/2026
TOAHEEDLIINI - Enhance Floodplain Habitat AL: 180. TOAHEEDLIINI - CONSTRUCTION - Modify Levee, Breach Dike 12/31/2026
TOAHEEDLIINI - Revegetation AM: 47. TOAHEEDLIINI - CONSTRUCTION - Plantings 06/30/2027
Hogan Ranch - Native Planting and Seeding AN: 47. HOGAN RANCH - CONSTRUCTION - PLANTINGS 04/30/2027
Conduct Pre-Acquisition Activities - Crosel Creek AO: 172. Crosel Creek - Conduct Pre-Acquisition Activities 06/30/2027
Complete Pre-Acquisition Activities AP: 172. Carr Slough - Conduct Pre-Acquisition Activities 06/30/2027

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 3 instances of WE 30 Realign, Connect, and/or Create Channel
  • 8 instances of WE 47 Plant Vegetation
  • 3 instances of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 172 Conduct Pre-Acquisition Activities
  • 4 instances of WE 114 Identify and Select Projects
  • 8 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 3 instances of WE 30 Realign, Connect, and/or Create Channel
  • 8 instances of WE 47 Plant Vegetation
  • 3 instances of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 172 Conduct Pre-Acquisition Activities
  • 4 instances of WE 114 Identify and Select Projects
  • 8 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 3 instances of WE 30 Realign, Connect, and/or Create Channel
  • 8 instances of WE 47 Plant Vegetation
  • 3 instances of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 172 Conduct Pre-Acquisition Activities
  • 3 instances of WE 114 Identify and Select Projects
  • 8 instances of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 3 instances of WE 30 Realign, Connect, and/or Create Channel
  • 8 instances of WE 47 Plant Vegetation
  • 3 instances of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 172 Conduct Pre-Acquisition Activities
  • 3 instances of WE 114 Identify and Select Projects
  • 8 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Wildlife
  • 1 instance of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Produce EC for projects
C 119 Manage and Administer Projects
D 114 Meet with stakeholders when approached with new project
E 191 Participate in Regional Data Sharing; CEERP Coordination
F 157 AEMR (Level 3): Collect PRE-Construction AEMR Level 3 data 05/09/2025
G 157 AEMR (Level 3): Collect POST-Construction AEMR Level 3 data 05/09/2025
H 157 AEMR (Level 3): Collect PRE & POST-Construction AEMR Level 3 data 05/09/2025
I 162 Analyze Level 3 AEMR Data
J 132 Provide data for estuary 2025 EP AEMR RME Report
K 132 Provide data for estuary 2026 EP AEMR RME Report
L 132 Submit Annual Progress Report for the period (July 2025) to (June 2026)
M 132 Submit Annual Progress Report for the period (July 2026) to (June 2027)
N 114 MALARKEY RANCH - COORDINATION with Stakeholders/Partners
O 114 Blind Slough - Feasibility
P 114 AARON/MCNARY - FEASIBILITY
Q 175 CARR SLOUGH - DESIGN--100% 05/09/2025
R 175 TOAHEEDLIINI - DESIGN--100% 05/09/2025
S 175 FT. STEVENS - DESIGN--100% 05/09/2025
T 175 FERTILE VALLEY - DESIGN--100% 05/09/2025
U 175 CROSEL CREEK - DESIGN--100% 05/09/2025
V 175 COLEWORT CREEK: PHASE 3 - DESIGN--100% 05/09/2025
W 175 SOUTH CRANE - DESIGN--100% 05/09/2025
X 175 NETUL LANDING - DESIGN--100% 05/09/2025
Y 47 WOLF BAY - CONSTRUCTION--Plantings 05/09/2025
Z 47 WOODLAND ISLANDS - CONSTRUCTION--Plantings 05/09/2025
AA 47 PALENSKY - FLOODPLAIN CONSTRUCTION--Plantings 05/09/2025
AB 47 PALENSKY - HWY 30 UNDERPASS CONSTRUCTION - Plantings 05/09/2025
AC 47 ALDRICH POINT - CONSTRUCTION--Plantings 05/09/2025
AD 30 SOUTH CRANE - CONSTRUCTION - Realign, Connect, and/or Create Channel
AE 180 SOUTH CRANE - CONSTRUCTION - Modify levee
AF 184 SOUTH CRANE - CONSTRUCTION - Install bridge
AG 47 SOUTH CRANE - CONSTRUCTION - Plant Vegetation
AH 30 CROSEL CREEK - CONSTRUCTION - Excavate channels
AI 180 CROSEL CREEK - CONSTRUCTION - Enhance wetland
AJ 47 CROSEL CREEK - CONSTRUCTION - Plant vegetation
AK 30 TOAHEEDLIINI - CONSTRUCTION - Excavate Channels
AL 180 TOAHEEDLIINI - CONSTRUCTION - Modify Levee, Breach Dike
AM 47 TOAHEEDLIINI - CONSTRUCTION - Plantings
AN 47 HOGAN RANCH - CONSTRUCTION - PLANTINGS
AO 172 Crosel Creek - Conduct Pre-Acquisition Activities
AP 172 Carr Slough - Conduct Pre-Acquisition Activities