Portfolio Description:
BPA Tributary Habitat: Fulfills NMFS BiOp Commitments.
Limited to Snake River Sp/Su Chinook and Steelhead, and UC Sp Chinook and Steelhead
Includes the Following Measure: acre-feet/year of water protected, acres improved in riparian areas, acres improved in various ways, acres treated instream, barriers addressed, cubic-feet per second (cfs) of water flow protected, miles of habitat accessed, miles of stream improved in riparian areas, miles of stream protected in riparian areas, miles of stream with improved complexity, screens installed or addressed
Portfolio Owner: Russell Scranton (rwscranton@bpa.gov)
Portfolio Access Level: Public
Portfolio Required by System: No
Please Note: This portfolio's result set has been limited to Work Sites. To broaden or narrow these results, edit the portfolio and change the Portfolio Type setting e.g. Projects, Contracts, or Work Statement Elements.
Name: | BPA Tributary Habitat: Fulfills NMFS BiOp Commitments. |
---|---|
Description: | BPA Tributary Habitat: Fulfills NMFS BiOp Commitments. Limited to Snake River Sp/Su Chinook and Steelhead, and UC Sp Chinook and Steelhead Includes the Following Measure: acre-feet/year of water protected, acres improved in riparian areas, acres improved in various ways, acres treated instream, barriers addressed, cubic-feet per second (cfs) of water flow protected, miles of habitat accessed, miles of stream improved in riparian areas, miles of stream protected in riparian areas, miles of stream with improved complexity, screens installed or addressed |
Result Type: | Work Site |
Visibility: | Visible to the general public without an account |
Created: | 4/19/2021 3:05:51 PM by Scranton, Russell |
Last Modified: | 1/21/2025 10:07:39 AM by Scranton, Russell |
Last Automatic Snapshot: | 3/20/2025 11:37:47 AM |
Proponents: | 18 |
FCRPS BiOp Actions: | RPA 34 Tributary Habitat Implementation 2007 to 2009, RPA 35 Tributary Habitat Implementation 2010 to 2018, RPA 56 Monitor and Evaluate Tributary Habitat Conditions and Limiting Factors, RPA 57 Evaluate the Effectiveness of Tributary Habitat Actions |
Cumulative Working Budget: |
$820,342,363 in Expense $36,519,484 in Capital |
Total # of Projects: | 41 |
Criteria Summary: |
|