Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 42318: 2001-041-01 EXP FORREST RANCH MANAGEMENT
Project Number:
Title:
Forrest Conservation Area
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
42318
Contract Title:
2001-041-01 EXP FORREST RANCH MANAGEMENT
Contract Continuation:
Previous: Next:
35866: 200104101 EXP FORREST RANCH MANAGEMENT
  • 46912: 200104101 EXP FORREST RANCH MANAGEMENT
Contract Status:
Closed
Contract Description:
THE CONFEDERATED TRIBES OF THE WARM SPRINGS
RESERVATION OF OREGON
Department Natural Resources
John Day Basin Office (JDBO)

Forrest Conservation Area
Management & Implementation

BPA Project Number 2001-041-01
CR-113717
Contract Period: 01 April 2009 to 31 March 2010

STATEMENT OF WORK
FY 2009

Project Goal: Protect, conserve and enhance habitat values of the property for fish and wildlife.

Location of Project: The Forrest Conservation Area is located within the Upper John Day Basin in eastern Oregon.  The Conservation Area consists of two parcels, (3,445 acres) along the upper Mainstem John Day River and (786 acres) along the Middle Fork John Day River.  The Mainstem parcel is located ½ mile to the east of Prairie City and the Middle Fork parcel is located 1 mile west of Bates, Oregon.

Discussion: The Confederated Tribes of Warm Springs Department of Natural Resources will manage, plan and coordinate for the protection and enhancement of fish and wildlife and their associated habitats.  The ongoing operations for the 2009 contract period will entail property maintenance, resource monitoring, CREP plant maintenance, tribal/public access, and irrigation project implementation.

Actions needed:
A request to pre-schedule $8,219.04 from the 2010 - 2011 budget year for cultural resource surveys, more travel, equipment maintenance, and minor and major equipment.
Account Type(s):
Expense
Contract Start Date:
04/01/2009
Contract End Date:
03/31/2010
Current Contract Value:
$256,368
Expenditures:
$256,368

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental compliance A: 165. Obtain NEPA compliance 01/29/2010 01/29/2010
Project administration and management B: 119. Manage and Administer Tribal Projects & BPA activities 03/31/2010 03/31/2010
Facility Maintenance C: 186. Maintain Facilities and Structures 03/31/2010 03/31/2010
Complete septic tank and drain field installation D: 186. Shop Building and Red House Facility Upgrades 12/31/2009
Buried pipe fully functional E: 149. Pipe irrigation ditch near corrals and buildings to decrease erosion and maintenance 11/20/2009
Install flow monitoring equipment F: 148. Staff gauge installation 11/30/2009 09/24/2009
Water right consolidation G: 84. Obtain Permitted POD 03/31/2010
Noxious weed and invasive species control H: 53. Vegetation Management 11/30/2009 10/30/2009
Riparian planting I: 47. Riparian Planting 03/31/2010 03/31/2010
Grazing lease J: 92. Property Leases 11/27/2009 11/27/2009
Protect CREP plants in riparian corridor K: 22. Maintain CREP plantings 10/30/2009 09/15/2009
Informative signs and nature trail installation L: 188. Informative Signs and Nature Trail Installation 03/31/2010
Public recreation and natural resource exposure M: 99. Public Access 03/31/2010 03/31/2010
Property Patrols N: 26. Property Patrol 03/31/2010 03/31/2010
Fish, habitat, and flow data. O: 157. Monitor Property Fish, Habitat, and Flow Data 03/12/2010 03/31/2010
Conceptual designs and planned projects P: 114. Coordinate and Develop future restoration projects 03/31/2010 03/31/2010
Dike removal design Q: 175. BOR design for dike removal on the Mainstem FCA 01/29/2010 03/15/2010
Final plan R: 174. Final review and approval of Property Management Plan 03/31/2010 03/30/2010
Annual Report S: 132. Annual Report 07/15/2009 08/24/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 149 Install Pipeline
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 149 Install Pipeline
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
  • 1 instance of WE 149 Install Pipeline
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 149 Install Pipeline
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 92 Lease Land
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain NEPA compliance 02/09/2007
B 119 Manage and Administer Tribal Projects & BPA activities 02/09/2007
C 186 Maintain Facilities and Structures 02/09/2007
D 186 Shop Building and Red House Facility Upgrades 08/27/2009
E 149 Pipe irrigation ditch near corrals and buildings to decrease erosion and maintenance 05/15/2009
F 148 Staff gauge installation 04/28/2009
G 84 Obtain Permitted POD 02/09/2007
H 53 Vegetation Management 04/28/2009
I 47 Riparian Planting 04/28/2009
J 92 Property Leases 02/09/2007
K 22 Maintain CREP plantings 02/09/2007
L 188 Informative Signs and Nature Trail Installation 08/27/2009
M 99 Public Access 02/09/2007
N 26 Property Patrol 02/09/2007
O 157 Monitor Property Fish, Habitat, and Flow Data 02/09/2007
P 114 Coordinate and Develop future restoration projects 02/09/2007
Q 175 BOR design for dike removal on the Mainstem FCA 02/09/2007
R 174 Final review and approval of Property Management Plan 02/09/2007
S 132 Annual Report 02/09/2007
T 185 Periodic Status Reports for BPA 02/09/2007