Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 49229: 1998-019-00 EXP WIND RIVER WATERSHED UCD
Project Number:
Title:
Wind River Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Wind 100.00%
Contract Number:
49229
Contract Title:
1998-019-00 EXP WIND RIVER WATERSHED UCD
Contract Continuation:
Previous: Next:
39493: 1998-019-00 EXP UNDERW CON DIS WIND RIVER WATERSHED
  • 53638: 1998-019-00 EXP WIND RIVER WATERSHED UCD
Contract Status:
Closed
Contract Description:
This contract supports and is part of the Wind River Watershed Project, initiated in 1998.  The project's focus is on restoration of Wind River steelhead.  In 1998, the National Marine Fisheries Service listed the steelhead of the lower Columbia river as "threatened" under the Endangered Species Act.  In 1997, the Washington Department of Fish and Wildlife rated the status of the Wind River summer run steelhead as critical.  Due to the status of this stock, the Wind River summer steelhead have the highest priority for recovery/restoration in the state of Washington's Lower Columbia Steelhead Conservation Initiative.  Project participants are the Underwood Conservation District, US Geological Survey, US Forest Service, and Washington Department of Fish and Wildlife.  

This contract continues UCD support and participation in the project.  Underwood Conservation District will provide habitat restoration work in 2010-12.  Included in this contract will be removal of noxious weeds (primarily scotch broom), planting of native vegetation along riparian areas, monitoring vegetation to identify further planting or weed removal needs, and providing the appropriate environmental compliance documentation for this work.  Additionally, UCD will utilize BPA dollars to match other grant funds for the habitat enhancement work involved in the Little Wind River Community Habitat Restoration Project.  This project will likely be constructed in the summer of 2011.  Other work will include producing periodic (quarterly) status reports, annual reports, as well as managing and administering the project.
Account Type(s):
Expense
Contract Start Date:
07/01/2010
Contract End Date:
06/30/2011
Current Contract Value:
$105,571
Expenditures:
$105,571

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jamie Gomez Underwood Conservation District (UCD) Yes Contract Manager jamiegomez@gorge.net (509) 493-1936
Ann Gross Underwood Conservation District (UCD) No Administrative Contact ann@ucdwa.org (509) 493-1936
Mary Haight Bonneville Power Administration Yes COR mthaight@bpa.gov (503) 230-3112
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Andrew Montano Bonneville Power Administration No Env. Compliance Lead ammontano@bpa.gov (503) 230-4145
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Tova Tillinghast Underwood Conservation District (UCD) Yes Supervisor tova@ucdwa.org (509) 493-1936


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Support B: 165. Produce Environmental Compliance Documentation 06/30/2011
Funding Package - Submit draft to COTR C: 119. Manage and Administer Projects 03/31/2011 05/02/2011
Final report uploaded to the BPA website D: 132. Submit Annual Report for the period of July 2008 to June 2009 01/28/2011 01/17/2011
Final report uploaded to the BPA website E: 132. Submit Annual Report for the period July 2009 to June 2010 02/28/2011 01/17/2011
30 Acres of noxious weeds controlled F: 53. Remove Noxious Weeds 06/30/2011 06/30/2011
8 Acres planted G: 47. Plant Native Vegetation 06/30/2011 11/30/2010
Complete Engineer/Design work for Little Wind River Habitat Project H: 175. Little Wind River Engineer and Design 06/30/2011 06/30/2011
Project ready for Construction in FY11 I: 29. Little Wind River Habitat Project 06/30/2011
Up-to-date Watershed Enhancement Project List J: 114. Identify and Develop Future Projects 03/01/2011 03/01/2011
Temperature Data Stored in Water Quality Database K: 157. Stream Temperature Monitoring 06/30/2011 06/30/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 175 Produce Design
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2010
B 165 Produce Environmental Compliance Documentation 07/01/2010
C 119 Manage and Administer Projects 07/01/2010
D 132 Submit Annual Report for the period of July 2008 to June 2009 07/01/2010
E 132 Submit Annual Report for the period July 2009 to June 2010 07/01/2010
F 53 Remove Noxious Weeds 08/17/2010
G 47 Plant Native Vegetation 08/17/2010
H 175 Little Wind River Engineer and Design 07/01/2010
I 29 Little Wind River Habitat Project 09/08/2010
J 114 Identify and Develop Future Projects 07/01/2010
K 157 Stream Temperature Monitoring 07/01/2010