Province | Subbasin | % |
---|---|---|
Columbia Plateau | Deschutes | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Mar-2024.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Israel Duran | Bonneville Power Administration | Yes | Env. Compliance Lead | induran@bpa.gov | (503) 230-3967 |
Richard Golden Jr | Bonneville Power Administration | Yes | COR | rlgolden@bpa.gov | (503) 230-5119 |
Brenda Heister | Bonneville Power Administration | Yes | Contracting Officer | bsheister@bpa.gov | (503) 230-3531 |
Jerilyn Irvine | Oregon Department of Fish and Wildlife | No | Administrative Contact | jerilyn.irvine@state.or.us | (503) 947-6137 |
Tom Nelson | Oregon Department of Fish and Wildlife | Yes | Contract Manager | tom.nelson@state.or.us | (541) 923-7470 |
John Skidmore | Bonneville Power Administration | Yes | F&W Approver | jtskidmore@bpa.gov | (503) 230-5494 |
Amy Stuart | Oregon Department of Fish and Wildlife | No | Supervisor | amy.m.stuart@state.or.us | (541) 388-6363 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
NEPA Compliance Requirements Complete For Habitat Restoration Projects To Be Implemented | A: 165. Obtain Environmental Compliance | 01/31/2014 | 01/31/2014 | |
Viable Restoration Projects Developed To Assist In The Attainment Of Project Goal | B: 114. Habitat Restoration Project Development | 01/31/2014 | 01/31/2014 | |
Remove Noxious Weeds & Revegetate Ground Within Trout Creek | C: 47. Revegetate Exclosure Area Within The Trout Creek Project Area | 01/31/2014 | 01/31/2014 | |
Removal Of Under Sized And/Or Partial Fish Barrier Culverts In Upper Trout Creek Basin | D: 85. Replace Undersized Culverts In Upper Trout Creek Basin | 01/31/2014 | 01/31/2014 | |
Develop Culvert Replacement Specifications For Upper Trout Creek Basin Culverts | E: 175. Develop Design Specifications For Upper Trout Creek Culvert Replacement | 01/31/2014 | 01/31/2014 | |
Replacement Of Undersized & Semi-Functional Culverts In The Upper Trout Creek Basin | F: 38. Replace Undersized Culverts In Upper Trout Creek Basin | 01/31/2014 | 01/31/2014 | |
Monitor Trout Creek Basin Riparian Exclosures | G: 26. Monitor Exclosures | 01/31/2014 | 01/31/2014 | |
Maintained Fences & Water Gaps | H: 186. Maintain Riparian Corridor Fence | 01/31/2014 | 01/31/2014 | |
Maintained Bank Stabilization Structures | I: 186. Maintain Bank Stabilization Structures | 01/31/2014 | 12/01/2013 | |
Maintained Instream Structures | J: 186. Maintain Instream Structures | 01/31/2014 | 01/31/2014 | |
Repaired/Maintained Off Channel Water Development Sites | K: 186. Repair/Maintain Off Channel Water Development Sites | 01/31/2014 | 01/31/2014 | |
Document Physical Habitat Changes In Response To Restoration Actions Funded By BPA | L: 157. Document The Changes Of Habitat Restoration Practices In The Trout Creek Basin | 01/31/2014 | 01/31/2014 | |
Basin Wide Redd Counts | M: 157. Adult Redd Counts | 01/31/2014 | 01/31/2014 | |
Post Monitoring Of Major Channel Habitat Improvement Project | N: 157. Post Monitoring Each Phase (10 Miles ) Of Channel Habitat Improvement Reaches | 01/31/2014 | 01/31/2014 | |
Technical Assistance Provided | O: 122. Provide Technical Assistance & Input | 01/31/2014 | 01/31/2014 | |
Stream Water Temperature Monitored | P: 157. Monitor Stream Water Temperature In The Trout Creek Basin | 01/31/2014 | 01/31/2014 | |
Data Captured In Two Data Bases (One For Adults & One For Juveniles) | Q: 157. Monitor Smolt Production & Adult Escapement | 01/31/2014 | 01/31/2014 | |
Exclude Hatchery Summer Steelhead From Wild Trout Creek Summer Steelhead Stock | R: 190. Remove/Exclude Hatchery Summer Steelhead | 06/30/2013 | 06/30/2013 | |
Summer Steelhead Smolts PIT Tagged | S: 158. PIT Tag Out-Migrant Summer Steelhead Smolts | 09/30/2013 | 09/30/2013 | |
PIT Tag Data Submitted To PTAGIS | T: 159. Submit & Acquire PIT Tag Data To/From PTAGIS | 06/30/2013 | 06/30/2013 | |
ESA Listed Mid Columbia Summer Steelhead Monitored | U: 162. Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-Migrant Estimates | 01/31/2014 | 01/31/2014 | |
Annual Report For Performance Period 2/1/13 - 12/31/13 | W: 132. Produce Annual For 2/1/2013 to 12/31/2013 | 01/31/2014 | ||
Manage & Administer Project | X: 119. Manage & Administer Project | 01/31/2014 | 01/31/2014 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Obtain Environmental Compliance | 02/01/2013 | ||||||
B | 114 | Habitat Restoration Project Development | 02/01/2013 | ||||||
C | 47 | Revegetate Exclosure Area Within The Trout Creek Project Area | 11/07/2013 | ||||||
D | 85 | Replace Undersized Culverts In Upper Trout Creek Basin | 05/07/2013 | ||||||
E | 175 | Develop Design Specifications For Upper Trout Creek Culvert Replacement | 02/01/2013 | ||||||
F | 38 | Replace Undersized Culverts In Upper Trout Creek Basin | 05/07/2013 | ||||||
G | 26 | Monitor Exclosures | 02/01/2013 | ||||||
H | 186 | Maintain Riparian Corridor Fence | 05/07/2013 | ||||||
I | 186 | Maintain Bank Stabilization Structures | 05/07/2013 | ||||||
J | 186 | Maintain Instream Structures | 05/07/2013 | ||||||
K | 186 | Repair/Maintain Off Channel Water Development Sites | 05/07/2013 | ||||||
L | 157 | Document The Changes Of Habitat Restoration Practices In The Trout Creek Basin | 02/01/2013 | ||||||
M | 157 | Adult Redd Counts | 02/01/2013 | ||||||
N | 157 | Post Monitoring Each Phase (10 Miles ) Of Channel Habitat Improvement Reaches | 02/01/2013 | ||||||
O | 122 | Provide Technical Assistance & Input | 02/01/2013 | ||||||
P | 157 | Monitor Stream Water Temperature In The Trout Creek Basin | 05/07/2013 | ||||||
Q | 157 | Monitor Smolt Production & Adult Escapement | 02/14/2013 | ||||||
R | 190 | Remove/Exclude Hatchery Summer Steelhead | 02/14/2013 | ||||||
S | 158 | PIT Tag Out-Migrant Summer Steelhead Smolts | 02/14/2013 | ||||||
T | 159 | Submit & Acquire PIT Tag Data To/From PTAGIS | 02/01/2013 | ||||||
U | 162 | Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-Migrant Estimates | 02/01/2013 | ||||||
V | 185 | Periodic Status Reports for BPA | 02/01/2013 | ||||||
W | 132 | Produce Annual For 2/1/2013 to 12/31/2013 | 02/01/2013 | ||||||
X | 119 | Manage & Administer Project | 02/01/2013 |