Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 77126: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
Project Number:
Title:
Fort Hall Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Upper Snake Snake Upper 100.00%
Contract Number:
77126
Contract Title:
1992-010-00 EXP FORT HALL HABITAT RESTORATION
Contract Continuation:
Previous: Next:
74365: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
  • 77111 REL 10: 1992-010-00 EXP FORT HALL HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
Projects for FY17 will include locations on the Fort Hall Bottoms as in years past. The Bottoms is a flood plain on the Reservation adjacent to the Snake River with numerous artesian springs. Funding for sub-contracts will need to be utilized for the Doug's Sloping Project which include Final Design and Design Team to oversee pre-construction, including permitting, environmental review, bid selection of contractor and procurement of materials.  Projects for 2017-2018 will include construction of the Doug's Sloping enhancement project on Spring Creek per Design which will be completed in Fall 2017.  Continuation of the formal response to the ISRP will likely take place during the FY17, these will include a response package containing the Resident Fisheries Plan and limiting factors.
Account Type(s):
Expense
Contract Start Date:
09/01/2017
Contract End Date:
08/31/2018
Current Contract Value:
$140,555
Expenditures:
$140,555

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Lisa Dexter Bonneville Power Administration No Administrative Contact lldexter@bpa.gov (503) 230-3893
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Jacee Furniss Shoshone-Bannock Tribes No Administrative Contact jfurniss@sbtribes.com (208) 239-4551
Elsha Leavitt Shoshone-Bannock Tribes No Interested Party eleavitt@sbtribes.com (208) 478-3795
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Hunter Osborne Shoshone-Bannock Tribes Yes Contract Manager hosborne@sbtribes.com (208) 239-4564
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Pam Waterhouse Shoshone-Bannock Tribes No Administrative Contact pwaterhouse@sbtribes.com (208) 478-3819
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain all EC from BPA B: 165. Clearance from BPA 08/16/2018 08/31/2018
Community Coordination and Presentations C: 99. Community Presentations 07/31/2018 07/31/2018
Plants Purchased and Planted at Diggie Project Site D: 47. Protect and Restore Riparian Habitats of the Reservation Streams 07/31/2018 06/01/2018
Fence installed at Diggie Creek project location E: 40. Install fence to protect riparian areas and projects 02/01/2018 02/01/2018
Remove non-native fish species in Spring and Clear Creeks F: 190. Remove non-native/exotic fish 03/30/2018 03/15/2018
Field data sheets and logged on excel spreadsheets. G: 157. Treatment and control strata in Spring Creek and Clear Creek 07/26/2018 08/31/2018
Field data sheets, and entered on computer. H: 157. Treatment and control comparison in Diggie and Jimmy Drinks 06/29/2018
Produce design engineering document for Spring Creek Doug's Sloping Project I: 175. Produce designs for Spring Creek/Doug's Sloping 08/31/2018
Doug's Sloping habitat improvement for native cutthroat trout J: 29. Install Habitat Improvement Structures at Spring Creek/Doug's Sloping 08/01/2018
Collect data on fish habitat use and prey selection at various project sites. K: 162. Analyze Data Collected 08/31/2018 07/31/2018
Upload collected field data to Pisces. L: 161. Route field data collection copies to BPA 08/31/2018
Develop Monitoring Methods and Efficacy of Projects on Bottoms M: 156. Protocols for Monitoring and Efficacy of Projects on Bottoms Fish Populations 03/30/2018 03/30/2018
Administer contract N: 119. Routine administration of contract Budgets, CR, modifications 08/31/2018
Completed Annual Report O: 132. Submit Progress Report for the period (09/2017 to 08/2018) 08/31/2018 08/31/2018
Completed Annual Report P: 132. Submit Progress Report for the period (09/2016 to 08/2017) 08/31/2018
Completed Annual Report Q: 132. Submit Progress Report for the period (09/2015) to (08/2016) 02/28/2018 02/28/2018
Completed Annual Report R: 132. Submit Progress Report for the period (09/2014) to (08/2015) 02/28/2018 02/28/2018
Response to ISRP deliverables S: 174. ISRP response package to include Plan and limiting factors, efficacy of projects. 08/30/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Yellowstone (O. c. bouvieri)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 09/01/2017
B 165 Clearance from BPA 09/01/2017
C 99 Community Presentations 09/01/2017
D 47 Protect and Restore Riparian Habitats of the Reservation Streams 09/01/2017
E 40 Install fence to protect riparian areas and projects 09/01/2017
F 190 Remove non-native/exotic fish 09/01/2017
G 157 Treatment and control strata in Spring Creek and Clear Creek 09/01/2017
H 157 Treatment and control comparison in Diggie and Jimmy Drinks 09/01/2017
I 175 Produce designs for Spring Creek/Doug's Sloping 09/01/2017
J 29 Install Habitat Improvement Structures at Spring Creek/Doug's Sloping 09/01/2017
K 162 Analyze Data Collected 09/01/2017
L 161 Route field data collection copies to BPA 09/01/2017
M 156 Protocols for Monitoring and Efficacy of Projects on Bottoms Fish Populations 09/01/2017
N 119 Routine administration of contract Budgets, CR, modifications 09/01/2017
O 132 Submit Progress Report for the period (09/2017 to 08/2018) 09/01/2017
P 132 Submit Progress Report for the period (09/2016 to 08/2017) 09/01/2017
Q 132 Submit Progress Report for the period (09/2015) to (08/2016) 09/01/2017
R 132 Submit Progress Report for the period (09/2014) to (08/2015) 09/01/2017
S 174 ISRP response package to include Plan and limiting factors, efficacy of projects. 09/01/2017