Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 81783: 2010-077-00 EXP TUCANNON (PARENT) HABITAT PROGRAM: ADMIN & MANAGE
Project Number:
Title:
Tucannon River Programmatic Habitat Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Tucannon 100.00%
Contract Number:
81783
Contract Title:
2010-077-00 EXP TUCANNON (PARENT) HABITAT PROGRAM: ADMIN & MANAGE
Contract Continuation:
Previous: Next:
78510: 2010-077-00 EXP TUCANNON (PARENT) HABITAT PROGRAM: ADMIN & MANAGE
  • 84038: 2010-077-00 EXP TUCANNON (PARENT) HABITAT PROGRAM: ADMIN & MANAGE
Contract Status:
Closed
Contract Description:
Overview:  The Snake River Salmon Recovery Board (SRSRB) manages the Tucannon River Programmatic Habitat Project (2010-077-00) through this parent contract for the operations support, management organization, implementation assistance, and reporting described in this summary.  The goal of the Tucannon River programmatic is to restore habitat function and channel processes in the spring Chinook priority restoration reaches of the Tucannon River, leading to improved population productivity and abundance.  

Current Emphases:  Project management activities in 2019 will encompass the following major task: the SRSRB will assist CCD, CTUIR, NPT and WDFW staff to implement the ecological restoration and habitat improvement projects in the following priority stream reaches, including PA-13, PA-17 & 18 Phase II, PA-28 (riparian planting) and PA 32.  The SRSRB staff will also assist in the development and design of priority projects in the following areas; (USFS & CTUIR) PA-4 & 5, & PA-7, PA-17 & PA-18 Phase II, PA-32 Phase I (CCD), Tummalum Barrier (NPT), and PA-13 Phase I (WDFW).  These projects have been prioritized and selected for their high-benefit to spring Chinook habitat.  The primary focus of the six projects is to increase stream channel complexity through wood placement, and promote floodplain connectivity through increasing connection to side and off-channel habitats.  

The Programmatic has been involved in the completion of habitat designs on the projects proposed for implementation in 2019 including PA- 32, PA-17 Phase II, and PA-13 Phase I.  It is the intent of the Programmatic to be involved and present in the field during construction in support of WDFW, CTUIR and CCD, in 2019.  As projects completed by the program partners have had time to mature more and more private landowners are coming forward with interest in future habitat restoration.  In 2017, Project Area 17 & 18 (Phase I) is located on both WDFW and private properties, PA-17&18 Phase II will be entirely on private property, and PA-28 (Phase II & Phase III) being entirely on private property.  The program will continue to work as an intermediary with private landowners in the Tucannon  as project continue to be proposed and implemented. The program will assist the CCD, WDFW and CTUIR in conducting field surveys, reviewing field drawings and developing design for PA-13 (WDFW) ,PA-17/18 Phase II & PA-5/6, & 7 (CTUIR),  and PA-28 Phase (Riparian Planting) and Little Tucannon PALs Phase III for construction in 2019-20.

Background on the need to phase project areas:  Project areas 17 & 18 Phase II and PA 13 are being phased due to the size and complexities involved in both funding the projects (within a single fiscal-year) and permitting some of the actions proposed.  The two phased approach at PA-17 &18 will also provide an opportunity to develop design with private landowners.  The design contractor selected in 2015 for phase I  is working with CTUIR and the program to develop designs for phase II that balance landowner concerns with  the requirements of salmon and steelhead .  This continuity should lead to a quality restoration design which would be ready for implementation in 2020.  PA-28 is a long reach which did not fit within the typical fiscal constraints of the program and the SRFB.  Phase I was completed in 2016, followed by the implementation of Phase II in 2017, Phase III in 2018, and followed by additional riparian planting in 2019.  PA 13 is currently being Phased to accommodate both funding complexities as well limited seasonal work windows.   It is anticipated that work on PA 13 will begin in 2019 with completion in 2021.

The SRSRB will continue to work with sponsors to prioritize restoration actions and complete restoration designs for future implementation.  The SRSRB will support the CCD in updating and adapting  the design for PA-32 Phase I; and provide coordination for the CCD’s EC clearance in 2019-20. The SRSRB will continue to support the CCD in the completion of the Conceptual Restoration Plan update in 2018-19.  The SRSRB will support WDFW in the finalization and implementation of designs for PA-13, for implementation in 2019-20, and work in support with WDFW in securing project matching funds, EC clearance and review of those designs.  The SRSRB will support NPT in the assessment and coordination of the fish barrier assessment/design at the Tummalum Bridge.

To track progress of implementation toward goals in the Tucannon, the SRSRB will continue to conduct pre & post project surveys of conditions within the project reaches using a Rapid Habitat technique adapted from the CHaMP protocol.  The greatest value of the surveys to the Program is their use as an as-built condition of each project quickly following construction. The surveys will be made available to those conducting change detection research to better assist them in understanding the restoration activities and results.
___________________________________________________________

Background:  Habitat restoration projects developed though the programmatic are vetted in the SRSRB recovery process building local support in the communities where the restoration will take place.  Restoration projects recommended for funding under the programmatic have undergone multiple levels of review and technical comment before being recommended for implementation.  Only projects exhibiting high benefit to spring Chinook are currently recommended for funding, with selection criteria that prioritize projects that will address the limiting factors outlined for the Tucannon River in the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion.

Purpose:  The projects are expected to increase pool and LWD frequency, improve off-channel habitat, promote floodplain connectivity by increasing stream channel roughness (LWD), and increase channel and side channel length.

Objectives:  The restoration objectives for the Tucannon spring Chinook are as follows (channel structure, LWD and floodplain connectivity being the highest priority):  
  1.  Increase riparian function to 75% of maximum
  2.  Increase large woody debris to 2 or more pieces per channel width
  3.  Increase pool frequency to 15% of stream area
  4.  Reduce channel confinement/increase floodplain connectivity to at least 25% of river length
  5.  Reduce maximum daily water temperature so that it does not exceed 72F at confluence of Pataha Creek (RM 11.8 of the Tucannon)
  6.  Decrease substrate embeddedness to 20% in all reaches above confluence of Pataha Creek (RM 11.8).

Status:  In 2015, the SRSRB RTT worked with project sponsors to identify the high priority projects which are in stage of design that could put them in position for construction in the 2018 & 2020 work windows. The RTT has selected projects based on their ability to achieve measurable progress towards one or more of the objectives listed above, that are outlined in a work plan through 2020.  Solicitation of projects will take place annually as the following two years’ work is outlined and recommended to BPA for funding. Project designs will be evaluated by the RTT and the Snake River Salmon Recovery Board as they are developed leading into implementation.

In 2017, the Programmatic continued to use it annual project implementation funding to leverage matching grants from outside funders, and typically averages cost-share amounts between 200-400 k/fiscal year.  In 2016 >700k was awarded to the program sponsors from the SRFB for implementation in 2017.  It is not the desire of the programmatic nor sustainable to pursue grants of that size from the SRFB due to the funding impact on other projects within the region.  In 2019, it is anticipated matching funds will be pursued for PA 13 for implementation in 2019-20, the sum of this application will range between 200-400k based on available funds in 2019 SRFB round.  The Programmatic provides technical support to its project sponsors in the pursuit and acquisition of matching grants for both the design and construction of projects within the framework of the review and evaluation process for the Tucannon.

Management Considerations: Implementation of projects is expected to be completed by the Washington Department of Fish and Wildlife, Columbia Conservation District, Regional Fisheries Enhancement Group (legislative program that supports non-profit groups of volunteers who cooperate with the Washington Department of Fish and Wildlife to improve salmon resources throughout the state), the Confederated Tribes of the Umatilla Indian Reservation, Pomeroy Conservation District, Nez Pierce Tribe and/or other qualified groups, tribes, or agencies that submit proposals that are approved by the SRSRB.

This ongoing BPA contract support will facilitate the development of future projects and the refinement of the work plan as well as soliciting project sponsors for implementation.  The SRSRB will also facilitate the collection and reporting of data for implementation status, action and habitat effectiveness, and trend monitoring.  The SRSRB will update the Habitat Work Schedule restoration project data base with new project starts, and the completion status for active projects.  With long-term and sufficient funding levels, restoring channel processes and habitat function across large reaches will improve spring Chinook productivity in the Tucannon River.
Account Type(s):
Expense
Contract Start Date:
04/01/2019
Contract End Date:
03/31/2020
Current Contract Value:
$171,988
Expenditures:
$171,988

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Kris Buelow Snake River Salmon Recovery Board Yes Contract Manager kris@snakeriverboard.org (509) 392-3858
John Foltz Snake River Salmon Recovery Board Yes Supervisor john@snakeriverboard.org (509) 382-4115
Daniel Gambetta Bonneville Power Administration Yes Env. Compliance Lead dagambetta@bpa.gov (503) 230-3493
Heidi Haak Bonneville Power Administration No Administrative Contact hlhaak@bpa.gov (541) 922-6856
David Karl Washington Department of Fish and Wildlife (WDFW) No Technical Contact karldbk@dfw.wa.gov (509) 527-4138
Andre L'Heureux Bonneville Power Administration Yes COR allheureux@bpa.gov (503) 230-4482
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Tybee Sheidler Bonneville Power Administration No Administrative Contact tasheidler@bpa.gov (503) 230-3820
Janet Snell Walla Walla Community College Yes Administrative Contact janet.snell@wwcc.edu (509) 527-4664
Elham Zolmajd-Haghighi Bonneville Power Administration Yes Contracting Officer ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Habitat Program Implementation Management and Contract Administration 03/31/2020 03/31/2020
Timely environmental compliance assistance and clearance documentation B: 165. Environmental Compliance Documentation and Clearance 03/31/2020 03/31/2020
Meetings, tours, presentations and outreach material development C: 99. Community Involvement & Education 03/31/2020 03/31/2020
Restoration project list (prioritized); implementation work plan/schedule; program guidance D: 114. Program Guidance and Prioritized Project List 03/31/2020 03/31/2020
Coordinate project design development and manage implementation planning E: 175. Project development oversight: design review, management assistance, and implementation planning 03/31/2020 03/31/2020
Effectiveness and Change Detection Data Collection, Analysis & Summary F: 157. Change Detection and Effectiveness Monitoring Design Review (2019) 11/29/2019 11/29/2019
Conceptual Restoration Strategy Update and Revised Implementation Planning Framework G: 174. Conceptual Habitat Restoration Strategy: Plan Update (2019) 03/31/2020 03/31/2020
Provide pre-construction projectmanagement support; oversee and coordinate construction activities; validate the design buildout H: 100. Integrated Construction Planning: Support Implementation Across Project Areas (PA-13, 16/17, 28 & Little Tucannon) 01/03/2020 03/31/2020
Submit 12-mos (Annual) Progress Report: Calendar-year 2019 I: 132. Progress Report: Calendar-year 2019 (01/01/2019 - 12/31/2019) 03/31/2020 03/31/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Habitat Program Implementation Management and Contract Administration 04/01/2019
B 165 Environmental Compliance Documentation and Clearance 04/01/2019
C 99 Community Involvement & Education 04/01/2019
D 114 Program Guidance and Prioritized Project List 04/01/2019
E 175 Project development oversight: design review, management assistance, and implementation planning 04/01/2019
F 157 Change Detection and Effectiveness Monitoring Design Review (2019) 04/01/2019
G 174 Conceptual Habitat Restoration Strategy: Plan Update (2019) 04/01/2019
H 100 Integrated Construction Planning: Support Implementation Across Project Areas (PA-13, 16/17, 28 & Little Tucannon) 04/01/2019
I 132 Progress Report: Calendar-year 2019 (01/01/2019 - 12/31/2019) 04/01/2019
J 185 Periodic Status Reports for BPA 04/01/2019