SOW Report
Contract 100229: 2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
Project Number:
Project Title:
Walla Walla Basinwide Tributary Passage and Flow
BPA PM:
Project Stage:
Implementation
Project Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
100229
Contract Title:
2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
Contract Continuation:
Previous: Next:
97889: 2007-396-00 EXP WALLA WALLA BASINWIDE TRIB PASSAGE
Contract Status:
Issued
Contract Description:
High summertime water temperatures and a lack of functional tributary habitat are two primary limiting factors for native aquatic species in the Walla Walla Basin. Under this BPA contract, the Walla Walla Basin Watershed Council (WWBWC) will continue our ongoing work to improve channel complexity, floodplain connectivity, riparian function, and water quality in the North Fork Walla Walla River and Couse Creek. WWBWC uses process-based restoration techniques to jumpstart natural geomorphic processes that create functional, resilient, and self-sustaining aquatic and riparian habitat for the primary benefit of ESA-listed Mid-Columbia summer steelhead and secondarily for bull trout, reintroduced spring Chinook salmon, and resident redband and rainbow trout. In 2025 with funding from the Oregon Watershed Enhancement Board, WWBWC conducted redd counts and snorkel surveys in restoration treatment reaches. The surveys documented steelhead spawning activity and presence of redband/rainbow trout, spring Chinook salmon, and bull trout in the North Fork Walla Walla River. In Couse Creek, we documented steelhead spawning and presence of redband/rainbow trout.

BPA-funded work on the North Fork Walla Walla River includes two implementation phases and one design phase that will advance efforts to complete a 5-mile restoration reach on private property. The projects are located within a priority reach identified in the CTUIR's 2024 Upper Walla Walla Watershed Action Plan. Restoration treatments at these sites are designed to improve habitat suitability for all life stages of mid-Columbia steelhead, bull trout, resident redband and rainbow trout, and juvenile rearing for Chinook salmon.  

Couse Creek projects include an implementation phase at RM 7 and a design phase at RM 1, which were both identified in WWBWC's 2020 Couse Creek Watershed Assessment. Couse Creek is utilized by all life stages of mid-Columbia steelhead, resident redband, and rainbow trout. While not observed during the 2025 surveys, bull trout and juvenile spring Chinook salmon have been previously observed in the lower reaches of Couse Creek.

This 2026-2028 contract also includes assessment work on Cottonwood Creek, another Walla Walla basin tributary used by mid-Columbia steelhead. The assessment will identify specific actions to improve geomorphic function, floodplain connectivity, and water quality to benefit all life stages of mid-Columbia steelhead and also resident redband and rainbow trout.

The WWBWC identified these projects through staff conversations with basin partners, working with property owners, and review of limiting factors and priorities listed in both local planning documents and regional salmon recovery plans. In alignment with the Walla Walla Water 2050 Watershed Strategy, all identified projects address 2050 priorities and strive to meet the desired future conditions of our watershed established by the 2050 Basin Advisory Committee.
Account Type(s):
Expense
Contract Start Date:
11/01/2026
Contract End Date:
10/31/2028
Current Contract Value:
$1,486,237
Expenditures:

* Expenditures data includes accruals and are based on data through 31-Oct-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
Habitat Improvement
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Luke Adams Walla Walla Basin Watershed Council No Technical Contact luke.adams@wwbwc.org (541) 938-2170
Daniel Affonso Bonneville Power Administration Yes Contracting Officer dxaffonso@bpa.gov (503) 230-5918
Cat Garza Walla Walla Basin Watershed Council No Technical Contact cat.garza@wwbwc.org (541) 938-2170
Sara Harris Walla Walla Basin Watershed Council No Technical Contact sara.harris@wwbwc.org (541) 938-2170
Wendy Harris Walla Walla Basin Watershed Council No Administrative Contact wendy.harris@wwbwc.org (541) 938-2170
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Michelle McClellan Walla Walla Basin Watershed Council Yes Supervisor michelle.mcclellan@wwbwc.org (541) 938-2170
Lindsey Mills Bonneville Power Administration Yes Env. Compliance Lead LDMills@bpa.gov (503) 230-4039
Tara Patten Walla Walla Basin Watershed Council Yes Contract Manager tara.patten@wwbwc.org (541) 938-2170


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Oversight of Project Activities 10/31/2028
Environmental consultation complete C: 165. Environmental Compliance Documentation for all contract actions 10/31/2028
Completed Progress (Annual) Report D: 132. Submit Annual Progress Report for the period Nov 2025 to Oct 2026 07/30/2027
Completed Progress (Annual) Report E: 132. Submit Annual Progress Report for the period Nov 2026 to Oct 2027 07/30/2028
Walla Walla 2050 Watershed Strategy implemented F: 191. Walla Walla Basin Watershed Coordination 10/31/2028
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish G: 114. Identify and select projects for Walla Walla Basin 10/31/2028
Youth, landowners, non-traditional partners, and other priority groups are engaged through a variety of outreach and educational programs and activities H: 99. Youth and adult project presentations & engagement 10/31/2028
Oregon-side engagement, access, and data collection summary supporting the Yellowhawk Assessment I: 115. Yellowhawk/Cottonwood Creek Assessment 10/31/2028
Provide final 100% design package J: 175. North Fork Walla Walla River RM 8-9 Floodplain Restoration 100% Design 06/30/2027
Complete entire restoration project implementation process K: 29. Floodplain Restoration North Fork Walla River RM 6.5-8 Implementation 10/31/2027
Construct the project in accordance with final designs L: 29. Floodplain Restoration North Fork Walla River RM 8-9 Implementation 10/31/2028
Construct Fence M: 40. Install riparian livestock exclusion fence at Couse Creek RM 4 10/31/2028
Upload final design set N: 175. Couse Creek RM 1 Design 10/31/2028
Construct the project in accordance with final designs O: 29. Couse Creek RM 7 Floodplain Restoration 10/31/2028
Produce accessible, error-checked datasets P: 157. Collect Stream Flow Data for Fish Passage, Flow Restoration and Trend Monitoring 10/31/2028
Deliverable: An accessible, error-checked data set with metadata Q: 162. Analyze Stream Flow Data for Fish Passage, Flow Restoration and Trend Monitoring 10/31/2028
Upload data to the WWBWC publicly accessible website R: 160. Maintain Stream Flow Database for Fish Passage, Flow Restoration and Trend Monitoring 10/31/2028
Produce accessible, error-checked datasets S: 157. Collect Water Temperature Data for Fish Habitat Monitoring and Trend Monitoring 10/31/2028
Deliverable: An accessible, error-checked data set with metadata T: 162. Analyze Water Temperature Data for Fish Habitat Monitoring and Trend Monitoring 10/31/2028
Upload data to publicly accessible website. U: 160. Maintain Water Temperature Database for Fish Habitat Monitoring and Trend Monitoring 10/31/2028

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Quarterly Status Reports for BPA
B 119 Oversight of Project Activities
C 165 Environmental Compliance Documentation for all contract actions
D 132 Submit Annual Progress Report for the period Nov 2025 to Oct 2026
E 132 Submit Annual Progress Report for the period Nov 2026 to Oct 2027
F 191 Walla Walla Basin Watershed Coordination
G 114 Identify and select projects for Walla Walla Basin
H 99 Youth and adult project presentations & engagement
I 115 Yellowhawk/Cottonwood Creek Assessment 07/17/2026
J 175 North Fork Walla Walla River RM 8-9 Floodplain Restoration 100% Design 07/17/2026
K 29 Floodplain Restoration North Fork Walla River RM 6.5-8 Implementation
L 29 Floodplain Restoration North Fork Walla River RM 8-9 Implementation
M 40 Install riparian livestock exclusion fence at Couse Creek RM 4
N 175 Couse Creek RM 1 Design 07/17/2026
O 29 Couse Creek RM 7 Floodplain Restoration
P 157 Collect Stream Flow Data for Fish Passage, Flow Restoration and Trend Monitoring 07/17/2026
Q 162 Analyze Stream Flow Data for Fish Passage, Flow Restoration and Trend Monitoring
R 160 Maintain Stream Flow Database for Fish Passage, Flow Restoration and Trend Monitoring
S 157 Collect Water Temperature Data for Fish Habitat Monitoring and Trend Monitoring 07/17/2026
T 162 Analyze Water Temperature Data for Fish Habitat Monitoring and Trend Monitoring
U 160 Maintain Water Temperature Database for Fish Habitat Monitoring and Trend Monitoring