Close Message
CBFish website will be offline for approximately one hour starting at 5 PM today for maintenance. Thank you for your patience.
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 23693: 2002-032-00 EXP USGS FALL CHIN PASSAGE AT LOWER GRANITE DAM
Project Number:
Title:
Snake River Fall Chinook Salmon Life History Investigations
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
23693
Contract Title:
2002-032-00 EXP USGS FALL CHIN PASSAGE AT LOWER GRANITE DAM
Contract Continuation:
Previous: Next:
18865: 2002-032-00 PI FALL CHINOOK PASSAGE AT LOWER GRANITE DAM
  • 28238: 2002-032-00 EXP USGS FALL CHINOOK PASSAGE AT LOWER GRANITE DAM
Contract Status:
Closed
Contract Description:
BACKGROUND

Juvenile fall chinook salmon Oncorhynchus tshawytscha listed for protection under the Endangered Species Act mostly have an ocean-type life history.  Fry emerge in the spring, grow rapidly, and migrate from the Snake River during summer.  However, some of the later emerging and slower growing juvenile fall chinook salmon fail to leave the Snake River as subyearlings, overwinter in the reservoir, and then resume seaward migration the following spring as yearlings (hereafter, holdover smolts).  This is especially prevalent in the lower Clearwater River, which produces the latest emerging fry of present-day production areas.  In recent years as part of other studies, researchers have compiled moderate amounts of unpublished data that suggests that wild juvenile Snake River fall chinook salmon that holdover in the lower Snake River reservoirs contribute up to 30% to adult production.  Existing data cannot be used to determine the specific time holdover fall chinook salmon smolts pass dams in the Snake and Columbia River, but there is a good chance that passage occurs during late winter when fish bypass facilities are shut down.  This means holdover smolts pass through the turbines and are susceptible to blade strike.  Our new project will refine existing methods for determining the age and genetic lineage of holdover fall chinook salmon, compile and publish the existing data on holdover fall chinook salmon, and then document passage timing of holdover fall chinook salmon smolts at Lower Granite Dam.



COORDINATION

Coordination with the agencies and tribes is necessary to avoid duplicating work and to make efficient use of existing resources and personnel.  We will coordinate our research with the Bonneville Power Administration, Environmental Protection Agency, Fish Passage Center, Idaho Fish and Game, Idaho Power Company, National Marine Fisheries Service, Nez Perce Tribe, Oregon Department of Fish and Wildlife, Pacific States Marine Fisheries Commission, U. S. Army Corps of Engineers, U. S. Fish and Wildlife Service, U. S. Geological Survey, University of Idaho, and Washington Department of Fish and Wildlife.



GOAL

Our research goal is to provide fishery managers with a complete description of holdover by juvenile Snake River fall chinook salmon, so that the management implications of this atypical migrational behavior can be understood.

OBJECTIVES AND RATIONALE

Objective 1:   Determine if holdover wild fall chinook salmon pass Lower Granite Dam during the winter when the fish bypass systems are shut down.

Rationale: If holdover wild fall chinook salmon pass Lower Granite Dam in the winter, it is likely that a high percentage of the fish are killed by turbine blade strike.  Starting fish bypass operations in March, rather than in April, might lead to large increases in fall chinook salmon adult returns to the Snake River.  Objective 1 of our study will provide mangers with the data to decide if earlier operation of the fish bypass system at Lower Granite Dam should be considered.
Account Type(s):
Expense
Contract Start Date:
08/01/2005
Contract End Date:
07/31/2006
Current Contract Value:
$37,619
Expenditures:
$37,619

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
None
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Michele Beeman US Geological Survey (USGS) No Administrative Contact mbeeman@usgs.gov (509) 538-2299x263
Deborah Docherty Bonneville Power Administration Yes COR dldocherty@bpa.gov (503) 230-4458
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Kenneth Tiffan US Geological Survey (USGS) Yes Contract Manager ken_tiffan@usgs.gov (509) 538-2972


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Equipment installation A: 70. Install radio telemetry detection equipment 09/30/2005 10/26/2005
Deliverable complete B: 158. Collect, tag, and release fish 02/25/2006 12/15/2005
Deliverable complete C: 157. Monitor winter passage and movement of radio-tagged fish 05/31/2006 05/01/2006
Deliverable complete D: 162. Describe occurrence and timing of winter passage of holdover chinook 07/31/2006 07/31/2006
Deliverable complete E: 132. Annual report 11/30/2005 11/30/2005
Deliverable complete F: 119. Manage and administer Project 200203200 06/10/2006 06/12/2006
Deliverable complete G: 165. Ensure environmental compliance requirements have been met 05/01/2006 05/15/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 70 Install radio telemetry detection equipment
B 158 Collect, tag, and release fish
C 157 Monitor winter passage and movement of radio-tagged fish
D 162 Describe occurrence and timing of winter passage of holdover chinook
E 132 Annual report
F 119 Manage and administer Project 200203200
G 165 Ensure environmental compliance requirements have been met
H 185 Quarterly Reports