Close Message
CBFish website will be offline for approximately one hour starting at 5 PM today for maintenance. Thank you for your patience.
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 24409: 199601100 EXP NURSERY BRIDGE COST-SHARE, WALLA WALLA
Project Number:
Title:
Walla Walla Juvenile and Adult Passage Improvements
Stage:
Closed
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
24409
Contract Title:
199601100 EXP NURSERY BRIDGE COST-SHARE, WALLA WALLA
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
Total budget for this work is $119,000 with the Milton-Freewater Water Control District providing $29,750 in cost share.

Work already completed (see below): $40,000
Data Collection - Surveying: $47,000
Develop Synthesized Hydrology: $  7,000
Create Implementation Plan: $25,000

Sub-Total: $119,000
25% cost share provided by MFWCD: $  29,750
Admin fee for MFWCD of 4%: $    1,190
BPA grant amount to MFWCD: $  30,940

Purpose of this undertaking is to provide solutions to operational problems experienced by the Nursery Bridge fish ladder after construction in 2001.  Solutions will include devising ways to transport bedload through the adjoining stilling basins to eliminate blockage of ladder entrances; reduce debris and sediment accumulation within the ladder; provide a more permanent and reliable wtaer supply to the ladder; address erosion downstream of the ladder.  This is a 25% cost share with the Corps of Engineers and the Corps will manage the research project.  

Work already completed by the Contractor:
a. The Contractor shall provide a senior hydraulic engineer with training and experience in river mechanics and geomorphology to attend a site visit to the Nursery Bridge fishway facility near Milton-Freewater, Oregon lead by USACE personnel.  The site visit is planned for June 13, 2005 and will convene at the Walla Walla District office at 8:00 am.
b. Immediately after the site visit (extending until 5:00 p.m., June 13) and continuing from 8:00 am to noon the next day (June 14), the contractor's engineer shall meet with USACE personnel at the Walla Walla District office to discuss site visit observations and brainstorm solutions to operational problems.
c. Prior to attending the site visit, the contractor's engineer shall review government furnished information to get a preliminary understanding of the operational problems that have occurred at the fishway facility.
d. Following the site visit and discussion meeting, contractor shall provide a brief write-up and sketches summarizing key points and recommendations from the contractor's perspective.  The write-up is to be submitted by email to the Corps' Technical Lead POC (see paragraph 9.0) within 10 working days of the discussion meeting at the District office.

Work already done by the Corps included coodination associated with an interagency meeting to discuss the Corps' report of solution options and to reach agreement on ways to proceed.  Corps labor also included time and effort necessary in preparing and administering the task order to the contractor.  Another interagency meeting/site visit was conducted with the contractor prior to the contractor furnishing his recommendations.  Additional Corps labor has involved exercising an option to the task order for the contractor to participate with the Corps in preparing a detailed plan for solutions to include sequential phased approaches including design sketches and cost estimates.  The Corps has also proceeded with analyzing flows toward making recommendations for shutting the ladder down at certain flows while minimizing impacts to fish passage.

Expenditures to date for the above combined work (Corps labor and contract) is approximately $40,000.
Account Type(s):
Expense
Contract Start Date:
09/01/2005
Contract End Date:
12/31/2005
Current Contract Value:
$30,940
Expenditures:
$30,940

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Pricing Method:
Firm Fixed Price
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Documentation and assistance to support BPA's Environmental Compliance Group A: 165. Environmental compliance for contract activities 09/20/2005 10/12/2005
Brief report on work completed C: 157. Data collection - surveying 12/05/2005 11/28/2005
Report D: 162. Develop Synthesized Hydrology 11/07/2005 11/28/2005
Final report complete E: 174. Implementation Plan 12/31/2005
Project administration F: 119. Admin costs for Milton-Freewater Water Control District 09/26/2005

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance for contract activities
B 185 Quarterly status reports
C 157 Data collection - surveying
D 162 Develop Synthesized Hydrology
E 174 Implementation Plan
F 119 Admin costs for Milton-Freewater Water Control District