Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 24575: 200304100 EXP EVAL SALMON THRU SNAKE R DAMS
Project Number:
Title:
Evaluate Delayed (Extra) Mortality Associated with Passage of Yearling Chinook Salmon through Snake River Dams
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
24575
Contract Title:
200304100 EXP EVAL SALMON THRU SNAKE R DAMS
Contract Continuation:
Previous: Next:
16576: 2003-041-00 EVAL SALMON THRU SNAKE R DAMS
  • 32992: 200304100 EXP EVAL SALMON THRU SNAKE R DAMS
Contract Status:
Closed
Contract Description:
The goal of this study is to determine whether migration through Snake River dams and reservoirs causes extra mortality in Snake River yearling (spring/summer) chinook salmon smolts.  Specifically, the study will determine if life-cycle survival downstream from McNary Dam is significantly higher for yearling chinook salmon released into the Ice Harbor Dam tailrace than for counterparts which must pass three additional dams and reservoirs after release into the Lower Granite Dam tailrace.

Whether or not migration through the FCRPS, as currently configured, causes mortality to anadromous salmonid smolts that is not expressed until after they have passed through the system is one of the most important questions currently facing the region.  Experimentation will be required to confirm or refute this hypothesized mortality.  If it is real, a precise estimate of its magnitude will be essential to determine the degree to which dam removal would increase life-cycle survival.

The study proposed in this Scope of Work directly addresses RPA 195 and will provide data related to RPA 189 of the 2000 FCRPS Biological Opinion (2000 BiOp).  Study fish will also provide additional inriver survival estimates.  The large sample sizes will produce highly precise estimates of inriver survival which can be incorporated into Performance Standard tests as outlined in the 2000 BiOp.  In addition, the study directly addresses the need to evaluate extra mortality as described under RM&E Strategy 3: Critical Uncertainties in the Final Updated Proposed Action for the 2004 FCRPS BiOp Remand.

Work elements and milestones for the 2006 study year are provided below.  NMFS will keep the BPA COTR apprised of any work scheduling limitations or alterations.
Account Type(s):
Expense
Contract Start Date:
10/01/2005
Contract End Date:
03/31/2007
Current Contract Value:
$780,495
Expenditures:
$780,495

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Detections of All Study Fish at McNary Dam A: 159. Detect Study Fish 09/30/2006 01/03/2007
Fulfill NEPA Requirements B: 165. Produce Environmental Compliance Documentation 02/28/2006 02/28/2006
Three Study Groups of Juvenile Hatchery-Reared Fish PIT-Tagged & Release C: 158. Tag & Release Juvenile Study Fish 08/31/2006 08/31/2006
Statistically-Bound Annual Study Year & Final L/Is D: 162. Analyze Recovery Data 09/30/2006 01/03/2007
Annual Report Submitted - Uploaded To BPA Website E: 132. Prepare Annual Report 07/14/2006 07/24/2006
Fulfill NEPA Requirements F: 165. Produce Environmental Compliance Documentation 01/31/2007 01/25/2007
COPY: Statistically-Bound Annual Study Year & Final L/Is G: 162. Analyze Recovery Data 10/31/2006 01/03/2007
Annual Report Submitted - Uploaded To BPA Website H: 132. Prepare Annual Report 01/31/2007 01/31/2007
Manage Details of Project J: 119. Manage Project 01/31/2007 01/31/2007
Manage Details of Project K: 119. Manage Project 03/31/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 159 Detect Study Fish
B 165 Produce Environmental Compliance Documentation
C 158 Tag & Release Juvenile Study Fish
D 162 Analyze Recovery Data
E 132 Prepare Annual Report
F 165 Produce Environmental Compliance Documentation
G 162 Analyze Recovery Data
H 132 Prepare Annual Report
I 185 Periodic Status Reports for BPA
J 119 Manage Project
K 119 Manage Project