Contract 24674: 200500900 EXP TWISP SIDE CHANNEL
Project Number:
Title:
Twisp Side Channel
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Methow 100.00%
Contract Number:
24674
Contract Title:
200500900 EXP TWISP SIDE CHANNEL
Contract Continuation:
Previous: Next:
n/a
  • 30075: 200500900 EXP TWISP SIDE CHANNEL PHASE 2
Contract Status:
History
Contract Description:
This phase of the project includes replacement of the existing culvert with a control headgate designed to operate throughout the year and provide fish passage through the diversion structure to the side channel.  The rock dike will remain to protect a home immediately downstream of the intake structure.

In addition the Contract Change Request is to extend the contract so that the sponsor can complete the Habitat Improvement Program Biological Opinion Implementation Monitoring Report.
Account Type(s):
Expense
Contract Start Date:
09/20/2005
Contract End Date:
08/31/2006
Current Contract Value:
$81,568
Expenditures:
$81,568

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chris Eliassen Methow Salmon Recovery Foundation Yes Administrative Contact chrise@methowsalmon.org (509) 996-2787
Linda Hermeston Bonneville Power Administration Yes COR llhermeston@bpa.gov (503) 230-4764
Chris Johnson Chewuch Basin Council No Contract Manager johnson_plan@communitynet.org (509) 422-0300
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Colleen Spiering Bonneville Power Administration No Env. Compliance Lead caspiering@bpa.gov (503) 230-5756


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Provide BPA Year End Accrual Report A: 119. Provide budget information to BPA 09/26/2005 02/16/2006
New headgate installed to BOR specifications B: 30. Create Twisp Side Channel through headgate replacement 10/31/2005 02/16/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 184 Install Fish Passage Structure
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 184 Install Fish Passage Structure
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 184 Install Fish Passage Structure
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Provide budget information to BPA
B 30 Create Twisp Side Channel through headgate replacement
C 184 Remove existing intake install new headgate
D 185 Provide Quarterly Status Reporting