Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 25661: PI 1994-017-00 PL IDAHO MODEL WATERSHED HABITAT- CUSTER
Project Number:
Title:
Idaho Model Watershed Habitat
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
25661
Contract Title:
PI 1994-017-00 PL IDAHO MODEL WATERSHED HABITAT- CUSTER
Contract Continuation:
Previous: Next:
19780: PI 1994-017-00 PL ADMIN/IMPLENTATION HOLISTIC RESTORATION
Contract Status:
History
Contract Description:
BPA Project Number:  1994-017-00
Contract Number:  
Contract Title:
Performance/Budget Period: October 1, 2004 through September 30, 2005
BPA Project Title: Holistic Restoration of Critical Habitat in the Pahsimeroi, East Fork and Upper Salmon Watersheds

Custer Soil and Water Conservation District
Ted O'Neal, Chairman
P. O. Box 305
Challis, Idaho  83226


Rick Philps, Contract Officer
P. O. Box 305
Challis, Idaho  83226


Karma Bragg, Project Manager
P. O. Box 305
Challis, Idaho  83226
cswcd@custertel.net
Phone: 208-879-4428
Fax: 208-879-5903

The project scope is to implement high priority action items to maintain, enhance and restore fish habitat and fish passage in the priority stream segments of the Upper Salmon Basin area within the administrative boundaries of the Custer Soil and Water Conservation District.

Implementation of measures funded under this plan will achieve the objective of the Northwest Power Planning Council's Strategy for Salmon Recovery, the National Marine Fisheries Service Salmon Recovery Plan in terms of stabilizing and improving habitat for anadromous fish and the "Four Governors Salmon Recovery Recommendations for Salmon Recovery". Migratory and habitat connectivity across the watershed's valley bottom areas is of high importance to ecologically-based restoration efforts because the tributary sub-watersheds tend to be dominated by federal lands and often provide habitat strongholds for native species of fish and wildlife.

Key habitat limitations in the watershed's bottomland areas include migration problems/ blockages and streambed sedimentation. Addressing these limitations may offer an opportunity to enhance the watershed's anadromous salmonids and will clearly benefit other native species of salmonids, other fish, and wildlife.  The primary opportunity for addressing these problems in the Pahsimeroi, East Fork and Upper Salmon watersheds is through the CSWCD and their collaborative efforts on non-federal land.
Account Type(s):
Expense
Contract Start Date:
01/01/2006
Contract End Date:
12/31/2006
Current Contract Value:
$318,887
Expenditures:
$318,887

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jan Brady Bonneville Power Administration Yes COR jebrady@bpa.gov (503) 230-4514
Karma Bragg Custer Soil and Water Conservation District (SWCD) Yes Technical Contact cswcd@custertel.net (208) 879-4428
Mickey Carter Bonneville Power Administration No Env. Compliance Lead macarter@bpa.gov (503) 230-5885
Terry Holtcamp Jr Bonneville Power Administration Yes Contracting Officer taholtcamp@bpa.gov (503) 230-3518
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Funding Package-sign contract A: 119. Manage and Administer Projects 12/22/2006 12/22/2006
Deliverable complete B: 114. Identify and Select Projects 09/30/2006 09/30/2006
EC documents on file C: 165. Produce Environmental Compliance Documentation 07/31/2006 09/28/2006
Contracts D: 118. Coordination 12/22/2006 12/22/2006
East Fork 15 Diversion Modification E: 84. East Fork 15 Diversion Modification 09/30/2006 09/28/2006
S-40 Diversion Modification F: 84. S-40 Diversion Modification 09/15/2006 09/28/2006
Remove P-10 Diversion Structure G: 84. P-10 Remove/Install Diversion 09/15/2006
Modifiy Pole Creek Diversion H: 84. Pole Creek Remove/Install Diversion 09/15/2006
Robinson Bar Bridge I: 184. Robinson Bar Ranch Culvert Replacement 09/15/2006
Install Muddy Springs Fence J: 40. Install Fence Muddy Springs Fence 12/22/2006
Fence Installed K: 40. Last Chance Riparian Fence 12/22/2006 12/30/2006
IRMR Riparian Fence L: 40. Install Fence on IRMR 10/10/2006 11/13/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 40 Install Fence
  • 2 instances of WE 84 Remove/Install Diversion
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 2 instances of WE 40 Install Fence
  • 1 instance of WE 84 Remove/Install Diversion
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 40 Install Fence
  • 2 instances of WE 84 Remove/Install Diversion

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer Projects
B 114 Identify and Select Projects
C 165 Produce Environmental Compliance Documentation
D 118 Coordination
E 84 East Fork 15 Diversion Modification
F 84 S-40 Diversion Modification
G 84 P-10 Remove/Install Diversion
H 84 Pole Creek Remove/Install Diversion
I 184 Robinson Bar Ranch Culvert Replacement
J 40 Install Fence Muddy Springs Fence
K 40 Last Chance Riparian Fence
L 40 Install Fence on IRMR
M 186 O/M as needed
N 132 Annual Report
O 185 Status Reporting