Contract 26294: 1992-061-00 IDF&G ALBENI FALLS ADMINISTRATIVE CONTRACT
Project Number:
Title:
Albeni Falls Wildlife Mitigation Capital Land Acquisitions
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
26294
Contract Title:
1992-061-00 IDF&G ALBENI FALLS ADMINISTRATIVE CONTRACT
Contract Continuation:
Previous: Next:
16694: PI 1992-061-00 ALBENI FALLS WILDLIFE MITIGATION
  • 31272: 1992-061-00 ALBENI FALLS ADMINISTRATIVE CONTRACT
Contract Status:
History
Contract Description:
Background

The Pacific Northwest Electric Power Planning and Conservation Act (Act) of 1980 (Public Law 96-501) directed that measures be implemented by BPA to protect, mitigate, and enhance fish and wildlife to the extent affected by development and operation of hydropower projects on the Columbia River system (Martin et al. 1988).  The Act created the Northwest Power Planning Council (NPPC or Council), which in turn developed the Columbia River Basin Fish and Wildlife Program (Program). Under the Act, BPA has the authority and obligation to fund fish and wildlife mitigation activities that are consistent with the Council's Fish and Wildlife Program (USDE 1996).

Part of the Program was the development of wildlife protection, mitigation, and enhancement plans for each of the hydropower facilities on the Columbia River system and ultimately, implementation of the plans to mitigate wildlife habitat losses.  The IDFG developed a mitigation plan in 1987 for the Albeni Falls hydroelectric facility that was constructed by the U.S. Army, Corps of Engineers (COE) on the Pend Oreille River in Bonner County, Idaho between 1951 and 1955 (Martin et al. 1988). Mitigation plans for wildlife habitat losses at each of the Columbia River Basin dams were submitted by BPA to the Northwest Power Planning Council in 1989 including the mitigation plan for Albeni Falls Dam in Idaho (USDE 1996).  The Council reviewed and approved the Albeni Falls plan in 1990 (USDE 1996).

BPA prepared the Albeni Falls Wildlife Management Plan: Environmental Assessment in 1996.  The plan guides the development of wildlife mitigation projects associated with Albeni Falls Dam proposed by the IDFG and the Albeni Falls Interagency Work Group, approved by the Northwest Power Planning Council, and proposed for funding by BPA.  The plan enables the IDFG and the Kalispel, Coeur d'Alene, and Kootenai Indian Tribes to: 1) Protect and enhance through land acquisition, a variety of wetland and riparian habitats; 2) Restore 28,587 Habitat Units (HUs lost as a result of the construction of Albeni Falls Dam, and; 3) Conduct long-term wildlife habitat management activities at individual mitigation project sites (USDE 1996). In lieu of annualizing HU losses the NPPC has decided to mitigate losses at a 2:1 ratio. That is, for every 2 HUs protected the HU ledger will be reduced by 1 HU.

The Northern Idaho Wildlife Mitigation Agreement was jointly prepared and approved by the IDFG and BPA in June 1997 (BPA and IDFG 1997).


This Idaho Department of Fish and Game administrative contract assumes the responsibility of collecting, maintaining and forwarding to BPA any and all documentation pertaining to NEPA/ESA compliance measures that must be undertaken prior to the start of implementation activities occurring on the Boundary Creek WMA and on the Pend Oreille WMA's.
Account Type(s):
Expense
Contract Start Date:
03/01/2006
Contract End Date:
02/28/2007
Current Contract Value:
$144,835
Expenditures:
$144,835

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Conan Chiu Idaho Department of Fish and Game (IDFG) No Administrative Contact conan.chiu@idfg.idaho.gov (208) 287-2813
Katherine Cousins Idaho Department of Fish and Game (IDFG) Yes Contract Manager kathy.cousins@idfg.idaho.gov (208) 769-1414
Terry Holtcamp Jr Bonneville Power Administration Yes Contracting Officer taholtcamp@bpa.gov (503) 230-3518
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Shannon Stewart Bonneville Power Administration Yes Env. Compliance Lead scstewart@bpa.gov (503) 230-5928
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Completed NEPA Checklist A: 165. Complete NEPA checklist and coordinate completion of cultural resource surveys 02/28/2007 03/13/2007
Completed Environmental Land Audit B: 172. Coordinate completion of hazardous waste surveys 02/28/2007 03/13/2007
Property Acquisition Information C: 172. Pursue site information, title search and conservation easements 02/28/2007 03/13/2007
Identified Sellers of Lands D: 172. Identify willing landowner participants 02/28/2007 03/13/2007
Albeni Falls Work Group Coordination E: 118. Coordinate the Albeni Falls Interagency Work Group 02/28/2007 03/13/2007
Coordination with County Commisioners F: 118. Meet with County Commissioners 02/28/2007 03/13/2007
Inform and Involve More Entities in the Mitigation Efforts G: 118. Build relationships with entities interested in wildlife mitigation 02/28/2007 03/13/2007
Completed project work identified in the Wildlife Management Plan H: 118. Coordinate enhancement, O&M activities defined in site-specific Wildlife Mgmt. Plan 02/28/2007 03/13/2007
Identified Sellers of Lands and Restoration Project Proposals I: 118. Coordinate Albeni Falls Wildlife Mitigation activity w/ongoing Avista Power mitigation 02/28/2007 03/13/2007
Regional Wildlife Meeting Attendance J: 118. Coordinate/develop Albeni Falls Wildlife Mitigation Project presentations to the Wildlife Caucus 02/28/2007 03/13/2007
Cost Share Partners Identified K: 114. Identify cost-share partnerships and projects 02/28/2007 03/13/2007
Project Management L: 119. Develop/maintain IDFG budgets, manage/maintain contracts & inventory records & IDFG spending auth. 02/28/2007 03/13/2007
Education and Outreach for Area Students M: 99. Coordinate/implement info education prog for/Albeni Falls Wildlife Mitigation Project 02/28/2007 03/13/2007
Completed HEP Reports for Mitigation Properties N: 87. Coordinate and conduct baseline and 5-year HEP surveys 02/28/2007 03/13/2007
Completed Wildlife Management Plans O: 174. Develop site-specific wildlife management plans 02/28/2007 03/13/2007
Monitoring and Annual Reports P: 157. Coordinate and conduct vegetative monitoring surveys & coordinate widlife surveys 02/28/2007 03/13/2007
Completed Annual Report Q: 132. Submit FY05 report to BPA describing progress on mitigation lands 04/07/2006 06/22/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete NEPA checklist and coordinate completion of cultural resource surveys
B 172 Coordinate completion of hazardous waste surveys
C 172 Pursue site information, title search and conservation easements
D 172 Identify willing landowner participants
E 118 Coordinate the Albeni Falls Interagency Work Group
F 118 Meet with County Commissioners
G 118 Build relationships with entities interested in wildlife mitigation
H 118 Coordinate enhancement, O&M activities defined in site-specific Wildlife Mgmt. Plan
I 118 Coordinate Albeni Falls Wildlife Mitigation activity w/ongoing Avista Power mitigation
J 118 Coordinate/develop Albeni Falls Wildlife Mitigation Project presentations to the Wildlife Caucus
K 114 Identify cost-share partnerships and projects
L 119 Develop/maintain IDFG budgets, manage/maintain contracts & inventory records & IDFG spending auth.
M 99 Coordinate/implement info education prog for/Albeni Falls Wildlife Mitigation Project
N 87 Coordinate and conduct baseline and 5-year HEP surveys
O 174 Develop site-specific wildlife management plans
P 157 Coordinate and conduct vegetative monitoring surveys & coordinate widlife surveys
Q 132 Submit FY05 report to BPA describing progress on mitigation lands
R 185 Project Status Reporting