| Province | Subbasin | % |
|---|---|---|
| Intermountain | Pend Oreille | 100.00% |
| Previous: | Next: |
|---|---|
| n/a |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Ensure environmental compliance requirements are complete | A: 165. Obtain necessary permits for fish collection and animal handling | 05/01/2007 | 05/01/2007 | |
| Install radio tracking receiver ground stations | B: 70. Procure, install and test stationary radio receiver stations | 11/30/2007 | 10/05/2007 | |
| bull trout released | C: 28. Transport bull trout above Albeni Falls Dam | 11/10/2007 | 11/10/2007 | |
| Transmitter implantation will be accomplished by PNNL and EWU. | D: 158. Implant combination radio acoustic transmitter (CART) into bull trout | 11/10/2007 | 11/10/2007 | |
| Weekly electrofishing surveys | E: 157. Weekly electrofishing | 11/15/2007 | 11/15/2007 | |
| All fixed receiver stations will be inspected and downloaded every other wk (26 times per yr) | F: 157. Download stationary ground radio receiving station | 12/01/2007 | 11/21/2007 | |
| Track movement of tagged bull trout | G: 157. Mobile tracking surveys by fixed wing aircraft, vehicle and boat | 12/01/2007 | 12/01/2007 | |
| Develop a profile of each fish tracked | H: 162. Data reduction and analysis | 01/10/2008 | 12/20/2007 | |
| Funding Package - Submit draft to COTR | I: 119. Manage Project | 04/30/2008 | 04/30/2008 | |
| Final report uploaded to the BPA website | J: 132. Submit Annual Report for the period May 2007 to December 2008 | 04/28/2008 | 03/24/2008 | |
| Testing of radio receivers | L: 70. Calibrate stationary receiver stations prior to spring fieldwork | 04/30/2008 | 04/09/2008 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Obtain necessary permits for fish collection and animal handling | 02/09/2007 | ||||||
| B | 70 | Procure, install and test stationary radio receiver stations | 04/17/2007 | ||||||
| C | 28 | Transport bull trout above Albeni Falls Dam | 04/17/2007 | ||||||
| D | 158 | Implant combination radio acoustic transmitter (CART) into bull trout | 04/17/2007 | ||||||
| E | 157 | Weekly electrofishing | 04/17/2007 | ||||||
| F | 157 | Download stationary ground radio receiving station | 04/17/2007 | ||||||
| G | 157 | Mobile tracking surveys by fixed wing aircraft, vehicle and boat | 04/17/2007 | ||||||
| H | 162 | Data reduction and analysis | 02/09/2007 | ||||||
| I | 119 | Manage Project | 02/09/2007 | ||||||
| J | 132 | Submit Annual Report for the period May 2007 to December 2008 | 02/09/2007 | ||||||
| K | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
| L | 70 | Calibrate stationary receiver stations prior to spring fieldwork | 12/21/2007 |