SOW Report
Contract 27934: 1990-044-00 EXP COEUR D' ALENE TRIBE FISHERIES HABITAT IMPROVE
Project Number:
Title:
Coeur D'Alene Reservation Fisheries Habitat
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Coeur D'Alene 100.00%
Contract Number:
27934
Contract Title:
1990-044-00 EXP COEUR D' ALENE TRIBE FISHERIES HABITAT IMPROVE
Contract Continuation:
Previous: Next:
10885: 1990-044-00 FISHERIES HABITAT EVALUATION IN TRIBUTARIES
  • 33533: 1990-044-00 EXP COEUR D'ALENE RESERVATION FISHERIES ENHANCE
Contract Status:
Closed
Contract Description:
Contract Description:

The scope of work and budget presented in this document describe the activities associated with the Coeur d'Alene Tribe's resident fish enhancement project for the Coeur d'Alene Subbasin corresponding to the contract period June 1, 2006 to May 31, 2007.  The objectives, tasks, deliverables and budget format found in previous submittals for this project have been converted to reflect the work element, milestone and budgeting format consistent with BPA's Process Improvement Initiative.

The Work Elements for this project fall under the following general Objectives:

Objective 1 - Planning and Coordination
WE A: NEPA Analysis and Documentation
WE B: Coordinate Restoration Efforts with Stakeholders
WE C: Identify and Select New Restoration Projects
WE D: Collect Preliminary Design Data for New Projects

Objective 2 - Construction and Implementation
WE E: Install Culvert on N. Fork Alder Creek
WE F: Benewah Creek Channel Construction
WE G: Replant Disturbed Areas in Benewah Creek
WE H: Enhance Floodplain Plant Communities
WE I: Maintain Instream Structures at Treatment Sites
WE J: Conduct O&M Activities at WF Lake Creek

Objective 3 - Research and Monitoring
Brook Trout Control
WE K: Remove Brook Trout from Benewah Creek
WE L: Analyze Data from Brook Trout Removal from Benewah Creek
Biological Monitoring
WE M: Install and Maintain Migration Traps - Lake and Benewah Creeks
WE N: Trap Adfluvial Westslope Cutthroat Trout - Lake and Benewah Creeks
WE O: Install PIT tag antenna system in Benewah Creek
WE P: PIT Tag Juvenile Adfluvial Westslope Cutthroat Trout - Lake and Benewah Creeks
WE Q: Sample Salmonids in Target Watersheds for Population Estimation
WE R: Biological Data Management
WE S: Analyze Data Generated from Salmonid Trapping and PIT Tagging
WE T: Analyze Data Generated from Salmonid Sampling
Physical Habitat/Water Quality Monitoring
WE U: Measure Physical Habitat in Reference and Treatment Reaches
WE V: Measure Water and Air Temperature in Target Watersheds
WE W: Measure Summer and Winter Thermal Heterogeneity
WE X: Physical Data Management
WE Y: Analyze Data from Physical Habitat Sampling and Temperature Monitoring

Objective 4 - Project Administration
WE Z: Provide Education and Outreach Opportunities
WE AA: Manage and Administer Project
WE AB: Produce Quarterly Reports via Pisces
WE AC: Produce Annual Report

Objective 5 - Provide Compensatory Harvest Opportunities
WE AD: Conduct O&M for Put and Take Fisheries
WE AE: Implement M&E for Put and Take Fisheries

The total work element budget being submitted with this scope of work is $1,255,613 and is consistent with NPPC funding recommendations.  This contract request includes two work elements (WE AD and WE AE) and a total of $58,079, which are tied to Put and Take Fisheries as approved by the NPCC at the March 14, 2006 Fish Committee meeting as a 2006 within-year budget request.
Account Type(s):
Expense
Contract Start Date:
06/01/2006
Contract End Date:
05/31/2007
Current Contract Value:
$1,239,377
Expenditures:
$1,239,377

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Terry Holtcamp Jr Bonneville Power Administration Yes Contracting Officer taholtcamp@bpa.gov (503) 230-3518
Carl Keller Bonneville Power Administration No Env. Compliance Lead cjkeller@bpa.gov (503) 230-7692
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Carla Marratt Coeur D'Alene Tribe No Administrative Contact cmarratt@cdatribe-nsn.gov (208) 686-6803
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
NEPA Checklist A: 165. Complete NEPA Analysis and Documentation 10/14/2006 09/21/2006
Summary of Activites B: 118. EXPIRED: Coordinate Restoration Efforts with Stakeholders 05/30/2007 05/30/2007
Project Descriptions/Agreements C: 114. Identify and Select New Restoration Projects 05/31/2007 05/31/2007
Complete Preliminary Dataset D: 175. Collect Preliminary Design Data For New Projects 05/31/2007 05/31/2007
Install New Culvert E: 184. Install Culvert on N. Fork Alder Creek 09/30/2006 09/21/2006
Complete Channel Construction F: 30. Benewah Creek Channel construction 10/30/2006 10/31/2006
Vegetate Disturbed Areas G: 47. Plant Disturbed Areas in Benewah Creek 05/30/2007 05/25/2007
Plant 10,000 Conifers H: 47. Enhance Floodplain Plant Communities 05/30/2007 05/18/2007
Modify/Replace LWD Structures I: 186. Maintain Instream Structures at Treatment Sites 10/31/2006 10/11/2006
Complete Herbicide Treatments and Replant J: 22. Conduct O&M Activities at WF Lake Creek 05/31/2007 05/31/2007
Remove Brook Trout from Benewah Creek K: 166. EXPIRED: Remove Brook Trout from Benewah Creek 09/06/2006 09/21/2006
Analyze Data from Brook Trout Removal L: 162. Analyze Data from Brook Trout Removal from Benewah Creek 01/01/2007 02/28/2007
Install Migration Traps in Lake and Benewah Creeks M: 70. Install and Maintain Migration Traps Lake and Benewah Creeks 05/31/2007 05/31/2007
Monitor Movements of Adfluvial WCT in Lake and Benewah Creeks N: 157. Trap Juvenile and Adult Adfluvial Westslope Cutthroat Trout in Lake and Benewah Creeks 05/31/2007 05/31/2007
Operational PIT Tag System O: 70. Install PIT tag antenna system in Benewah Creek 05/31/2007 05/18/2007
PIT Tag Juvenile Cutthroat in Lake and Benewah Creeks P: 158. PIT Tag Juvenile Adfluvial Westslope CutthroatTrout in Lake Creek and Benewah Creek 05/31/2007 05/31/2007
Population Estimates of Salmonids in Target Watersheds Q: 157. Sample Salmonids in Target Watersheds for Population Estimation 10/31/2006 11/10/2006
Complete Database of Biological Parameters for Target Watersheds R: 160. Biological Data Management 05/31/2007 05/31/2007
Completed Analysis from Trapping and PIT Tagging in Lake and Benewah Creeks. S: 162. Analyze Data Generated from Salmonid Trapping and PIT Tagging in Lake and Benewah Creeks 02/01/2007 03/23/2007
Population and Production Estimates for Target Watersheds T: 162. Analyze Data Generated from Salmonid Sampling in Target Watersheds 12/01/2006 12/22/2006
Completed Inventories U: 157. Measure Physical Habitat in Reference and Treatment Reaches in Target Watersheds 10/31/2006 10/20/2006
Measured Water and Air Temperature V: 157. Measure Water and Air Temperature in Lake, Benewah, and Evans Creek Watersheds 05/31/2007 05/31/2007
Measurement of Thermal Heterogeneity in Benewah Creek W: 156. Measure Summer and Winter Thermal Heterogeneity in Benewah Creek 02/28/2007 03/15/2007
Complete Database of Physical Habitat and Temperature Attributes X: 160. Physical Data Management 05/31/2007 05/31/2007
Analyses of Physical Habitat and Temperature Data Y: 162. Analyze Data from Physical Habitat Sampling and Temperature Monitoring in Target Watersheds 02/01/2007 03/23/2007
Complete Record of Education/Outreach Activities Z: 99. Provide Education and Outreach Opportunities 05/31/2007 05/31/2007
Accrual Estimates/FY07 SOW/Metrics Reports AA: 119. Manage and Administer Project 05/31/2007 05/31/2007
Completed FY05 and Draft FY06 Annual Reports AC: 132. Produce Annual Report 05/31/2007
Stock and maintain pond sites AD: 187. Conduct O&M for Put and Take Fisheries 11/30/2006 11/30/2006
Monitor site conditions AE: 157. Implement M&E for Put and Take Fisheries 11/30/2006 11/30/2006

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 47 Plant Vegetation
  • 1 instance of WE 187 Put and Take Fisheries
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 166 Remove or Relocate Predaceous Animals
  • 2 instances of WE 70 Install Fish Monitoring Equipment
  • 5 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 4 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete NEPA Analysis and Documentation
B 118 EXPIRED: Coordinate Restoration Efforts with Stakeholders
C 114 Identify and Select New Restoration Projects
D 175 Collect Preliminary Design Data For New Projects
E 184 Install Culvert on N. Fork Alder Creek
F 30 Benewah Creek Channel construction
G 47 Plant Disturbed Areas in Benewah Creek
H 47 Enhance Floodplain Plant Communities
I 186 Maintain Instream Structures at Treatment Sites
J 22 Conduct O&M Activities at WF Lake Creek
K 166 EXPIRED: Remove Brook Trout from Benewah Creek
L 162 Analyze Data from Brook Trout Removal from Benewah Creek
M 70 Install and Maintain Migration Traps Lake and Benewah Creeks
N 157 Trap Juvenile and Adult Adfluvial Westslope Cutthroat Trout in Lake and Benewah Creeks
O 70 Install PIT tag antenna system in Benewah Creek
P 158 PIT Tag Juvenile Adfluvial Westslope CutthroatTrout in Lake Creek and Benewah Creek
Q 157 Sample Salmonids in Target Watersheds for Population Estimation
R 160 Biological Data Management
S 162 Analyze Data Generated from Salmonid Trapping and PIT Tagging in Lake and Benewah Creeks
T 162 Analyze Data Generated from Salmonid Sampling in Target Watersheds
U 157 Measure Physical Habitat in Reference and Treatment Reaches in Target Watersheds
V 157 Measure Water and Air Temperature in Lake, Benewah, and Evans Creek Watersheds
W 156 Measure Summer and Winter Thermal Heterogeneity in Benewah Creek
X 160 Physical Data Management
Y 162 Analyze Data from Physical Habitat Sampling and Temperature Monitoring in Target Watersheds
Z 99 Provide Education and Outreach Opportunities
AA 119 Manage and Administer Project
AB 185 Periodic Status Reports for BPA
AC 132 Produce Annual Report
AD 187 Conduct O&M for Put and Take Fisheries
AE 157 Implement M&E for Put and Take Fisheries