| Province | Subbasin | % |
|---|---|---|
| Columbia River Estuary | Columbia Estuary | 50.00% |
| Lower Columbia | Columbia Lower | 50.00% |
| Previous: | Next: |
|---|---|
| 24482: 200300700 EXP LOWER COLUMBIA RIVER/ESTUARY ECOSYSTEM MONITORING |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Full Name | Organization | Write Permission | Contact Role | Work Phone | |
|---|---|---|---|---|---|
| Michele Beeman | US Geological Survey (USGS) | No | Administrative Contact | mbeeman@usgs.gov | (509) 538-2299x263 |
| Tim Counihan | US Geological Survey (USGS) | Yes | Contract Manager | tim_counihan@usgs.gov | (509) 538-2299x281 |
| Jamae Hilliard | Bonneville Power Administration | Yes | F&W Approver | jlhilliard@bpa.gov | (360) 418-8658 |
| Jill Leary | Lower Columbia Estuary Partnership | Yes | Technical Contact | leary@lcrep.org | (503) 226-1565x235 |
| Debrah Marriott | Lower Columbia Estuary Partnership | No | Supervisor | marriott.debrah@lcrep.org | (503) 226-1565 |
| Khanida Mote | Bonneville Power Administration | Yes | Contracting Officer | kpmote@bpa.gov | (503) 230-4599 |
| Tracey Yerxa | Bonneville Power Administration | Yes | COR | tyerxa@bpa.gov | (503) 230-4738 |
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Funding Package - Submit draft to COTR | A: 119. Routine contract tasks | 06/30/2007 | 07/11/2007 | |
| Elevation database that includes LIDAR data. | B: 156. Incorporate LIDAR data into existing elevation dataset | 08/31/2007 | 08/31/2007 | |
| habitat classes and catena data layers | C: 156. Assist University of Washington with the delineation of habitat classes and catena | 10/30/2007 | ||
| Report of pilot probabilistic sampling design for selected metrics and one hydrogeomorphic reach | D: 156. Formulate pilot probabilistic sampling design. | 08/31/2007 | 10/30/2007 | |
| Final report development | E: 183. Final report development | 08/31/2007 | 10/30/2007 | |
| FY05 Annual report | G: 132. Final FY05 report to BPA | 09/29/2006 | 02/14/2007 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| All Anadromous Fish |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 119 | Routine contract tasks | 02/09/2007 | ||||||
| B | 156 | Incorporate LIDAR data into existing elevation dataset | 02/09/2007 | ||||||
| C | 156 | Assist University of Washington with the delineation of habitat classes and catena | 02/09/2007 | ||||||
| D | 156 | Formulate pilot probabilistic sampling design. | 02/09/2007 | ||||||
| E | 183 | Final report development | 02/09/2007 | ||||||
| F | 185 | Periodic Status Reports for BPA | 02/09/2007 | ||||||
| G | 132 | Final FY05 report to BPA | 02/09/2007 |