Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 30131: 2000-019-00 EXP TUCANNON SPRING CHINOOK CAPTIVE BROODSTOCK
Project Number:
Title:
Tucannon River Spring Chinook Captive Brood
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Plateau Tucannon 100.00%
Contract Number:
30131
Contract Title:
2000-019-00 EXP TUCANNON SPRING CHINOOK CAPTIVE BROODSTOCK
Contract Continuation:
Previous: Next:
24827: 2000-019-00 EXP TUCANNON R SPRING CHINOOK CAPTIVE BROOD
  • 35140: 2000-019-00 EXP TUCANNON SPRING CHINOOK CAPTIVE BROODSTOCK
Contract Status:
History
Contract Description:
Project Scope

The purpose of this project is to quickly rebuild the number of spring Chinook salmon that return to the Tucannon River.  If successful, this project will delay or prevent extinction of the Tucannon River spring Chinook salmon (listed as "Threatened" under the Endangered Species Act (ESA)).  The 2007 FY will be the eighth year of this project and will include some basic operation and monitoring costs for the captive broodstock program.

Project Location
  
The captive broodstock program will occur at three Washington Department of Fish and Wildlife (WDFW) locations (Lyons Ferry Hatchery (LFH), Tucannon Fish Hatchery (TFH), and Curl Lake Acclimation Pond (AP)).  LFH is located at rkm 95 on the Snake River between Lower Monumental and Little Goose Dams and is used for spawning and rearing of the captive broodstock.  Tucannon Fish Hatchery (rkm 58) and Curl Lake AP (rkm 66) are both located on the Tucannon River and are used for rearing and volitional release of captive broodstock progeny.  


Relationship to the Columbia River Fish and Wildlife Program

This proposed captive broodstock project is supported by various measures in the Northwest Power Planning Council's (Council) Fish and Wildlife Program.  Further, the project has been supported by the Columbia Basin Fish and Wildlife Authority (CBFWA) and the Independent Scientific Review Panel (ISRP) for funding, and has been agreed to by the co-managers and NOAA Fisheries.  The project will support the native run of Tucannon River spring Chinook salmon in its native habitat (2.2A), and will contribute to the rebuilding of the Snake River spring Chinook salmon run (4.1A). As stated under the Council's salmon and steelhead rebuilding principles (4.1A); 1) priority should be given to activities that aim to rebuild weak upriver populations, including populations listed under the ESA, 2) this project will be linked to habitat restoration activities (Tucannon River Model Watershed Program, State of Washington's Governor's Salmon Recovery), and 3) that while additional production facilities are not recommended by the Council, the current facilities (with slight additions/modifications) used for the hatchery supplementation program will be able to satisfy the needs of the fish and achieve the goals.  

Further, WDFW and the co-managers believe this to be an emergency case (7.4C, 7.4C.1), where unless intervention takes place quickly, the population may be beyond recovery.  While captive broodstock programs can be risky (genetic integrity, catastrophic facility failures, etc.), they also have the potential to rapidly increase adult fish numbers back to a particular location.  Implementation of a captive broodstock program may be the most effective means of accelerating recovery of this depleted stock, and if held in captivity for no more than a single generation, as clearly stated in the Tucannon River Master Plan, genetic integrity and adaptability should be preserved (7.4D).  


Coordination

This project will be performed in coordination with the Nez Perce Tribe (NPT), the Confederated Tribes of the Umatilla Indian Reservation (CTUIR), the Lower Snake River Compensation Plan (LSRCP) under the U.S. Fish and Wildlife Service (USFWS), and NOAA Fisheries.  The USFWS provided early support by funding the operation costs, planning, and some capital construction between 1998 and summer of 2000.  NOAA Fisheries has given their approval of the project under the ESA Section 10 permitting process (Permit #1129, issued 25 July, 2000).  

WDFW, NPT, and CTUIR will participate in coordination meetings (as referenced in the Tucannon Master Plan) to make the best possible decision to maximize the program benefits.  The co-managers have agreed to meet once a year to discuss program progress, and will meet more frequently should issues arise in the program that need all manager agreement.  This may be especially true as the program continues to expand (i.e., more fish on hand at the hatchery).  Both NPT and CTUIR are kept up to date of the progress of the program though Section 10 Monthly reports provided to NOAA Fisheries, and during Lyons Ferry Hatchery Complex AOP meetings.

NOAA Fisheries, USFWS, and Bonneville Power Administration (BPA) will be informed of the program's progress through annual reports and presentations during the year at various scientific forums/discussions.  NOAA Fisheries will also continue to receive a monthly update on the program though Section 10 Permit reporting.  

WDFW will act as the lead agency in compiling and widely distributing the results and reports throughout the Columbia and Snake River basins to all interested parties.

Project Goals

The goal of this captive broodstock program is for the short-term; preservation and rebuilding of this critically depressed run of ESA listed spring Chinook salmon in the Tucannon River.  In a broader context, this program will (in the short term) assist in increasing the total number of spring Chinook that return to the Snake River Basin, and help preserve a genetically and geographically distinct population of spring Chinook within the river.  

The specific goal of this captive broodstock program is to rear spring Chinook salmon juveniles to adults.  The project will then spawn these captive adults, rear their progeny, and release up to 150,000 progeny smolts into the Tucannon River with an estimated adult return of 300 fish per brood year.  Excess fish produced from the program, should their survival be greater than expected, may be released as parr as allowed under Section 10 Permit #1129.  The 150,000 smolt release, in combination with the current hatchery supplementation program, is expected to produce 500-600 returning adult spring Chinook to the Tucannon River from return years 2005-2010.  In order to accomplish this production goal, WDFW will need to complete the following during FY 2007:

1) Progeny from the 2005 spawning will be released in the Tucannon River in the spring of 2007.  Progeny from the 2006 spawning will be released in 2008.  Spawn mature spring Chinook adult salmon (for FY 2007 this will consist of 2001-2002 brood year fish); rear resultant progeny at LFH, and release the progeny at the smolt stage from Curl Lake AP during March/April 2008.

2) Continue to monitor survival of captive fish at the LFH to make sure the program is achieving it's goals, and monitor the smolt out-migration (through PIT tagging and smolt trapping), adult returns (through redd surveys and adult trapping), and natural progeny produced (DNA analysis) to evaluate the overall success of the program.

Current Project Status

WDFW currently has two brood years (2001-2002 adults) on hand at LFH.  These are the final brood years of the program and will be spawned in October, 2006.  

Eggs collected to date from Captive Brood spawners are as follows:
2000 BY - 15,000 eggs.  Poor survival with 3,000 smolts released in 2002.
2001 BY - 250,000 eggs. 20,592 parr released in 2002 and 146,922 smolts released in 2003.
2002 BY - 176,000 eggs.  Mortality to eye-up was 68% leaving 55,711 live eggs.  44,784                            
                 smolts released in 2004.  Conducted adult outplants (97 adults outplanted - 21 BY98;  
                 76 BY99).                                                      
2003 BY -  309,416 eggs.  Mortality to eye-up was 40%.  130,064 smolts released in 2005.
2004 BY - 310,819 eggs.  Mortality to eye-up was 49%.   132,312 smolts released in 2006.                    
2005 BY -  210,296 eggs.  Mortality to eye-up was 66%.  As of May 1, 2006 we had 92,611 fish on hand.                                                          

TUCANNON RIVER SPRING CHINOOK CAPTIVE BROODSTOCK PROGRAM
BPA FY2007 PROJECT Number 2000-019-00 - Objectives and Tasks

Objective 1: Rear and spawn captive broodstock fish at LFH.

Task 1a.  Conduct daily rearing of the 2001-2002 brood captive broodstock fish (daily
               feeding, pond cleaning, routine disease sampling and analysis, basic hatchery
               record keeping for feed fed, mortalities, water inflow, etc.) through October 2006.


Objective 2: Mark any progeny produced from the 2006-spawning season.

Task 2a.  Mark all captive brood progeny by September 2007 prior to transfer of fish to
               Tucannon Fish Hatchery in October, 2007.  All captive brood progeny will be
               tagged with CWT in the snout, with no external marks.  This will allow for easy
               separation between supplementation fish (CWT and elastomer mark) when they
               return as adults.  A subsample of the captive broodstock progeny will be PIT
               tagged to monitor outmigration survival.

Objective 3: Establish baseline data of parents to track family and pedigree of returning adults through genetic sampling and analysis.

Task 3a.  Consolidate all DNA fin clip or opercle punch samples for the 2006 Tucannon
               River spring Chinook adults, and any captive brood fish they were spawned and
               produced progeny in 2006.  Consolidate all other data records (i.e., length, age,
               sex, etc…) associated with DNA samples.

Task 3b.  Send all DNA samples (2006 brood year) to the WDFW Genetics Lab
               for microsatellite DNA analysis.  DNA samples will provide the baseline stock profile, and will
               allow tracking of "families" in coming generations.  Effects to the overall
               population (wild origin, hatchery supplementation origin, and captive brood
               origin) will also be monitored.  


Objective 4.  Monitor and evaluate captive brood parents and progeny.

Task 4a.  Monitor and document survival, mortality, and maturity rates of captive
               broodstock through monthly record keeping.

Task 4b.  Monitor and document fecundity, egg size and mortality to the eyed-egg stage of
               spawn collected from captive broodstock.                                                                                                                                              
    
  Ho:  Fecundity, egg size and mortality to the eyed-egg stage of
  supplementation females is the same as that of captive brood females of the same      
  age.

  Task:  Statistical comparisons will be made using analysis of variance to
  determine differences at the 95% significance level.

Task 4c.  Monitor outmigration survival of captive brood progeny and supplementation fish
               through PIT tagging.                                                                                                                                                

  Task:  Randomly PIT tag 1,000 captive brood fish each year.  PIT tagging for        
  supplementation fish is funded through LSRCP.  Survival comparisons between
  captive and supplementation fish will be described on a yearly basis.

Objective 5.  Compile and disseminate captive broodstock program results.

Task 5a.  Monthly and annually compile and distribute written data summaries or reports
               and complete a final written report for distribution.

Task 5b.  Participate in planning activities under the Lyons Ferry Hatchery Complex
               Annual Operations Plan (AOP).
Account Type(s):
Expense
Contract Start Date:
10/01/2006
Contract End Date:
09/30/2007
Current Contract Value:
$118,492
Expenditures:
$118,492

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All documents submitted. A: 165. Maintain Environmental Compliance for this ESA Listed species 09/30/2007 09/30/2007
Any major maintenance failures reported to COTR ASAP. B: 61. Maintain Hatchery Components 09/30/2007 09/30/2007
All databases updated. C: 157. Collect Survival, Fecundity, and DNA Data. 09/30/2007 09/30/2007
Captive adults for final spawning. D: 176. Produce Adults - Tucannon River Captive Chinook - Adult Captive Brood 10/31/2006 10/03/2006
Release BY2005 smolts. E: 176. Produce BY2005 Smolts - Tucannon River Captive Chinook Progeny 05/31/2007 04/23/2007
Produce BY2006 parr. F: 176. Produce BY2006 Parr - Tucannon River Captive Chinook Progeny 09/30/2007 09/30/2007
Fish health personnel to monitor health and report findings to project leader. G: 60. Routine Disease Sampling and Analysis 09/30/2007 09/30/2007
BY2005 1,000 PIT tagged smolts/ BY2006 100% marked CWT H: 158. Mark Captive Brood Progeny 09/30/2007 02/05/2007
Annual report uploaded to BPA website. I: 132. Tucannon River Captive Broodstock Annual Report 07/20/2007 07/26/2007
Accurate DNA archive. J: 160. Consolidate DNA Data 01/31/2007 12/13/2006
Monthly reports to NOAA and co-managers. K: 189. Coordination with Other Agencies 09/30/2007 09/30/2007
Analysis complete for inclusion in annual report. L: 162. Data Analysis 05/31/2007 05/31/2007
AOP produced. M: 174. AOP 09/30/2007 12/15/2006
Confirm continued environmental compliance with BPA. N: 2. Work with BPA personnel 09/30/2007 09/23/2007
Funding Package - Submit draft to COTR O: 119. Manage Project 09/30/2007 09/30/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 3 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Maintain Environmental Compliance for this ESA Listed species 02/09/2007
B 61 Maintain Hatchery Components 03/12/2007
C 157 Collect Survival, Fecundity, and DNA Data. 03/12/2007
D 176 Produce Adults - Tucannon River Captive Chinook - Adult Captive Brood 03/12/2007
E 176 Produce BY2005 Smolts - Tucannon River Captive Chinook Progeny 03/12/2007
F 176 Produce BY2006 Parr - Tucannon River Captive Chinook Progeny 03/12/2007
G 60 Routine Disease Sampling and Analysis 03/12/2007
H 158 Mark Captive Brood Progeny 03/12/2007
I 132 Tucannon River Captive Broodstock Annual Report 02/09/2007
J 160 Consolidate DNA Data 02/09/2007
K 189 Coordination with Other Agencies 02/09/2007
L 162 Data Analysis 02/09/2007
M 174 AOP 02/09/2007
N 2 Work with BPA personnel
O 119 Manage Project 02/09/2007
P 185 Periodic Status Reports for BPA 02/09/2007