Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 30303: 2006-003-00 PL DESERT WILDLIFE AREA O&M
Project Number:
Title:
Desert Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Crab 100.00%
Contract Number:
30303
Contract Title:
2006-003-00 PL DESERT WILDLIFE AREA O&M
Contract Continuation:
Previous: Next:
25457: 2006-003-00 PL DESERT WILDLIFE AREA O&M
  • 34927: 2006-003-00 PL DESERT WILDLIFE AREA O&M
Contract Status:
Closed
Contract Description:
Complete two wetland enhancement projects on the Desert Wildlife Area that have been funded, in part, by BPA.  In addition to completing enhancement modifications, the contract will provide funding to operate and maintain the enhanced wetlands for one year to insure that they remain functional.  The TD-1 project, if completed, operated, and maintained will restore 7 former wetland basins (now dry or drying) by diverting surface water from the Frenchman Hills wasteway into the former wetland basins.  Enhancement at the TD-1 project will include designing and installing a fish screen, excavating cell #2, armoring dikes, seeding disturbed soil resulting from construction activities, and tilling wetland cells.  Operation and maintenance at TD-1 will include coordination with BOR and Quincy Irrigation District, inspecting/reparing enhancements, controlling undesirable vegetation, operating water control structures, producing required BPA reports, and administering the contract.  The TD-2 project, if completed and maintained, will enhance 19 late-succession stage wetlands adjacent to the Winchester Wasteway by removing accumulated organic material from them and eliminating surface water connection to the wasteway which will allow management of fish populations in the project ponds/wetlands.  Enhancement at the TD-2 project will include armoring dikes, removing fish from project ponds, and seeding disturbed soil resulting from construction activities.   Operation and maintenance at TD-2 will include inspecting/reparing enhancements, controlling undesirable vegetation,  developing and implementing methods to survey submerged aquatic vegetation, producing required BPA reports, and administering the contract.  Management of the project wetlands will be used to maximize habitat quality for wetland obligate birds.
Account Type(s):
Expense
Contract Start Date:
12/01/2006
Contract End Date:
09/30/2007
Current Contract Value:
$166,281
Expenditures:
$166,281

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance A: 165. Environmental Compliance 09/30/2007 09/30/2007
Water Use Documentation B: 181. Coordinate with BOR and Quincy Irrigation District 09/30/2007 09/30/2007
Design specifications for fish screen. C: 175. Design fish screen 08/15/2007
Installed fish screen. D: 69. Install fish screen at TD-1 06/15/2007
Excavation of cell#2 at TD-1 site. E: 181. Excavate Cell #2 at TD-1 09/30/2007 09/30/2007
Armor dikes at the TD-1 site. F: 55. Armor dikes at TD-1 site. 03/15/2007 03/15/2007
Armor dikes at the TD-2 site. G: 55. Armor dikes at TD-2 site. 03/15/2007 03/15/2007
Fish-free ponds. H: 181. Remove fish from project ponds. 09/30/2007
Seed disturbed soil at TD-1. I: 55. Seed disturbed soil at TD-1 site. 03/15/2007 03/15/2007
Seed disturbed soil at TD-2. J: 55. Seed disturbed soil at TD-2 site. 03/15/2007 03/15/2007
TD-1 cells tilled K: 47. Till cells at TD-1 04/30/2007 03/30/2007
Control of undesirable/invasive vegetation. L: 53. Control undesirable vegetation at TD-1 09/30/2007 09/30/2007
Control of undesirable/invasive vegetation. M: 53. Control undesirable vegetation at TD-2 09/30/2007 09/30/2007
Functional physical features. N: 181. Inspect/repair physical enhancements at TD-1 09/30/2007 09/30/2007
Functional physical features. O: 181. Inspect/repair dikes at TD-2. 09/30/2007 09/05/2007
Develop M & E methods P: 156. Design M & E Methods for submerged aquatic vegetation (SAV) at TD- 2 08/01/2007 08/01/2007
M & E at TD-2 Q: 157. Monitor and Evaluate submerged aquatic vegetation at TD-2 09/30/2007 09/30/2007
Annual Report S: 132. Annual Report for BPA 09/30/2007
BPA required administrative duties T: 119. BPA Administrative requirements 09/30/2007 09/30/2007
Wildlife Area Administrative duties U: 119. WDFW Administrative Requirements 09/30/2007 09/30/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 53 Remove Vegetation
  • 4 instances of WE 55 Erosion and Sedimentation Control
  • 5 instances of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 69 Install Fish Screen
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 02/09/2007
B 181 Coordinate with BOR and Quincy Irrigation District 02/09/2007
C 175 Design fish screen 02/09/2007
D 69 Install fish screen at TD-1 02/26/2007
E 181 Excavate Cell #2 at TD-1 02/26/2007
F 55 Armor dikes at TD-1 site. 02/26/2007
G 55 Armor dikes at TD-2 site. 02/26/2007
H 181 Remove fish from project ponds. 02/09/2007
I 55 Seed disturbed soil at TD-1 site. 02/26/2007
J 55 Seed disturbed soil at TD-2 site. 02/26/2007
K 47 Till cells at TD-1 02/26/2007
L 53 Control undesirable vegetation at TD-1 02/26/2007
M 53 Control undesirable vegetation at TD-2 02/26/2007
N 181 Inspect/repair physical enhancements at TD-1 02/26/2007
O 181 Inspect/repair dikes at TD-2. 02/26/2007
P 156 Design M & E Methods for submerged aquatic vegetation (SAV) at TD- 2 02/09/2007
Q 157 Monitor and Evaluate submerged aquatic vegetation at TD-2 02/09/2007
R 185 Quarterly Status Reports for BPA 02/09/2007
S 132 Annual Report for BPA 02/09/2007
T 119 BPA Administrative requirements 02/09/2007
U 119 WDFW Administrative Requirements 02/09/2007