Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 31395: 1992-061-00 KALISPEL TRIBE ALBENI FALLS WMA'S IMP. & O&M
Project Number:
Title:
Albeni Falls Wildlife Mitigation Capital Land Acquisitions
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
31395
Contract Title:
1992-061-00 KALISPEL TRIBE ALBENI FALLS WMA'S IMP. & O&M
Contract Continuation:
Previous: Next:
26359: 1992-061-00 KALISPEL TRIBE ALBENI FALLS WMA'S IMP. & O&M
  • 37322: 1992-061-02 EXP KALISPEL TRIBE ALBENI FALLS
Contract Status:
History
Contract Description:
The Idaho Department of Fish and Game formed the Albeni Falls Interagency Work Group in 1985 for the purpose of determining wildlife impacts associated with the construction of the Albeni Falls hydroelectric project. Work Group members include the IDFG, the Kalispel Tribe, the Coeur D'Alene Tribe, the Kootenai Tribe of Idaho and the U.S. Army Corps of Engineers. Once the loss assessments were completed, the group worked collectively to protect, enhance and partially mitigate wildlife impacts in the Pend Oreille Subbasin. The construction of Albeni Falls Dam resulted in the loss of over 28,000 Habitat Units in wetland and riparian habitat types. These losses occurred exclusively within the Kalispel Ceded Lands. Through the acquisition of property rights (fee title to management agreements), property protection and habitat restoration, the Kalispel Tribe is continuing to mitigate for these losses. This contract provides for the enhancement, O&M and RM&E for the all properties managed by the Kalispel Tribe in this mitigation project, including the Flying Goose Project which had previously been a stand alone project.
The properties acquired to date by the Kalispel Tribe fall into two general categories. Those that are conservation type with limited enhancement work necessary (Beaver Lake, Gamlin Lake and West Branch Priest River) and those that have high potential habitat value but require active enhancement activities to realize their potential (Both Tacoma Creek properties and the 3 Trimble Creek acquisitions). Active enhancement work for this contract period will take place in the Tacoma/Trimble Management Area. This Management Area is 5 miles north of Cusick Washington along Highway 20 in Township 34 North, Range 43 East, Section 36 and Township 33 North, Range 43 East, sections 1,2,11 and12. Management activities include hydraulic restoration, wetland enhancement and vegetation restoration.
Along with active enhancement activities, this contract will provide for the data collection to provide scientific support for the continuance of these types of enhancement activities on additional properties as they become part of the project. This contract will also cover the maintenance of existing habitat value and previously installed structures.
Account Type(s):
Expense
Contract Start Date:
03/01/2007
Contract End Date:
02/29/2008
Current Contract Value:
$682,933
Expenditures:
$612,583

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Ray Entz Kalispel Tribe Yes Supervisor rentz@knrd.org (509) 445-1147
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Neil Lockwood Kalispel Tribe Yes Technical Contact nlockwood@knrd.org (509) 445-1147x1274
Rachel Rounds Bonneville Power Administration No Env. Compliance Lead rarounds@bpa.gov (503) 230-3967
Stacey Stovall Kalispel Tribe Yes Technical Contact sstovall@knrd.org (509) 445-1147
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Completed documentation of environmental compliance to BPA A: 165. Complete Permit Applications and Provide Documentation to Obtain Compliance. 02/29/2008 02/29/2008
Completed hazardous waste surveys B: 172. Complete hazardous waste assessments as a part of the pre-acquisition process. 02/29/2008 02/29/2008
Completed cultural resource surveys C: 172. Complete cultural resource surveys. 02/29/2008 02/29/2008
Completed land surveys D: 172. Complete surveys for properties where boundaries are in question. 02/29/2008 02/29/2008
Completed Property Appraisals E: 172. Conduct appraisals for prospective acquisitions 02/29/2008 02/29/2008
Completed title search F: 172. Conduct title search as part of pre-acquisition process. 02/29/2008 02/29/2008
Legal Descriptions G: 172. Obtain Legal Description of Acquisitions. 02/29/2008 02/29/2008
HU report to BPA H: 172. Identify Minimum HUs From Land Purchase 02/29/2008 02/29/2008
Completed Acquisition and Easement Agreements I: 189. Land Owner Coordination 02/29/2008 02/29/2008
Closing J: 5. Acquire fee title lands. 02/29/2008
Completed Designs for Construction/Implementation K: 122. Review Designs and Details for Habitat Enhancements. 02/29/2008 02/29/2008
Completed Operations, Maintenance and Enhancement plans for new acquisitions L: 174. Complete Management Plans for New Acquisitions in FY 06. 02/29/2008
Completed Field HEP M: 157. Complete Field HEP for New Acquisitions. 02/29/2008 02/29/2008
Complete field HEP. N: 157. Conduct 5 year HEP updates 02/29/2008 02/29/2008
Create 10 Wetland Ponds O: 181. Create Wetland Ponds on Tacoma/Trimble Management Area. 11/28/2007 02/29/2008
Control Over 12 Acres of Wetlands Flow P: 181. Install 2 Culvert Gate Valves in Tacoma/Trimble Management Area. 08/28/2007 02/29/2008
Bank stabilization through LWD placement Q: 29. Add LWD to Shoreline Stabilization on Tacoma/Trimble Management area 11/28/2007 02/29/2008
Boundary Fence Installed R: 40. Install Boundary Fencing Along Tacoma/Trimble Management Area. 09/30/2007 02/29/2008
Tree Stand Thinning S: 53. Removal of Undesired Plant Species 11/28/2007 02/29/2008
Pend Oreille River Shoreline Stabilization Areas Seeded T: 47. Seed Shoreline Stabilization Site. 11/28/2007 02/29/2008
Wetland Shorelines Seeded U: 47. Seed Newly Created Wetland Pond Shorelines. 11/16/2007 02/29/2008
Planted Riparian Areas on Enhancement Sites V: 47. Plant Native Trees and Shrubs in the Tacoma/Trimble Management Area. 11/01/2007 02/29/2008
Completed Spring and Fall Burns W: 31. Conduct Spring and Fall Controlled Burns in the Tacoma/Trimble Management Area 11/28/2007 02/29/2008
Properties Secured From Trespass X: 26. Secure 15 Properties and Provide Enforcement Management. 02/29/2008 02/29/2008
RM&E Data Used for Future Recommendations Y: 162. Analysis of RM&E data to determine management actions 02/29/2008 02/29/2008
Maintained database Z: 160. Maintain Database 02/29/2008 02/29/2008
Maintain Established Vegetation AA: 22. Maintain Previously Planted Materials within the Tacoma/Trimble Management Area. 09/28/2007 02/29/2008
Maintain Established Vegetation AB: 22. Maintain Previously Planted Materials within the Idaho Management Area. 09/28/2007 02/29/2008
Management of Vegetation AC: 22. Vegetation Management within Flying Goose Property 08/01/2007 02/29/2008
Fence Maintained AD: 186. Maintain Fence 02/29/2008 02/29/2008
Fence maintained AE: 186. Maintain Fence 02/29/2008 02/29/2008
Water Control Structures Maintained and Functioning AF: 186. Maintain Existing Water Control Structures on Wetland Enhancement Sites. 02/29/2008 02/29/2008
Buildings Maintained AG: 186. Manage and Maintain Facility to Maximal Standards 02/29/2008 02/29/2008
Shoreline Stabilization AH: 186. Maintain Integrity of Shoreline Stabilization Structures 02/29/2008 02/29/2008
Completed HEP Report AI: 87. Prepare HEP Reports for 2007 HEP surveys 02/29/2008
Completion of Required Project Reporting to BPA AJ: 119. Oversight of New Projects, Implementation, Construction, O&M, RM&E w/ participating agencies 02/29/2008 02/29/2008
Completed FY07 Annual Report to BPA AK: 132. Annual Report for 2007 Contract Cycle 02/29/2008 02/29/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 5 Land Purchase and/or Conservation Easement
  • 3 instances of WE 22 Maintain Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 31 Conduct Controlled Burn
  • 1 instance of WE 40 Install Fence
  • 3 instances of WE 47 Plant Vegetation
  • 1 instance of WE 53 Remove Vegetation
  • 2 instances of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete Permit Applications and Provide Documentation to Obtain Compliance. 02/09/2007
B 172 Complete hazardous waste assessments as a part of the pre-acquisition process. 02/09/2007
C 172 Complete cultural resource surveys. 02/09/2007
D 172 Complete surveys for properties where boundaries are in question. 02/09/2007
E 172 Conduct appraisals for prospective acquisitions 02/09/2007
F 172 Conduct title search as part of pre-acquisition process. 02/09/2007
G 172 Obtain Legal Description of Acquisitions. 02/09/2007
H 172 Identify Minimum HUs From Land Purchase 02/09/2007
I 189 Land Owner Coordination 02/09/2007
J 5 Acquire fee title lands. 02/09/2007
K 122 Review Designs and Details for Habitat Enhancements. 02/09/2007
L 174 Complete Management Plans for New Acquisitions in FY 06. 02/09/2007
M 157 Complete Field HEP for New Acquisitions. 12/17/2007
N 157 Conduct 5 year HEP updates 12/17/2007
O 181 Create Wetland Ponds on Tacoma/Trimble Management Area. 12/17/2007
P 181 Install 2 Culvert Gate Valves in Tacoma/Trimble Management Area. 12/17/2007
Q 29 Add LWD to Shoreline Stabilization on Tacoma/Trimble Management area 12/17/2007
R 40 Install Boundary Fencing Along Tacoma/Trimble Management Area. 12/17/2007
S 53 Removal of Undesired Plant Species 12/17/2007
T 47 Seed Shoreline Stabilization Site. 12/17/2007
U 47 Seed Newly Created Wetland Pond Shorelines. 12/17/2007
V 47 Plant Native Trees and Shrubs in the Tacoma/Trimble Management Area. 12/17/2007
W 31 Conduct Spring and Fall Controlled Burns in the Tacoma/Trimble Management Area 12/28/2007
X 26 Secure 15 Properties and Provide Enforcement Management. 02/09/2007
Y 162 Analysis of RM&E data to determine management actions 02/09/2007
Z 160 Maintain Database 02/09/2007
AA 22 Maintain Previously Planted Materials within the Tacoma/Trimble Management Area. 12/17/2007
AB 22 Maintain Previously Planted Materials within the Idaho Management Area. 02/09/2007
AC 22 Vegetation Management within Flying Goose Property 12/28/2007
AD 186 Maintain Fence 12/28/2007
AE 186 Maintain Fence 12/17/2007
AF 186 Maintain Existing Water Control Structures on Wetland Enhancement Sites. 12/17/2007
AG 186 Manage and Maintain Facility to Maximal Standards 12/19/2007
AH 186 Maintain Integrity of Shoreline Stabilization Structures 12/19/2007
AI 87 Prepare HEP Reports for 2007 HEP surveys 02/09/2007
AJ 119 Oversight of New Projects, Implementation, Construction, O&M, RM&E w/ participating agencies 02/09/2007
AK 132 Annual Report for 2007 Contract Cycle 02/09/2007
AL 185 Periodic Status Reports for BPA 02/09/2007