Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 31971: 200203200 EXP USFWS SNAKE R FALL CHN LIFE HISTORY INVESTIGATIONS
Project Number:
Title:
Snake River Fall Chinook Salmon Life History Investigations
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
31971
Contract Title:
200203200 EXP USFWS SNAKE R FALL CHN LIFE HISTORY INVESTIGATIONS
Contract Continuation:
Previous: Next:
28239: 2002-032-00 EXP USFWS FALL CHINOOK PASSAGE AT LOWER GRANITE DAM
  • 36374: 200203200 EXP USFWS SNAKE R FALL CHIN LIFE HISTORY INVESTIGATIONS
Contract Status:
Closed
Contract Description:
This project will be conducted by the US Geological Survey (USGS), US Fish and Wildlife Service (USFWS), Pacific Northwest National Laboratory (PNNL), and the University of Washington (UW). The goal of this project is to provide empirical data and analyses on the dam passage timing, travel rate, survival, and life history variation of fall Chinook salmon juveniles passing downstream in the four lower Snake River reservoirs from spring to winter.  The lack of this information has made it difficult to plan and evaluate aspects of hydrosystem operation including transportation and the timing and location of summer spill.  We propose to use radio telemetry, acoustic telemetry, and PIT tags to study migratory behavior, survival, and life history.  Subyearling fall Chinook salmon will be collected and tagged monthly from May through November in Snake and Clearwater rivers.  We will use radio telemetry to collect migration behavior and passage timing information.  We will use acoustic telemetry to measure survival and determine where and when fall Chinook salmon juveniles stop migrating and begin to exhibit the reservoir-type life history.  We will collect water velocity and temperature information throughout the reservoirs and use hydrodynamic modeling to characterize the environmental conditions where fish are located.  This will be done by linking observed patterns in juvenile fall Chinook salmon behavior with hydraulic data.  We will use a statistical approach to estimate survival of subyearling fall Chinook salmon that exhibit a reservoir life history.  Previously this has not been possible.  The results from this study will assist fish managers in making informed decisions about operating the hydrosystem, including issues associated with juvenile transportation and summer spill.
Account Type(s):
Expense
Contract Start Date:
04/01/2007
Contract End Date:
03/31/2008
Current Contract Value:
$49,277
Expenditures:
$49,277

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Ensure environmental compliance requirements are complete A: 165. Complete environmental compliance requirements 03/31/2008 03/31/2008
Install radio telemetry detection equipment B: 70. Install radio telemetry detection equipment 05/01/2007 05/01/2007
Obtain, tag, and release subyearlings with radio and PIT tags C: 158. Obtain and release tagged subyearlings 10/15/2007 10/15/2007
PIT-tag data uploaded to PITAGIS D: 157. Upload PIT-tag data 10/15/2007 10/15/2007
Monitor fish movement with fixed gear E: 157. Monitor fish movement with fixed gear 11/30/2007 11/30/2007
Monitor fish movement with mobile tracking F: 157. Monitor fish movement with mobile tracking 11/30/2007 11/30/2007
Management briefings G: 161. Brief managers and others 03/31/2008 03/31/2008
FY06 report complete and FY07 report started H: 132. Complete FY06 Annual Report and begin FY07 Annual Report 03/31/2008 03/31/2008
Complete all project management and administrative activities for contract I: 119. Contract and project management for 2002-032-00 03/31/2008 03/31/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete environmental compliance requirements 02/09/2007
B 70 Install radio telemetry detection equipment 03/13/2007
C 158 Obtain and release tagged subyearlings 10/02/2007
D 157 Upload PIT-tag data 03/13/2007
E 157 Monitor fish movement with fixed gear 03/13/2007
F 157 Monitor fish movement with mobile tracking 03/13/2007
G 161 Brief managers and others 02/09/2007
H 132 Complete FY06 Annual Report and begin FY07 Annual Report 02/09/2007
I 119 Contract and project management for 2002-032-00 02/09/2007
J 185 Periodic Status Reports for BPA 02/09/2007