Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 35684: 200739600 CAP RESTORE WALLA WALLA RIVER FLOW
Project Number:
Title:
Walla Walla Basinwide Tributary Passage and Flow
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
35684
Contract Title:
200739600 CAP RESTORE WALLA WALLA RIVER FLOW
Contract Continuation:
Previous: Next:
n/a
  • 49378: 2007-396-00 CAP RESTORE WALLA WALLA RIVER FLOW
Contract Status:
Closed
Contract Description:
This irrigation efficiency and groundwater recharge project will improve stream flows for the passage and rearing of summer steelhead, spring Chinook, and bull trout in a flow-impaired segment of the Walla Walla River. The Walla Walla Subbasin Plan’s highest priority project types are those that address imminent threats to ESA listed species, such as dry or low flow stream reaches. This project will address a Subbasin Plan priority restoration area that provides habitat and also passage to primary upstream spawning grounds. Irrigation efficiency projects will utilize the Oregon Conserved Water Program to ensure that conserved water is protected as an instream water right. Shallow aquifer recharge using high winter and spring runoff will benefit spring branches and mainstem cold water refugia.

A three-mile segment of the Walla Walla River near Milton-Freewater, Oregon was dewatered each summer for the last century creating the need for fish rescues. The rescues have not been necessary the last five years after aggressive irrigation efficiency programs and new wells now maintain at least 27 cfs instream throughout the spring and 25 cfs instream throughout the summer.  However, half of these bypass flows are created by an increase in supplemental well use at unsustainable rates. Additional irrigation conservation practices, combined with winter/spring groundwater recharge, will allow irrigators to reduce their demand on the river, reduce negative impacts to groundwater, and protect the conserved water as instream water rights.

Four piping projects, four on-farm efficiency projects, and expansion of an existing groundwater recharge site (see WE 'J') along with the retrofitting of two on-farm storage sites to seasonally function as recharge and the completion of designs for seventeen other recharge sites associated with existing irrigation delivery efficiency piping will be completed by the WWBWC, Walla Walla River Irrigation District, and Hudson Bay District Improvement Company. This project was identified as a priority during the ongoing Bi-State Habitat Conservation Planning with NMFS and USFWS, and in the Draft Bull Trout and Salmon Recovery Plans, and the Walla Walla Temperature TMDL.  In addition, measuring devices and flow management automation will be completed to assist valley irrigators in maintaining more efficiencies.
Account Type(s):
Capital
Contract Start Date:
09/01/2007
Contract End Date:
08/31/2010
Current Contract Value:
$1,294,200
Expenditures:
$1,294,200

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dawn Boorse Bonneville Power Administration No Env. Compliance Lead drboorse@bpa.gov (503) 230-5678
Sarah Branum Bonneville Power Administration Yes COR stbranum@bpa.gov (503) 230-5115
Wendy Harris Walla Walla Basin Watershed Council Yes Contract Manager wendy.harris@wwbwc.org (541) 938-2170
Brenda Heister Bonneville Power Administration Yes Contracting Officer bsheister@bpa.gov (503) 230-3531
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Lisa Marko MacLellan Bonneville Power Administration Yes Interested Party lmmarko@bpa.gov (503) 230-4047
Chris Sheets Walla Walla Basin Watershed Council No Administrative Contact chris.sheets@wwbwc.org (541) 938-2170
Brian Wolcott Walla Walla Basin Watershed Council Yes Supervisor brian.wolcott@wwbwc.org (541) 938-2170


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Funding Package - Submit draft to COTR B: 119. Admin oversight for Cap Activities 06/01/2010 07/10/2010
Environmental Compliance complete C: 165. Environmental Compliance Documentation for all cap actions 11/17/2008 11/17/2008
designs and specs complete D: 175. Pipeline, Aquifer Recharge, and On-Farm Storage Design/Specs 03/31/2009 03/31/2009
Install 500 Feet of Irrigation Piping E: 149. Powell-Pleasantview - Install pipeline 07/31/2009 03/31/2009
18,200 feet of pipeline installed F: 149. Hy-line - Install phases 2 & 3 pipeline 08/27/2010 08/31/2010
Flow meters and measuring devices installed H: 148. Flow meters to monitor farm water, turn out structures, and headgates 08/31/2010 08/31/2010
Morris sprinkler installed I: 150. Convert to sprinkler for farms off LWW diversion. 07/31/2010 08/31/2010
Drain Fields for Recharge Expansion Installed J: 98. Expand existing HBDIC aquifer recharge sites (Phase II) 10/30/2009 12/04/2009
Annual Report submitted K: 132. Submit report for period (September 2007) to (August 2008) 08/27/2010
Liner installed in existing bulge L: 151. NEW Burke Bulge Liner 08/27/2010 08/27/2010
Pre-Acquisition Activities Completed N: 172. NEW Pre-acquisition activities for purchase of recharge site 08/27/2010
Drain Fields for Recharge Expansion Installed O: 82. NEW Expand Recharge Program (Phase III) 07/31/2010
Negotiate In-stream Water Right Transactions S: 154. NEW In-stream Water Right Transactions 08/06/2010
Flow measuring device installed T: 148. NEW Little Walla Walla River Measurement Devices 08/31/2010
Automated headgate design complete V: 175. NEW Frog - Design System 08/31/2010
Grove Gauge Installed W: 148. NEW Grove School Bridge Monitoring Equipment 08/06/2010 08/31/2010
Water Right Transaction Complete Z: 164. NEW Acquire Water Instream for Powell/Trumbull Project 08/31/2010 08/31/2010
Water Right Transaction Complete AA: 164. NEW Acquire Water Instream for Eastside Project 08/31/2010 08/31/2010
Water Right Transaction Complete AB: 164. NEW Acquire Water Instream for Milton Ditch Project 08/31/2010 08/31/2010
Water Right Transaction Complete AC: 164. NEW Acquire Water Instream for Lydell/Brown Project 08/31/2010 08/31/2010
Environmental Compliance complete AD: 165. NEW Environmental Compliance Documentation for CAP projects 03/31/2010 06/01/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 98 Other
  • 2 instances of WE 175 Produce Design
  • 3 instances of WE 82 Install Well
  • 6 instances of WE 148 Install Flow Measuring Device
  • 4 instances of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler
  • 4 instances of WE 151 Line Diversion Ditch
  • 4 instances of WE 164 Acquire Water Instream
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 98 Other
  • 2 instances of WE 175 Produce Design
  • 3 instances of WE 82 Install Well
  • 6 instances of WE 148 Install Flow Measuring Device
  • 4 instances of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler
  • 4 instances of WE 151 Line Diversion Ditch
  • 4 instances of WE 164 Acquire Water Instream
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 98 Other
  • 2 instances of WE 175 Produce Design
  • 3 instances of WE 82 Install Well
  • 6 instances of WE 148 Install Flow Measuring Device
  • 4 instances of WE 149 Install Pipeline
  • 1 instance of WE 150 Install Sprinkler
  • 4 instances of WE 151 Line Diversion Ditch
  • 4 instances of WE 164 Acquire Water Instream

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 119 Admin oversight for Cap Activities 02/09/2007
C 165 Environmental Compliance Documentation for all cap actions 02/09/2007
D 175 Pipeline, Aquifer Recharge, and On-Farm Storage Design/Specs 02/09/2007
E 149 Powell-Pleasantview - Install pipeline 07/08/2008
F 149 Hy-line - Install phases 2 & 3 pipeline 10/09/2009
G 149 Trumbull Ditch Piping - Install Pipeline 07/08/2008
H 148 Flow meters to monitor farm water, turn out structures, and headgates 11/16/2007
I 150 Convert to sprinkler for farms off LWW diversion. 11/16/2007
J 98 Expand existing HBDIC aquifer recharge sites (Phase II) 11/16/2007
K 132 Submit report for period (September 2007) to (August 2008) 02/09/2007
L 151 NEW Burke Bulge Liner 02/09/2007
M 149 WE CANCELLED: NEW Fruitvale - Install Pipeline 02/09/2007
N 172 NEW Pre-acquisition activities for purchase of recharge site 02/09/2007
O 82 NEW Expand Recharge Program (Phase III) 04/08/2010
P 151 WE CANCELLED: NEW Reese Bulge 04/08/2010
Q 151 WE CANCELLED: NEW Tash Bulge 04/08/2010
R 151 WE CANCELLED: NEW Morris Bulge 04/08/2010
S 154 NEW In-stream Water Right Transactions 02/09/2007
T 148 NEW Little Walla Walla River Measurement Devices 06/08/2010
U 148 WE CANCELLED: NEW Spence Ditch Measurement Devices
V 175 NEW Frog - Design System 02/09/2007
W 148 NEW Grove School Bridge Monitoring Equipment 11/10/2009
X 148 WE CANCELLED: NEW Zell Ditch Measurement Devices
Y 148 WE CANCELLED: NEW Perkins Ditch Measurement Devices
Z 164 NEW Acquire Water Instream for Powell/Trumbull Project 02/09/2007
AA 164 NEW Acquire Water Instream for Eastside Project 02/09/2007
AB 164 NEW Acquire Water Instream for Milton Ditch Project 02/09/2007
AC 164 NEW Acquire Water Instream for Lydell/Brown Project 02/09/2007
AD 165 NEW Environmental Compliance Documentation for CAP projects 02/09/2007
AE 82 WE CANCELLED: NEW Brown Bulge Retrofit to include aquifer recharge
AF 82 WE CANCELLED: NEW Davis Bulge Retrofit to include aquifer recharge