Contract 37186: 2007-397-00 CAP JOHN DAY TRIB/PASS & FLOW-CAP
Project Number:
Title:
John Day Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
37186
Contract Title:
2007-397-00 CAP JOHN DAY TRIB/PASS & FLOW-CAP
Contract Continuation:
Previous: Next:
32331: 2007-397-00 CAP JOHN DAY TRIB/PASS & FLOW - WATERSHED RESTORATION
  • 46942: 2007-397-00 CAP JOHN DAY TRIB/PASS & FLOW-CAP
Contract Status:
Closed
Contract Description:
The John Day is the nation’s second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish.  Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon’s fourth largest drainage basin, and incorporates portions of eleven counties.  Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam.  With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance.

The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes).  In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands.  Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD) and the Wheeler Soil and Water Conservation Districts(WSWCD), which subcontract the majority of the construction implementation activities for these projects from the JDBO.  

The GSWCD/WSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects.  The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program.  Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department.

MOA Changes 6-08 Added $440,918  See line item budget for specific cost changes

Placeholders Tier 2 Projects added: WE R Woodard Project Pipeline, WE AG Voight Pipeline Project, and WE BK Beech Cr Project Push up Replacement.  Lick Creek Culvert Replacement Added Also, updated costs for several existing projects, ESA requirements, and design work for added projects.
Account Type(s):
Capital
Contract Start Date:
02/01/2008
Contract End Date:
01/31/2010
Current Contract Value:
$3,009,756
Expenditures:
$3,009,756

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Produce all required NEPA documents B: 165. Produce Environmental Compliance Documentation - 2008 05/30/2008 05/30/2008
Produce all required NEPA documents C: 165. Produce Environmental Compliance Documentation - 2009 05/30/2009 05/30/2009
BPA Project Administration Requirements D: 119. Manage Administer Projects 01/01/2010 12/31/2009
Data for Matrix of pathways used in NEPA Documents E: 157. ESA data collection for ESA Documents - 2008 01/31/2009 01/01/2009
Data for Matrix of pathways used in NEPA Documents F: 157. ESA data collection for ESA Documents - 2009 01/31/2010 09/30/2009
Greenhouse and Nursery Maintained G: 186. Native Plants Nursery Maintenance and operation 01/31/2010 09/30/2009
Maintain native Plants Nursery H: 22. Maintain Vegetation 12/28/2009 12/31/2009
9,000 cuttings and plants planted at construction sites. I: 47. Plant Vegetation 06/30/2009 06/30/2009
Kinzua Culvert J: 184. Kinzua Culvert 10/01/2008 09/30/2008
City of Fossil Culvert Passage Blockage Removal K: 184. City of Fossil Culvert #1 10/31/2009 09/01/2009
City of Fossil Culvert Passage Blockage Removal L: 184. City of Fossil Culvert #2 10/01/2009 08/31/2009
Fossil step pools M: 184. Fossil Step Pools 08/31/2008 08/31/2008
City of Mitchell Fish Passage Project N: 184. City of Mitchell Fish Passage Project - Diversion 09/01/2008 08/31/2008
Painted Hills Culvert Removal O: 184. Painted Hills Fish Passage/Culvert Removal 09/01/2009 08/31/2009
Stubblefield Culvert P: 184. Stubblefield Culvert 08/31/2008 08/31/2008
Hashknife Phase 2 Q: 149. Hashknife Phase #2 - pipeline 08/31/2008 08/31/2008
Woodward Phase #1 - tier two R: 149. Woodward Project pipeline- tier two 06/30/2009 11/27/2008
Collins Project Phase #1- tier two S: 149. Collins Project Phase #1- tier two 10/06/2009
Osborn Pipeline Phase #2 T: 149. Osborn Pipeline Project Phase #2 09/08/2009
Stanley Culvert U: 184. Stanley Culvert 08/31/2009 07/31/2009
Kinzua step-pool Culvert V: 184. Kinzua step-pool Culvert 08/31/2009
Bear Hollow Culvert W: 184. Bear Hollow Culvert 08/31/2009
Mitchell School Diversion and screen X: 84. Replace Existing Push-up Mitchell School Diversion 10/16/2009
Mitchell pump screen Y: 69. Mitchell School diversion screen 10/01/2009
Hashknife Upper Diversion Fish Passage Z: 184. Hashknife Upper Diversion Fish Passage 01/31/2010
Kinzua Golf Course Culvert - tier two AA: 184. Kinzua Golf Course Culvert - tier two 01/31/2010
Hashknife Phase 3 AB: 149. Hashknife Phase #3 - pipeline 08/31/2009 09/30/2009
Kinzua /highway Culvert - tier two AC: 184. Kinzua /highway Culvert- tier two 10/01/2009
Cottonwood Creek Culvert (Fossil) - tier two AD: 184. Cottonwood Creek Culvert (Fossil) - tier two 08/31/2008 08/31/2008
Collins Pipeline Phase #2 - tier two AE: 149. Collins Pipeline Phase #2 - tier two 08/31/2009
Voigt Phase #1 AF: 149. Voigt Pipeline Project Phase #1 11/30/2009
Voigt Phase #2- tier two AG: 149. Voigt Pipeline Project Phase #2 - tier two 11/30/2009
Project Designs for 2008/2009 Construction Projects AH: 175. Produce Design and/or Specifications - GSWCD 2008 01/31/2009 10/29/2008
Project Designs for 2009/2010 Construction Projects AI: 175. Produce Design and/or Specifications - GSWCD 2009 01/31/2010 12/31/2009
Dead Cow Culvert and fish passage structure AJ: 184. Dead Cow Gulch Fish Passage Phase 2 11/01/2008 08/31/2008
Blue Mountain Ditch Diversion AK: 84. Blue Mountain Ditch Diversion fish passage structure Phase 2 08/31/2008 08/31/2008
Huffstader Pump Station AL: 84. Huffstader Pump Station Phase 2 08/31/2008 08/31/2008
Panama Ditch Diversion AM: 84. Panama Ditch Diversion - mainstem 08/31/2008 08/31/2008
Brown Upper Diversion AN: 84. Replace Existing Push-up Brown Upper Diversion 08/31/2008 08/31/2008
Panama Ditch Beech Creek Diversion AO: 84. Replace Existing Push-up Panama Ditch Beech Creek Diversion 08/31/2008 08/31/2008
Lemons Ingle Ditch Diversion AP: 84. Replace Existing Push-up at Lemons/Ingle Ditch Diversion 08/31/2008 08/31/2008
Long Box Diversion AQ: 84. Replace Existing Push-up at Long Box Diversion 08/31/2008 08/31/2008
Smith/Holms Ditch Diversion AR: 84. Replace Existing Push-up at Smith/Holmes Ditch Diversion 08/31/2008 08/31/2008
Murray Pumping Stations AS: 84. Replace Existing Push-up at Murray Diversion with 2 PUMP Stations 10/06/2009
Murray #1 pump screen AT: 69. Murray pump #1 screen 10/06/2009
Murray #2 pump screen AU: 69. Murray pump #2 screen 10/06/2009
Kennedy Pump Station AV: 84. Replace Existing Push-up at Kennedy Diversion with PUMP Station 10/06/2009
Kennedy pump screen AW: 69. Kennedy diversion screen 10/06/2009
Mullin RFC AX: 149. Mullin RFC 12/31/2008 12/31/2008
Beech Creek Siphon - Tier Two AY: 80. Replace Existing Push-up Panama Beech Creek Siphon - Tier Two 08/30/2009
Cummins Diversion - Tier Two AZ: 84. Replace Existing Push-up at Cummins Diversion 09/30/2009 08/31/2009
Murray Kennedy Diversion BA: 84. Murray Kennedy Diversion Start up 08/31/2009
Stewart McRae Ditch Diversion (Stout) BB: 84. Replace Existing Push-up Stewart McRae Ditch Diversion (Stout) 08/31/2009 08/31/2009
Big Boulder Creek Diversion (Zaitz) BC: 84. Replace Existing Push-up Big Boulder Creek Diversion (Zaitz) 08/31/2009
Oliver Ditch No. 47 (Carter) BD: 84. Replace Existing Push-up Oliver Ditch No. 47 (Carter) 08/31/2009
Oliver Ditch No. 48 (Carter) BE: 84. Replace Existing Push-up Oliver Ditch No. 48 (Carter) 08/31/2009
Oliver Ditch No. 49 (Carter) BF: 84. Replace Existing Push-up Oliver Ditch No. 49 (Carter) 08/31/2009
Fry-Engle Ditch Diversion BG: 84. Replace Existing Push-up Fry-Engle Ditch Diversion 08/31/2009 08/31/2009
Kimball RFC BH: 149. Kimball RFC 12/31/2009 12/31/2009
Page Pump Station & Richard Davis Pump BI: 84. Page Pump Station & Richard Davis Pump 09/30/2009 08/31/2009
Page pump screen BJ: 69. Page diversion screen 10/01/2009
Beech Creek Diversion - tier two BK: 84. Replace Existing Push-up Beech Creek Diversion - tier two 08/31/2009
E. F. Canyon Creek Diversion - tier two BL: 84. Replace Existing Push-up E. F. Canyon Creek Diversion - tier two 08/31/2009
Deardorf Creek Diversion - 1 - tier two BM: 84. Replace Existing Push-up Deardorf Creek Diversion - 1 - tier two 08/31/2009
Deardorf Creek Diversion - 2 - tier two BN: 84. Replace Existing Push-up Deardorf Creek Diversion - 2 - tier two 08/31/2009
Attach Progress Report in Pisces BO: 132. Submit Progress Report for the period (Feb 1 2007) to (Jan 31 2008) 05/26/2008 06/30/2008
Attach Progress Report in Pisces BP: 132. Submit Progress Report for the period (Feb 1 2008) to (Jan 31 2009) 01/01/2010
Lick Creek Culvert BQ: 184. Lick Creek Culvert Replacement 08/31/2009 08/31/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 47 Plant Vegetation
  • 4 instances of WE 69 Install Fish Screen
  • 1 instance of WE 80 Install Siphon
  • 20 instances of WE 84 Remove/Install Diversion
  • 3 instances of WE 184 Install Fish Passage Structure
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 10 instances of WE 149 Install Pipeline
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 22 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 5 instances of WE 69 Install Fish Screen
  • 1 instance of WE 80 Install Siphon
  • 23 instances of WE 84 Remove/Install Diversion
  • 16 instances of WE 184 Install Fish Passage Structure
  • 2 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 10 instances of WE 149 Install Pipeline
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 149 Install Pipeline
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 84 Remove/Install Diversion
Trout, Bull (S. confluentus) (Threatened)
  • 3 instances of WE 84 Remove/Install Diversion
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 165 Produce Environmental Compliance Documentation - 2008 02/09/2007
C 165 Produce Environmental Compliance Documentation - 2009 02/09/2007
D 119 Manage Administer Projects 02/09/2007
E 157 ESA data collection for ESA Documents - 2008 03/10/2008
F 157 ESA data collection for ESA Documents - 2009 07/07/2009
G 186 Native Plants Nursery Maintenance and operation 03/10/2008
H 22 Maintain Vegetation 05/30/2008
I 47 Plant Vegetation 04/16/2008
J 184 Kinzua Culvert 03/21/2008
K 184 City of Fossil Culvert #1
L 184 City of Fossil Culvert #2
M 184 Fossil Step Pools 07/15/2008
N 184 City of Mitchell Fish Passage Project - Diversion 07/15/2008
O 184 Painted Hills Fish Passage/Culvert Removal 07/18/2008
P 184 Stubblefield Culvert 07/15/2008
Q 149 Hashknife Phase #2 - pipeline 04/16/2008
R 149 Woodward Project pipeline- tier two 06/30/2009
S 149 Collins Project Phase #1- tier two
T 149 Osborn Pipeline Project Phase #2 03/24/2008
U 184 Stanley Culvert
V 184 Kinzua step-pool Culvert
W 184 Bear Hollow Culvert
X 84 Replace Existing Push-up Mitchell School Diversion
Y 69 Mitchell School diversion screen
Z 184 Hashknife Upper Diversion Fish Passage
AA 184 Kinzua Golf Course Culvert - tier two
AB 149 Hashknife Phase #3 - pipeline
AC 184 Kinzua /highway Culvert- tier two 02/09/2007
AD 184 Cottonwood Creek Culvert (Fossil) - tier two 07/18/2008
AE 149 Collins Pipeline Phase #2 - tier two 02/09/2007
AF 149 Voigt Pipeline Project Phase #1 05/18/2009
AG 149 Voigt Pipeline Project Phase #2 - tier two 05/18/2009
AH 175 Produce Design and/or Specifications - GSWCD 2008 02/09/2007
AI 175 Produce Design and/or Specifications - GSWCD 2009 02/09/2007
AJ 184 Dead Cow Gulch Fish Passage Phase 2 03/24/2008
AK 84 Blue Mountain Ditch Diversion fish passage structure Phase 2 03/24/2008
AL 84 Huffstader Pump Station Phase 2 06/03/2008
AM 84 Panama Ditch Diversion - mainstem 05/12/2008
AN 84 Replace Existing Push-up Brown Upper Diversion 06/16/2008
AO 84 Replace Existing Push-up Panama Ditch Beech Creek Diversion 05/12/2008
AP 84 Replace Existing Push-up at Lemons/Ingle Ditch Diversion 05/30/2008
AQ 84 Replace Existing Push-up at Long Box Diversion 05/12/2008
AR 84 Replace Existing Push-up at Smith/Holmes Ditch Diversion 05/12/2008
AS 84 Replace Existing Push-up at Murray Diversion with 2 PUMP Stations 06/02/2008
AT 69 Murray pump #1 screen 06/02/2008
AU 69 Murray pump #2 screen 06/02/2008
AV 84 Replace Existing Push-up at Kennedy Diversion with PUMP Station 06/02/2008
AW 69 Kennedy diversion screen 06/02/2008
AX 149 Mullin RFC 05/30/2008
AY 80 Replace Existing Push-up Panama Beech Creek Siphon - Tier Two
AZ 84 Replace Existing Push-up at Cummins Diversion 07/07/2009
BA 84 Murray Kennedy Diversion Start up 06/03/2008
BB 84 Replace Existing Push-up Stewart McRae Ditch Diversion (Stout) 07/07/2009
BC 84 Replace Existing Push-up Big Boulder Creek Diversion (Zaitz) 07/07/2009
BD 84 Replace Existing Push-up Oliver Ditch No. 47 (Carter) 07/07/2009
BE 84 Replace Existing Push-up Oliver Ditch No. 48 (Carter) 07/14/2009
BF 84 Replace Existing Push-up Oliver Ditch No. 49 (Carter) 07/07/2009
BG 84 Replace Existing Push-up Fry-Engle Ditch Diversion 07/07/2009
BH 149 Kimball RFC
BI 84 Page Pump Station & Richard Davis Pump 07/02/2009
BJ 69 Page diversion screen 07/02/2009
BK 84 Replace Existing Push-up Beech Creek Diversion - tier two
BL 84 Replace Existing Push-up E. F. Canyon Creek Diversion - tier two
BM 84 Replace Existing Push-up Deardorf Creek Diversion - 1 - tier two
BN 84 Replace Existing Push-up Deardorf Creek Diversion - 2 - tier two
BO 132 Submit Progress Report for the period (Feb 1 2007) to (Jan 31 2008) 02/09/2007
BP 132 Submit Progress Report for the period (Feb 1 2008) to (Jan 31 2009) 02/09/2007
BQ 184 Lick Creek Culvert Replacement