Contract 38680: 2007-396-00 CAP GOSE STREET PASSAGE - FINISH
Project Number:
Project Title:
Walla Walla Basinwide Tributary Passage and Flow
BPA PM:
Project Stage:
Implementation
Project Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
38680
Contract Title:
2007-396-00 CAP GOSE STREET PASSAGE - FINISH
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
The importance of fish passage in Mill Creek and the background and relevance of this project are described in a short narrative attachment entitled "Gose Street Fish Passage Project -- One Pager".  The Gose Street Fish Passage project is about 80% complete.  WWCCD has $24,500 in SRFB funding which will be combined with BPA funds to finish construction of this important project.
Account Type(s):
Capital
Contract Start Date:
07/15/2008
Contract End Date:
01/31/2009
Current Contract Value:
$89,589
Expenditures:
$89,589

* Expenditures data includes accruals and are based on data through 31-Aug-2026.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Grant
Accrual category:
Passage
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

Contract(s):

38680

Dimensions: 1024 x 768

Contract(s):

38680

Dimensions: 1024 x 768

Contract(s):

38680

Dimensions: 1024 x 768

Description: Additional rock will be place shoreward and below downstream wall on right bank

Contract(s):

38680

Dimensions: 1024 x 768

Description: The "box" created by the new project and the remnant of the old structure which creates a potential location for stranding will be filled with rock with a concrete pad on top.

Contract(s):

38680

Dimensions: 1024 x 768


Full Name Organization Write Permission Contact Role Email Work Phone
Audrey Ahmann Walla Walla County Conservation District (SWCD) Yes Contract Manager audrey.ahmann@wwccd.net (509) 522-6340x107
Sarah Branum Bonneville Power Administration Yes COR stbranum@bpa.gov (503) 230-5115
Brenda Heister Bonneville Power Administration Yes Contracting Officer bsheister@bpa.gov (503) 230-3531
Rick Jones Walla Walla County Conservation District (SWCD) Yes Supervisor rick.jones@wwccd.net (509) 522-6340x110
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Rachel Rounds Bonneville Power Administration Yes Interested Party rarounds@bpa.gov (503) 230-3967
Jennifer Stolz Bonneville Power Administration No Env. Compliance Lead jpstolz@bpa.gov (503) 230-3233


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
BPA contract requirements complete B: 119. Manage Gose Street passage project 01/31/2009 12/31/2008
Attach Progress Report in Pisces C: 132. Submit Progress Report for the period 8/1/08 to 7/31/09 12/31/2008 12/31/2008
Project completed according to PE stamped design D: 184. Complete Gose Street fish passage structures 11/15/2008 11/15/2008
Documentation and assistance to support BPA's Environmental Compliance Group E: 165. Ensure project environmental compliance is current 11/15/2008 11/15/2008

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 119 Manage Gose Street passage project 02/09/2007
C 132 Submit Progress Report for the period 8/1/08 to 7/31/09 02/09/2007
D 184 Complete Gose Street fish passage structures 07/14/2008
E 165 Ensure project environmental compliance is current 02/09/2007