Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 39094: 1988-115-25 YKFP WELL FIELD DATA COLLECTION
Project Number:
Title:
Yakima River Design and Construction-Yakima/Klickitat Fisheries Project (YKFP)
Stage:
Closed
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Contract Number:
39094
Contract Title:
1988-115-25 YKFP WELL FIELD DATA COLLECTION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
History
Contract Description:
The beneficial use of surface water from the Yakima River and groundwater from six wells is limited to the terms and conditions stipulated in the Temporary Permits issued by the Washington Department of Ecology, Central Regional Office, Yakima, Washington.  the original permits issued by Ecology dated April 7, 2997, were amended for both surface and ground water use in April of 2002 and again in June 2007.  these permits require a number of task be accomplished including weekly well field monitoring.  The well field monitoring program was developed by CH2M Hill and is carried out by the hatchery staff at the Cle Elum Science & Research Facility (CESRF) via data collection and reporting.  (CH2M Hill is under separate contract to perform analysis and semi-annual reports using this information - YKFP Design and Construction 1988-115-25).

Well water usage is monitoring weekly, well meter readings, and the data are submitted by the hatchery manager on a quarterly basis.  Surface water usage, reported in the form of average hatchery flows to the facility is also turned in at the same time with the well water usage reports.

The hatchery staff conduct weekly groundwater monitoring and send reports to Jeff Randall, Hydro geologist of Ch2M Hill for analysis.  Anna Hoselton, Water Resources Specialist at WA Department of Ecology, also received the groundwater usage reports.
Account Type(s):
Expense
Contract Start Date:
08/19/2008
Contract End Date:
06/30/2013
Current Contract Value:
$15,892
Expenditures:
$15,892

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Rachel Castilleja Yakama Confederated Tribes No Administrative Contact casr@yakamafish-nsn.gov (509) 865-5121x6337
Sandra Fife Bonneville Power Administration Yes COR safife@bpa.gov (503) 230-3678
Chris Fryefield Bonneville Power Administration Yes Env. Compliance Lead cbfryefield@bpa.gov (503) 230-4187
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Rosemary Mazaika Bonneville Power Administration No Interested Party rxmazaika@bpa.gov (503) 230-5869
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Michelle O'Malley Bonneville Power Administration Yes Interested Party mmomalley@bpa.gov (503) 230-5138
Mel Sampson Yakama Confederated Tribes No Supervisor mel@yakama.com (509) 865-5121x6303
Charles Strom Yakama Confederated Tribes Yes Contract Manager osprey@qwestoffice.net (509) 674-3701
Adrienne Wilson Yakama Confederated Tribes Yes Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Monthly Aquifer Water Measurement Reports & Well Pumping Rates B: 157. Well Water Data Collection 8/19/08 - 4/30/09 04/30/2009 04/30/2009
Monthly Aquifer Water Measurement Reports & Well Pumping Rates C: 157. Well Water Data Collection 5/1/09 - 4/30/10 04/30/2010 04/30/2010
Monthly Aquifer Water Measurement Reports & Well Pumping Rates D: 157. Well Water Data Collection 5/1/10 - 4/30/11 04/30/2011 04/29/2011
Monthly Aquifer Water Measurement Reports & Well Pumping Rates E: 157. Well Water Data Collection 5/1/11 - 4/30/12 04/30/2012 04/30/2012
Monthly Aquifer Water Measurement Reports & Well Pumping Rates F: 157. Well Water Data Collection 5/1/12 - 4/30/13 04/30/2013 04/30/2012
Funding Package - Submit draft to COTR G: 119. September Accruals; Renew contract, if needed 01/01/2013 01/01/2012
Provide EC Lead Assistance When Required I: 165. Produce Environmental Compliance Documentation as Needed 06/30/2013 05/16/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 157 Well Water Data Collection 8/19/08 - 4/30/09 07/30/2008
C 157 Well Water Data Collection 5/1/09 - 4/30/10 08/11/2009
D 157 Well Water Data Collection 5/1/10 - 4/30/11 05/01/2010
E 157 Well Water Data Collection 5/1/11 - 4/30/12 02/14/2011
F 157 Well Water Data Collection 5/1/12 - 4/30/13 02/14/2011
G 119 September Accruals; Renew contract, if needed 02/09/2007
H 132 Submit Progress Report 02/09/2007
I 165 Produce Environmental Compliance Documentation as Needed 02/09/2007