Project 1988-115-25 - Yakima River Design and Construction-Yakima/Klickitat Fisheries Project (YKFP)
Project Number:
1988-115-25
Title:
Yakima River Design and Construction-Yakima/Klickitat Fisheries Project (YKFP)
Summary:
May 2011 Project Update to reflect current CESRF Hatchery Mitigation Requirements:
Through operation of the groundwater wells at the Cle Elum Supplementation and Research Facility, associated wetlands have been impacted by lowering of the groundwater table. Mitigation for wetland impacts has been undertaken at Tillman Creek, however additional mitigation is needed due to the magnitude of impact.. The Boones property acquisition and restoration proposal presents an opportunity for mitigation that is geographically strategic, cost-effective and ecologically significant. The Boones Pond mitigation project includes channel creation, wetland creation, flow control structures, and habitat enhancement. This project includes obtaining either a land purchase or property easement from the City of Cle Elum as well as an easement from a private land owner. Completion of the Boones Pond project is expected to complete mitigation requirements for the Cle Elum Hatchery dried wetland loss.

-------------------------
Pre- May 2011:
This proposal is in support of the design and construction of replacement YKFP M&E facilities at Nelson Springs, WA. This proposal represents the fulfillment of the feasibility justification that was completed and previously submitted to the NW Power Planning Council and Bonneville Power Administration (BPA)> The authorization to proceed with this is included in the BIOP Agreement executed between the Yakama Nation and BPA. As referenced in the budget, it will include the installation of a modular type of facility, demolition/removal of the existing facilities, site preparation, water and sewer, revision of the bull pen fencing and a storage complex. The property which will accommodate these facilities is owned by BPA.
Proposer:
None
Proponent Orgs:
Yakama Confederated Tribes (Tribe)
Starting FY:
2004
Ending FY:
2023
Stage:
Area:
Province Subbasin %
Columbia Plateau Yakima 100.00%
Purpose:
Artificial Production
Emphasis:
Supplementation
Focal Species:
All Anadromous Salmonids
Chinook - All Populations
Chinook - Mid-Columbia River Spring ESU
Chinook - Upper Columbia River Spring ESU
Chinook - Upper Columbia River Summer/Fall ESU
Coho - Unspecified Population
Lamprey, Pacific
Steelhead - Middle Columbia River DPS
Wildlife
Species Benefit:
Anadromous: 100.0%   Resident: 0.0%   Wildlife: 0.0%
Special:
None
BiOp Association:
None

No photos have been uploaded yet for this Project.

Summary of Budgets

To view all expenditures for all fiscal years, click "Project Exp. by FY"

To see more detailed project budget information, please visit the "Project Budget" page

No Decided Budget Transfers

Pending Budget Decision?  No


Actual Project Cost Share

Current Fiscal Year — 2025
Cost Share Partner Total Proposed Contribution Total Confirmed Contribution
There are no project cost share contributions to show.
Previous Fiscal Years
Fiscal Year Total Contributions % of Budget
2019
2018
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008

Contracts

The table below contains contracts with the following statuses: Active, Closed, Complete, History, Issued.
* "Total Contracted Amount" column includes contracted amount from both capital and expense components of the contract.
Capital Contracts:
Number Contractor Name Title Status Total Contracted Amount Dates
422 REL 26 SOW MWH Global, Inc. 1988-115-25 YKFP DESIGN AND CONSTRUCTION Closed $179,947 1/2/2002 - 6/30/2003
9718 SOW Sheldon and Associates, Inc. 1988-115-25 CLE ELUM (YAKIMA) HATCHERY History $38,519 5/15/2002 - 10/31/2003
9878 SOW Wilsonart International 1988-115-25 INTERPRETIVE SIGNS PRODUCTION Closed $12,189 5/28/2002 - 6/15/2003
9805 SOW Noel Design 1988-115-25 INTERPRETIVE PANELS FOR CHE ELUM HATCHERY History $32,126 5/28/2002 - 7/2/2003
596 REL 3 SOW Historical Research Associates, Inc. TILLMAN CREEK LIT REVIEW & ARCH FIELD SURVEY History $4,283 10/1/2003 - 12/31/2003
429 REL 25 SOW Fishpro, Inc. PI 1988-115-25 YKFP DESIGN & CONST/ACCLIM SITE PUMP EVALUATION History $38,507 12/22/2003 - 8/30/2005
19061 SOW CH2M-Hill, Inc. 198811525 YKFP - CLE ELUM HATCHERY WELL FIELD MONITORING History $74,708 8/4/2004 - 1/31/2008
Expense Contracts:
Number Contractor Name Title Status Total Contracted Amount Dates
BPA-011644 Bonneville Power Administration FY97 Acquisitions Active $0 10/1/1996 - 9/30/1997
10967 SOW Don Wilton Surveying 1988-115-25 YKFP DESIGN & CONSTRUCTION History $8,190 8/14/2002 - 10/20/2002
23320 SOW OTAK Inc 1988-115-25 DESIGN AND CONST - TILLMAN CREEK RESTORATION History $237,600 6/3/2005 - 12/31/2011
36702 SOW CH2M-Hill, Inc. 1988-115-25 EXP YKFP-CLE ELUM HATCHERY WELL FIELD MONITORING History $160,291 1/1/2008 - 2/28/2014
39095 SOW Central Washington University 1988-115-25 CAP YKFP LAND SURFACE ELEVATION M&E History $18,109 8/1/2008 - 7/31/2013
39094 SOW Yakama Confederated Tribes 1988-115-25 YKFP WELL FIELD DATA COLLECTION History $15,892 8/19/2008 - 6/30/2013
BPA-006621 Bonneville Power Administration Boones Pond Mitigation Land Purchase/CE Active $0 10/1/2011 - 9/30/2012
BPA-007040 Bonneville Power Administration Boones mitigation properties Active $4,171 10/1/2012 - 9/30/2013
56662 REL 26 SOW Yakama Confederated Tribes 1988-115-25 EXP YN BOONES POND WETLAND MITIGATION Closed $24,221 7/1/2013 - 6/30/2014
BPA-007569 Bonneville Power Administration FY14 Expendse Land Acquisitions Active $33,039 10/1/2013 - 9/30/2014
BPA-008236 Bonneville Power Administration TBL work Active $703 10/1/2014 - 9/30/2015
BPA-008561 Bonneville Power Administration FY16 TBL Realty Services Active $2,003 10/1/2015 - 9/30/2016
BPA-009457 Bonneville Power Administration FY17 Land Acquisition & TBL Task Orders Active $2,410 10/1/2016 - 9/30/2017
BPA-010177 Bonneville Power Administration FY18 Land Acquisition Active $0 10/1/2017 - 9/30/2018
BPA-010596 Bonneville Power Administration FY19 Land Aquisitions/other Active $0 10/1/2018 - 9/30/2019
82331 SOW Kittitas Conservation Trust 1988-115-25 EXP YAKIMA RIVER DESIGN AND CONSTRUCTION Closed $19,552 6/1/2019 - 5/31/2020
BPA-011328 Bonneville Power Administration FY20 Land Acquisitions/Misc. Active $477,771 10/1/2019 - 9/30/2020
85420 SOW Kittitas Conservation Trust WETLAND MITIGATION PROPERTY -EAGLE BEND ACTIVITIES Closed $6,914 6/1/2020 - 5/31/2021



Annual Progress Reports
Expected (since FY2004):13
Completed:11
On time:10
Status Reports
Completed:109
On time:29
Avg Days Late:41

                Count of Contract Deliverables
Earliest Contract Subsequent Contracts Title Contractor Earliest Start Latest End Latest Status Accepted Reports Complete Green Yellow Red Total % Green and Complete Canceled
BPA-11644 FY97 Acquisitions Bonneville Power Administration 10/01/1996 09/30/1997 Active 0 0 0 0 0 0 0
429 REL 25 PI 1988-115-25 YKFP DESIGN & CONST/ACCLIM SITE PUMP EVALUATION Fishpro, Inc. 12/22/2003 08/30/2005 History 1 0 0 0 0 0 0
19061 36702 1988-115-25 EXP YKFP-CLE ELUM HATCHERY WELL FIELD MONITORING CH2M-Hill, Inc. 08/04/2004 02/28/2014 History 33 18 0 0 0 18 100.00% 0
23320 1988-115-25 DESIGN AND CONST - TILLMAN CREEK RESTORATION OTAK Inc 06/03/2005 12/31/2011 History 23 23 0 0 3 26 88.46% 0
39095 1988-115-25 CAP YKFP LAND SURFACE ELEVATION M&E Central Washington University 08/01/2008 07/31/2013 History 21 10 0 0 0 10 100.00% 0
39094 1988-115-25 YKFP WELL FIELD DATA COLLECTION Yakama Confederated Tribes 08/19/2008 06/30/2013 History 19 7 0 0 0 7 100.00% 0
BPA-6621 Boones Pond Mitigation Land Purchase/CE Bonneville Power Administration 10/01/2011 09/30/2012 Active 0 0 0 0 0 0 0
BPA-7040 Boones mitigation properties Bonneville Power Administration 10/01/2012 09/30/2013 Active 0 0 0 0 0 0 0
56662 REL 26 1988-115-25 EXP YN BOONES POND WETLAND MITIGATION Yakama Confederated Tribes 07/01/2013 06/30/2014 Closed 4 0 0 0 8 8 0.00% 0
BPA-7569 FY14 Expendse Land Acquisitions Bonneville Power Administration 10/01/2013 09/30/2014 Active 0 0 0 0 0 0 0
BPA-8236 TBL work Bonneville Power Administration 10/01/2014 09/30/2015 Active 0 0 0 0 0 0 0
BPA-8561 FY16 TBL Realty Services Bonneville Power Administration 10/01/2015 09/30/2016 Active 0 0 0 0 0 0 0
BPA-9457 FY17 Land Acquisition & TBL Task Orders Bonneville Power Administration 10/01/2016 09/30/2017 Active 0 0 0 0 0 0 0
BPA-10177 FY18 Land Acquisition Bonneville Power Administration 10/01/2017 09/30/2018 Active 0 0 0 0 0 0 0
BPA-10596 FY19 Land Aquisitions/other Bonneville Power Administration 10/01/2018 09/30/2019 Active 0 0 0 0 0 0 0
82331 85420 WETLAND MITIGATION PROPERTY -EAGLE BEND ACTIVITIES Kittitas Conservation Trust 06/01/2019 05/31/2021 Closed 8 4 0 0 1 5 80.00% 0
BPA-11328 FY20 Land Acquisitions/Misc. Bonneville Power Administration 10/01/2019 09/30/2020 Active 0 0 0 0 0 0 0
Project Totals 109 62 0 0 12 74 83.78% 0


The table content is updated frequently and thus contains more recent information than what was in the original proposal reviewed by ISRP and Council.

Review: FY07-09 Solicitation Review

Council Recommendation

Assessment Number: 1988-115-25-NPCC-20090924
Project: 1988-115-25 - Yakima River Design and Construction-Yakima/Klickitat Fisheries Project (YKFP)
Review: FY07-09 Solicitation Review
Approved Date: 10/23/2006
Recommendation: Do Not Fund
Comments:

Independent Scientific Review Panel Assessment

Assessment Number: 1988-115-25-ISRP-20060831
Project: 1988-115-25 - Yakima River Design and Construction-Yakima/Klickitat Fisheries Project (YKFP)
Review: FY07-09 Solicitation Review
Completed Date: 8/31/2006
Final Round ISRP Date: None
Final Round ISRP Rating: Meets Scientific Review Criteria (Qualified)
Final Round ISRP Comment:
See overall comments for the five related Yakima/Klickitat Fishery Projects under proposal 19881205.

Comments specific to this proposal:

The Nelson Springs project is a one-time project outlay for a capital construction and infrastructure improvement project for the YKFP ultimately seeking to replace dilapidated facilities office space on the Yakima Nation lands used by eight people. A central function of the facility is to warehouse data and serve as a field office for staff conducting M&E functions. Objectives and expected outcomes are sufficiently clear for the construction project.

The project is a component of the effort to improve M&E capabilities for the broader YKFP. Specifically as part of the broader YKFP, the proposed project addresses M&E facilities and data management warehousing needs; however, the relationship of need to Subbasin Plans and Regional Programs was a bit tenuous for this construction project. Sponsors need to better describe how the entire YKFP fits into the Subbasin Plan. Linkages to other YKFP related projects were presented briefly.

The project's history was adequately described including the reexamination of the kind of replacement facility to be used. This refinement has led to a lower overall cost and, presumably, more rapid replacement of facilities. The description of methods is non-biological and described in general detail. Greater specifics will be included in site and architectural plans.
Documentation Links:

Legal Assessment (In-Lieu)

Assessment Number: 1988-115-25-INLIEU-20090521
Project Number: 1988-115-25
Review: FY07-09 Solicitation Review
Completed Date: 10/6/2006
In Lieu Rating: Problems May Exist
Cost Share Rating: 3 - Does not appear reasonable
Comment: Funding for new administrative facility; assuming that this facility utilized for BPA funded-projects RM&E only, then rated a "1"; if utilized for other tribal or other activities, then need cost share or other remedy.

Capital Assessment

Assessment Number: 1988-115-25-CAPITAL-20090618
Project Number: 1988-115-25
Review: FY07-09 Solicitation Review
Completed Date: 10/25/2007
Capital Rating: Qualifies for Capital Funding
Capital Asset Category: Hatchery
Comment: The State of Washington Department of Ecology (DOE) amended the Cle Elum Hatchery temporary permits associated with water rights applications in June 2007. The amended permit is to conduct further collection of groundwater data during hatchery operations and to authorize beneficial use for continuous fish propagation. Without the additional groundwater data, DOE can not issue a final permit to extract groundwater for hatchery operation and thus the option to use groundwater for hatchery operation will be eliminated. The funding needed is less than $1.0 million, however it was determined since this need is tied to the original construction of the hatchery, not enhancements, it would fall under the same project number and be capital. Capital funding approval submitted by BPA COTR. The COTR, COTR's Manager and BPA Accountant certified that the request meets the BPA F&W capital policy and is approved for capital funding

Project Relationships: None

Name Role Organization
Peter Lofy Supervisor Bonneville Power Administration
David Gerth (Inactive) Supervisor Kittitas Conservation Trust
Mitchell Long Project Lead Kittitas Conservation Trust
Shawn Skinner Env. Compliance Lead Bonneville Power Administration
Michelle O'Malley Project Manager Bonneville Power Administration