Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 39187: 2007-170-00 EXP S.F. SNAKE R. YELLOWSTONE CUTTHROAT
Project Number:
Title:
South Fork Snake River Yellowstone Cutthroat Trout Recruitment and Survival Improvement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Upper Snake Snake Headwaters 100.00%
Contract Number:
39187
Contract Title:
2007-170-00 EXP S.F. SNAKE R. YELLOWSTONE CUTTHROAT
Contract Continuation:
Previous: Next:
35159: 2007-170-00 EXP S. FORK SNAKE RIVER YELLOWSTONE CUTTHROAT TROUT
  • 44377: 2007-170-00 EXP S. FORK SNAKE R. YELLOWSTONE CUTTHROAT RECRUIT
Contract Status:
Closed
Contract Description:
The South Fork of the Snake River, from Palisades Dam to the confluence with the Henry's Fork, supports a popular and productive fishery.   Palisades Dam, a U.S. Bureau of Reclamation project, regulates flows in this reach of the river.  Flows vary considerably based on the need for irrigation water, power production and flood control.  Life history strategies of native Yellowstone cutthroat trout (YCT) include both tributary and mainstem spawning and rearing.  Rainbow trout, a non-native species, are now well established in the mainstem and are a significant threat to the genetic integrity and population viability of cutthroat trout.  In cooperation with agency and non-governmental stakeholders, the Idaho Department of Fish and Game (Department) has developed a three-pronged approach to insure the long-term survival of the YCT population.  These consist of flow management, an outreach program intended to encourage anglers to harvest rainbow and hybrid trout, and tributary spawner management.  

This statement of work is associated with the third component, tributary spawner management, consisting of the development and operation of fish trapping facilities the four main spawning tributaries for cutthroat trout (Burns, Pine, Rainey, and Palisades creeks).  The intent of these facilities is to conserve the genetic integrity of the YCT population through the collection all upstream spawning migrants, and based on phenotypic examination, pass YCT upstream and remove rainbow and hybrid trout.  The traps have been operated since 2001.  In the six years since, we have identified many limitations and obstacles to effective trapping related to the high and unpredictable runoff.  In 2007 we operated a temporary electrical weir, borrowed from another facility.  Our initial trials, combined with the successful application of this technology in the Blackfoot and Payette rivers suggests the objective of protecting, enhancing, and restoring the genetic integrity of the Yellowstone cutthroat population that spawns and rears in these streams may best be met through the use of an electrical weir in at least three of the four tributaries.  We have prioritized the four tributaries based on biological need and the applicability of the electrical barriers and will install permanent electrical weir facilities in Palisades and Pine creeks initially.  We will then investigate whether an electrical barrier or a velocity barrier will be most suited to Burns and Rainey creeks.
Account Type(s):
Expense
Contract Start Date:
10/01/2008
Contract End Date:
09/30/2009
Current Contract Value:
$339,251
Expenditures:
$339,251

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Jan Brady Bonneville Power Administration Yes COR jebrady@bpa.gov (503) 230-4514
Mickey Carter Bonneville Power Administration No Env. Compliance Lead macarter@bpa.gov (503) 230-5885
Brett High Idaho Department of Fish and Game (IDFG) Yes Contract Manager brett.high@idfg.idaho.gov (208) 525-7290
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Steve Schmidt Idaho Department of Fish and Game (IDFG) No Supervisor sschmidt@idfg.idaho.gov (208) 525-7290
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Funding Package - Submit draft to COTR A: 119. Routine admin of contract 08/03/2009
Environmental Compliance data for construction of fish passage barriers in Rainey and Pine creeks B: 165. Complete all necessary EC 06/15/2009
An environmental analysis has been prepared for construction of the Rainey Cr electrical barrier. E: 190. Complete environmental assessment for Rainey Creek 08/30/2009
Fish trapping and sorting facility at Rainey Creek fully designed F: 70. Rainey Creek fish trap and ladder 08/31/2009
A barrier is installed at Burns Creek to prevent rainbow trout invasion I: 190. Construction of a velocity barrier at Burns Cr 11/30/2008
Fish trapping and sorting facility at Burns Creek fully functional J: 70. Burns Creek fish trap and ladder 11/30/2008
Fish trapping and sorting facility at Palisades Creek is fully functional K: 70. Palisades Creek fish trap and ladder 04/15/2009
A barrier is installed in Palisades Creek to prevent rainbow trout invasion L: 190. Palisades Creek electric weir 05/31/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Yellowstone (O. c. bouvieri)
  • 4 instances of WE 190 Remove, Exclude and/or Relocate Animals
  • 4 instances of WE 70 Install Fish Monitoring Equipment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Routine admin of contract 02/09/2007
B 165 Complete all necessary EC 02/09/2007
C 190 Exclude Rainbow Trout from Pine Creek 02/20/2008
D 70 Pine Creek fish trap and ladder 02/20/2008
E 190 Complete environmental assessment for Rainey Creek
F 70 Rainey Creek fish trap and ladder
G 132 Submit Progress Report for the period (Oct 2008) to (Dec 2009) 02/09/2007
H 185 Periodic Status Reports for BPA 02/09/2007
I 190 Construction of a velocity barrier at Burns Cr 02/09/2007
J 70 Burns Creek fish trap and ladder 07/01/2008
K 70 Palisades Creek fish trap and ladder 02/09/2007
L 190 Palisades Creek electric weir 02/09/2007