Contract 44377: 2007-170-00 EXP S. FORK SNAKE R. YELLOWSTONE CUTTHROAT RECRUIT
Project Number:
Title:
South Fork Snake River Yellowstone Cutthroat Trout Recruitment and Survival Improvement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Upper Snake Snake Headwaters 100.00%
Contract Number:
44377
Contract Title:
2007-170-00 EXP S. FORK SNAKE R. YELLOWSTONE CUTTHROAT RECRUIT
Contract Continuation:
Previous: Next:
39187: 2007-170-00 EXP S.F. SNAKE R. YELLOWSTONE CUTTHROAT
  • 49516: 2007-170-00 EXP S FORK SNAKE R. YELLOWSTONE CUTTHROAT RECRUITMENT
Contract Status:
Closed
Contract Description:
The South Fork of the Snake River, from Palisades Dam to the confluence with the Henry's Fork, supports a popular and productive fishery.   Palisades Dam, a U.S. Bureau of Reclamation project, regulates flows in this reach of the river.  Flows vary considerably based on the need for irrigation water, power production and flood control.  Life history strategies of native Yellowstone cutthroat trout (YCT) include both tributary and mainstem spawning and rearing.  Rainbow trout, a non-native species, are now well established in the mainstem and are a significant threat to the genetic integrity and population viability of cutthroat trout.  In cooperation with agency and non-governmental stakeholders, the Idaho Department of Fish and Game (Department) has developed a three-pronged approach to insure the long-term survival of the YCT population.  These consist of flow management, an outreach program intended to encourage anglers to harvest rainbow and hybrid trout, and tributary spawner management.  

This statement of work is associated with the third component, tributary spawner management, consisting of the development and operation of fish trapping facilities the four main spawning tributaries for cutthroat trout (Burns, Pine, Rainey, and Palisades creeks).  The intent of these facilities is to conserve the genetic integrity of the YCT population through the collection all upstream spawning migrants, and based on phenotypic examination, pass YCT upstream and remove rainbow and hybrid trout.  The traps have been operated since 2001.  In the six years since, we have identified many limitations and obstacles to effective trapping related to the high and unpredictable runoff.  In 2007 we operated a temporary electrical weir, borrowed from another facility.  Our initial trials, combined with the successful application of this technology in the Blackfoot and Payette rivers suggests the objective of protecting, enhancing, and restoring the genetic integrity of the Yellowstone cutthroat population that spawns and rears in these streams may best be met through the use of an electrical weir in at least three of the four tributaries.  We have prioritized the four tributaries based on biological need and the applicability of the electrical barriers and will install permanent electrical weir facilities in Palisades and Pine creeks initially.  We will then investigate whether an electrical barrier or a velocity barrier will be most suited to Burns and Rainey creeks.
Account Type(s):
Expense
Contract Start Date:
10/01/2009
Contract End Date:
09/30/2010
Current Contract Value:
$250,125
Expenditures:
$250,125

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Funding Package - Submit draft to COTR A: 119. Routine admin of contract 08/03/2010 08/25/2010
Environmental Compliance data for construction of fish barriers in Rainey and Pine creeks B: 165. Complete all necessary EC 06/30/2010 08/18/2010
Completion of Pine Creek Weir Modifications C: 190. Exclude Rainbow Trout from Pine Creek 12/15/2009 05/20/2009
Construction of an electrical barrier on Rainey Creek D: 190. Exclude Rainbow Trout from Rainey Creek 08/31/2010
Fish trapping and sorting facility at Rainey Creek fully designed E: 70. Rainey Creek fish trap and ladder 02/28/2010 08/12/2009
Attach Progress Report in Pisces G: 132. Submit Progress Report for the period October 1 thru Sept 30 2010 08/16/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Cutthroat Trout, Yellowstone (O. c. bouvieri)
  • 2 instances of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 70 Install Fish Monitoring Equipment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Routine admin of contract 02/09/2007
B 165 Complete all necessary EC 02/09/2007
C 190 Exclude Rainbow Trout from Pine Creek 02/09/2007
D 190 Exclude Rainbow Trout from Rainey Creek 08/16/2010
E 70 Rainey Creek fish trap and ladder 08/16/2010
F 185 Periodic Status Reports for BPA 02/09/2007
G 132 Submit Progress Report for the period October 1 thru Sept 30 2010 02/09/2007