Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 39846: 199604300 EXP JCAPE O&M
Project Number:
Title:
Johnson Creek Artificial Propagation Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
39846
Contract Title:
199604300 EXP JCAPE O&M
Contract Continuation:
Previous: Next:
36086: 199604300 EXP JCAPE O/M
  • 45240: 199604300 EXP JCAPE O&M
Contract Status:
Closed
Contract Description:
Contract Background Section:

This project is a small-scale supplementation initiative designed to increase the survival of a weak but recoverable spawning aggregate of summer chinook salmon.  The goal of this project is to prevent the extirpation of the Endangered Species Act (ESA) listed Johnson Creek summer chinook and begin their recovery through supplementation.  This project is permitted by the NOAA Fisheries to rear up to 110,000 chinook salmon smolts each year for release back into Johnson Creek from 2006 through 2010.  This level of supplementation will be evaluated during this period to determine the success of the spawning supplementation adult salmon.  Supplementation under this project is planned for a minimum of five (5) salmon generations or 25 years.

The Johnson Creek Artificial Propagation Enhancement Project (JCAPE) is identified in the 2008 FCRPS Biological Opinion in RPA Hatchery Strategy 2, Action 41 – Implement Safety Net Programs to Preserve Genetic Resources and Reduce Short-term Extinction Risk. Specifically, for Snake River Spring/Summer Chinook.  It is further stated in this RPA to fund the Johnson Creek/South Fork Salmon River safety net supplementation program, as described in the existing Section 10 permit.  This action funds the actual implementation, operation, and monitoring of a safety net project.  The Johnson Creek Artificial Propagation Enhancement project, a safety net project, utilizes existing hatchery facilities (McCall Fish Hatchery) to conduct salmon supplementation of up to 110,000 smolts per year.  The Johnson Creek Artificial Propagation Enhancement Project is the only chinook salmon supplementation project in the Salmon River Basin.  The Johnson Creek Artificial Propagation Enhancement Project has been issued an ESA Section 10 permit (Permit number 1250) by NOAA Fisheries to conduct salmon supplementation activities through 2010.

This contract will provide funds to:
·        Conduct Salmon Supplementation of the Johnson Creek Summer Chinook Salmon, a safety net program;
·        Provide for administrative oversight of the project; and
·        Share project results through Reports and Presentations

In 2009, installation and operation of a temporary adult chinook salmon weir and trap will continue with the collection of brood stock for use in the Johnson Creek Artificial Propagation Enhancement Project.  Juvenile salmon (smolts) from the 2007 brood year will be released back into Johnson Creek in March of 2009.  Juvenile salmon from the 2008 brood year will continue to be reared at the McCall Fish Hatchery.  These fish will be marked with CWT and VIE tags in the later part of the year.

-         Operate adult salmon trap on Johnson Creek.
-         Collect and spawn up to 40 pairs of adult salmon.
-         Release 89,000 brood year 2007 smolts back into Johnson Creek.  Brood stock collection target fell short in 2007 because trapping activities were suspended for four days due to wildfire activities adjacent to the trap site.
-         Rear up to 110,000 brood year 2008 juveniles at the McCall Fish Hatchery.
-         Update Annual Operating Plan and submit to NOAA Fisheries prior to adult salmon trapping season.
-         Prepare Brood Year 2007 Annual Report and 2008 Adult Trapping Report.
-         Begin ESA Section 10 Permit renewal process that will cover activities beyond 2010.

Since 1998, salmon supplementation has been occurring on Johnson Creek.  This action was taken to begin the recovery of the Johnson Creek spawning aggregate.  The JCAPE project has worked with the Idaho Department of Fish and game (IDFG) and the U.S. Fish and Wildlife Service  (USFWS) to rear a limited number of smolts each year at the McCall Fish Hatchery.  The JCAPE project is allowed to rear up to 110,000 Johnson Creek smolts to at the McCall Fish Hatchery.  Brood stock has been collected in 1998, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, and 2008.  Smolts from brood stock collection have been released in 2000, 2002, 2003, 2004, 2005, 2006, 2007, and 2008.  The O&M program is currently rearing fish from brood years from 2007 and 2008.
Account Type(s):
Expense
Contract Start Date:
01/01/2009
Contract End Date:
12/31/2009
Current Contract Value:
$410,049
Expenditures:
$410,049

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
John Gebhards Nez Perce Tribe Yes Contract Manager johng@nezperce.org (208) 634-5290x3305
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Robert Hill Nez Perce Tribe No Interested Party robh@nezperce.org (208) 634-5290
Rebecca Johnson Nez Perce Tribe No Supervisor beckyj@nezperce.org (208) 621-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Ed Larson Nez Perce Tribe No Interested Party edl@nezperce.org (208) 843-7320x4630
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Bruce McLeod Nez Perce Tribe No Interested Party brucem@nezperce.org (208) 843-7320x4628
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Nancy Weintraub Bonneville Power Administration Yes Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance Documentation A: 165. Produce Environmental Compliance Documentation 12/31/2009 12/31/2009
Maintain Hatchery Facilities B: 61. Hatchery Facilities Maintenance 12/31/2009 12/31/2009
Produce Supplementation Fish C: 176. Johnson Creek Supplementation 12/31/2009 12/31/2009
Nutrient Enhancement in Johnson Creek D: 44. Nutrient Enhancement in Johnson Creek 09/30/2009 09/21/2009
Update Annual Operating Plan (AOP) and the Hatchery Genetic Management Plan (HGMP) E: 174. Produce AOP and HGMP for JCAPE O&M Project 12/31/2009 12/31/2009
Project Information Presentations F: 161. Project Information Presentations 12/31/2009 12/31/2009
Outreach and Education G: 99. Conduct outreach and public education efforts 12/31/2009 12/31/2009
Project Coordination H: 189. JCAPE O&M Project Coordination 12/31/2009 12/31/2009
Manage and Administer Project I: 119. Manage and Administer Johnson Creek O&M Project 12/31/2009 12/31/2009
Produce Weekly Adult Salmon Trapping and Spawning Summaries J: 141. Produce Weekly Activity Summaries 10/01/2009 10/01/2009
Prepare and Submit 2007 Brood Year Report K: 132. Produce 2007 Brood Year Report (May 2007 to April 2009) 12/31/2009 12/31/2009
Prepare and Submit 2008 Adult Salmon Run Report L: 132. Produce 2008 Adult Salmon Run Report (June 2008 to December 2008) 12/31/2009 12/31/2009

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Environmental Compliance Documentation 02/09/2007
B 61 Hatchery Facilities Maintenance 02/09/2007
C 176 Johnson Creek Supplementation 02/09/2007
D 44 Nutrient Enhancement in Johnson Creek 02/09/2007
E 174 Produce AOP and HGMP for JCAPE O&M Project 02/09/2007
F 161 Project Information Presentations 02/09/2007
G 99 Conduct outreach and public education efforts 02/09/2007
H 189 JCAPE O&M Project Coordination 02/09/2007
I 119 Manage and Administer Johnson Creek O&M Project 02/09/2007
J 141 Produce Weekly Activity Summaries 02/09/2007
K 132 Produce 2007 Brood Year Report (May 2007 to April 2009) 02/09/2007
L 132 Produce 2008 Adult Salmon Run Report (June 2008 to December 2008) 02/09/2007
M 185 Periodic Status Reports for BPA 02/09/2007