Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 45240: 199604300 EXP JCAPE O&M
Project Number:
Title:
Johnson Creek Artificial Propagation Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
45240
Contract Title:
199604300 EXP JCAPE O&M
Contract Continuation:
Previous: Next:
39846: 199604300 EXP JCAPE O&M
  • 50462: 1996-043-00 EXP JCAPE O&M
Contract Status:
Closed
Contract Description:
Contract Background Section:

This project is a small-scale supplementation initiative designed to increase the survival of a weak but recoverable spawning aggregate of summer chinook salmon.  The goal of this project is to prevent the extirpation of the Endangered Species Act (ESA) listed Johnson Creek summer chinook and begin their recovery through supplementation.  This project is permitted by the NOAA Fisheries to rear up to 110,000 chinook salmon smolts each year for release back into Johnson Creek from 2006 through 2010.  This level of supplementation will be evaluated during this period to determine the success of the spawning supplementation adult salmon.  Supplementation under this project is planned for a minimum of five (5) salmon generations or 25 years.

The Johnson Creek Artificial Propagation Enhancement Project (JCAPE) is identified in the 2008 FCRPS Biological Opinion in RPA Hatchery Strategy 2, Action 41 – Implement Safety Net Programs to Preserve Genetic Resources and Reduce Short-term Extinction Risk. Specifically, for Snake River Spring/Summer Chinook.  It is further stated in this RPA to fund the Johnson Creek/South Fork Salmon River safety net supplementation program, as described in the existing Section 10 permit.  This action funds the actual implementation, operation, and monitoring of a safety net project.  The Johnson Creek Artificial Propagation Enhancement project, a safety net project, utilizes existing hatchery facilities (McCall Fish Hatchery) to conduct salmon supplementation of up to 110,000 smolts per year.  The Johnson Creek Artificial Propagation Enhancement Project is the only chinook salmon supplementation project in the Salmon River Basin.  The Johnson Creek Artificial Propagation Enhancement Project has been issued an ESA Section 10 permit (Permit number 1250) by NOAA Fisheries to conduct salmon supplementation activities through 2010.

This contract will provide funds to:
·        Conduct Salmon Supplementation of the Johnson Creek Summer Chinook Salmon, a safety net program;
·        Provide for administrative oversight of the project; and
·        Share project results through Reports and Presentations

In 2010, installation and operation of a temporary adult chinook salmon weir and trap will continue with the collection of brood stock for use in the Johnson Creek Artificial Propagation Enhancement Project.  Juvenile salmon (smolts) from the 2008 brood year will be released back into Johnson Creek in March and April of 2010.  Juvenile salmon from the 2009 brood year will continue to be reared at the McCall Fish Hatchery.  These fish will be marked with CWT and VIE tags in the later part of the year.

-         Operate adult salmon trap on Johnson Creek.
-         Collect and spawn up to 40 pairs of adult salmon.
-         Release 105,000 brood year 2008 smolts back into Johnson Creek.
-         Rear up to 110,000 brood year 2009 juveniles at the McCall Fish Hatchery.
-         Update Annual Operating Plan and submit to NOAA Fisheries prior to adult salmon trapping season.
-         Prepare Brood Year 2008 Annual Report and 2009 Adult Trapping Report.
-         Complete ESA Section 10 Permit renewal process that will cover activities beyond 2010.

Since 1998, salmon supplementation has been occurring on Johnson Creek.  This action was taken to begin the recovery of the Johnson Creek spawning aggregate.  The JCAPE project has worked with the Idaho Department of Fish and game (IDFG) and the U.S. Fish and Wildlife Service  (USFWS) to rear a limited number of smolts each year at the McCall Fish Hatchery.  The JCAPE project is allowed to rear up to 110,000 Johnson Creek smolts to at the McCall Fish Hatchery.  Brood stock has been collected in 1998, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, and 2009.  Smolts from brood stock collection have been released in 2000, 2002, 2003, 2004, 2005, 2006, 2007, 2008, and 2009.  The O&M program is currently rearing fish from brood years from 2007 and 2008.
Account Type(s):
Expense
Contract Start Date:
01/01/2010
Contract End Date:
12/31/2010
Current Contract Value:
$425,992
Expenditures:
$425,992

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
John Gebhards Nez Perce Tribe Yes Contract Manager johng@nezperce.org (208) 634-5290x3305
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Robert Hill Nez Perce Tribe No Technical Contact robh@nezperce.org (208) 634-5290
Rebecca Johnson Nez Perce Tribe Yes Supervisor beckyj@nezperce.org (208) 621-4629
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Ed Larson Nez Perce Tribe No Supervisor edl@nezperce.org (208) 843-7320x4630
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Bruce McLeod Nez Perce Tribe No Technical Contact brucem@nezperce.org (208) 843-7320x4628
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Nancy Weintraub Bonneville Power Administration Yes Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance Documentation A: 165. Produce Environmental Compliance Documentation 12/31/2010 12/29/2010
Adult Weir Installation and Removal B: 70. Installation and Removal of Adult Picker Weir 12/15/2010 09/23/2010
Produce Supplementation Fish C: 176. Johnson Creek Supplementation 12/31/2010 12/29/2010
Maintain Hatchery Facilities D: 61. Hatchery Facilities Maintenance 12/31/2010 12/29/2010
Nutrient Enhancement in Johnson Creek E: 44. Nutrient Enhancement in Johnson Creek 09/30/2010 09/15/2010
Update Annual Operating Plan (AOP) and the Hatchery Genetic Management Plan (HGMP) F: 174. Produce AOP and HGMP for JCAPE O&M Project 12/31/2010 12/29/2010
Project Information Presentations G: 161. Project Information Presentations 12/31/2010 12/29/2010
Outreach and Education H: 99. Conduct outreach and public education efforts 12/31/2010 12/29/2010
Project Coordination I: 189. JCAPE O&M Project Coordination 12/31/2010 12/29/2010
Manage and Administer Project J: 119. Manage and Administer Johnson Creek O&M Project 12/31/2010 12/29/2010
Produce Weekly Adult Salmon Trapping and Spawning Summaries K: 141. Produce Weekly Activity Summaries 10/01/2010 09/24/2010
Prepare and Submit 2008 Brood Year Report L: 132. Produce 2008 Brood Year Report (May 2008 to April 2010) 12/31/2010 12/29/2010
Prepare and Submit 2009 Adult Salmon Run Report M: 132. Produce 2009 Adult Salmon Run Report (June 2009 to December 2009) 12/31/2010 12/29/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Environmental Compliance Documentation 02/09/2007
B 70 Installation and Removal of Adult Picker Weir 01/01/2010
C 176 Johnson Creek Supplementation 01/01/2010
D 61 Hatchery Facilities Maintenance 01/01/2010
E 44 Nutrient Enhancement in Johnson Creek 01/01/2010
F 174 Produce AOP and HGMP for JCAPE O&M Project 02/09/2007
G 161 Project Information Presentations 02/09/2007
H 99 Conduct outreach and public education efforts 02/09/2007
I 189 JCAPE O&M Project Coordination 02/09/2007
J 119 Manage and Administer Johnson Creek O&M Project 02/09/2007
K 141 Produce Weekly Activity Summaries 02/09/2007
L 132 Produce 2008 Brood Year Report (May 2008 to April 2010) 02/09/2007
M 132 Produce 2009 Adult Salmon Run Report (June 2009 to December 2009) 02/09/2007
N 185 Periodic Status Reports for BPA 02/09/2007