Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 40841: 198811535 EXP KLICKITAT PASSAGE + HATCHERY DESIGN
Project Number:
Title:
Klickitat River Design and Construction-Yakima/Klickitat Fisheries Project (YKFP)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Klickitat 100.00%
Contract Number:
40841
Contract Title:
198811535 EXP KLICKITAT PASSAGE + HATCHERY DESIGN
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
PROJECT PURPOSE:
The Klickitat Fishery YKFP Design Project (K, D&C) will complete Step 2 requirements of capital construction elements identified in the Klickitat River Anadromous Fisheries Master Plan (KMP).  As identified in the KMP (March, 2008) the primary project goal is to increase the number and distribution of steelhead, spring Chinook, fall Chinook, and coho within the Klickitat Subbasin, through hatchery reform and habitat restoration. The KMP has established biological goals and objectives that will contribute to the accomplishment of the overall goal of increasing fish numbers and distribution within the Subbasin.  The biological goals, which are consistent with the NPCC Fish and Wildlife Program (NPCC 2000), are designed to achieve both the biological performance of the target species and improve environmental conditions to allow sustainable populations.

This project addresses Step 2 requirements for construct improvements, related design work, and NEPA requirements to the existing Klickitat Hatchery near Glenwood, Washington, as well as to the Lyle Falls Fishway and broodstock collection facility, Castile Falls Fishway Escapement Monitoring Facility, and Wahkiacus Hatchery & Acclimation Facility.  In addition, it addresses the design and permitting of the Klickitat Hatchery Vehicle Bridge and basinwide PIT detection installation.  These facilities are needed to support programs for spring Chinook salmon, fall Chinook, steelhead, and coho salmon.  The location of the Wahkiacus facility will allow release of hatchery coho and fall Chinook salmon to the lower river which will limit adverse impacts to native fish species.

Klickitat Design & Construction Project Outline, with Work Element Title letter designations;

G.          Klickitat  Hatchery EIS Pre-Scoping
H.          Lyle Falls Fishway Improvements;
I             Lyle Falls Brood Collection Design;
J.           Castile Falls Fishway Improvements;
K.           Klickitat Hatchery Vehicle Bridge;
L.           Klickitat Hatchery PIT tag & Enumeration Design;
M.          Klickitat Hatchery Conceptual Design Study.
        


BACKGROUND:
The Yakama Nation has actively managed fish and wildlife on their Tribal lands for more than 50 years.  During this time, wild and artificially produced spring Chinook (Onchorynchus tshawytscha), fall Chinook (O . tshawytscha), coho (O. kisutch), and steelhead (O. mykiss) in the Klickitat Subbasin have been managed to ensure their long-term existence and provide fishing opportunities in an effort to mitigate for the loss of fisheries due to construction of the Columbia River hydroelectric dams.

The Klickitat Hatchery, Lyle Falls Fishway, and Castile Falls Fishway were built as part of an effort to mitigate for lost fishing opportunities.  The ownership and operation of the three facilities, which was previously operated by the Washington Department of Fish and Wildlife, was transferred to the Yakama Nation in December 2005.  They are operated under the Yakima/Klickitat Fisheries Program (YKFP). The YKFP uses artificial production to re-establish, supplement, and/or increase natural production of anadromous salmonids and harvest opportunities while maintaining long-term fitness of the target populations and minimizing or avoiding impacts on non-target species.
Account Type(s):
Expense
Contract Start Date:
09/15/2008
Contract End Date:
04/30/2011
Current Contract Value:
$1,545,442
Expenditures:
$1,545,442

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shirley Alvarado Yakama Confederated Tribes Yes Administrative Contact shirley_alvarado@yakama.com (509) 865-5121x6304
Megan Campbell Harbor Consulting Engineers Yes Technical Contact mtcampbell@harborengineers.com (206) 709-2397
Hannah Dondy-Kaplan Bonneville Power Administration No Interested Party hadondy-kaplan@bpa.gov (503) 230-4071
Mary Haight Bonneville Power Administration Yes COR mthaight@bpa.gov (503) 230-3112
John Hutchins Harbor Consulting Engineers No Interested Party jrhutchins@harborengineers.com (206) 709-2397
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Mel Sampson Yakama Confederated Tribes No Supervisor mel@yakama.com (509) 865-5121x6303
Bill Sharp Yakama Confederated Tribes Yes Contract Manager Bill_Sharp@yakama.com (509) 865-5121x6355
Leona Slagle Harbor Consulting Engineers No Administrative Contact llslagle@harborengineers.com (206) 709-2397
Nancy Weintraub Bonneville Power Administration Yes Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373
Adrienne Wilson Yakama Confederated Tribes Yes Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Programmatic/Contractual Requirements A: 119. Manage and Administer D & C Project 07/31/2010 07/31/2010
Public Information & Outreach B: 99. Update BPA, NPCC, and YKFP web sites w/ Project information 09/14/2010 09/14/2010
Step 2 Submittals and Formal Presentations E: 169. NPCC, ISRP, HSRG, and agency review 04/30/2011
Provide Technical Expertise & Documentation F: 165. Produce Step 2 NEPA documents 08/17/2010 08/17/2010
Provides Technical Expertise & EIS Pre-Scoping Documentation G: 165. Klickitat Hatchery EIS Pre-Scoping 05/01/2009 03/31/2009
60% Design Development Progress Set H: 175. Lyle Falls Fishway Improvements 03/27/2009 03/27/2009
Progress Set I: 175. Lyle Falls Brood Collection Design 10/30/2010 10/30/2010
60% Design Development Progress Set J: 175. Castile Falls Fishway Improvements 02/05/2009 02/05/2009
60% Design Development Progress Set K: 175. Klickitat Hatchery Vehicle Bridge 01/27/2009 02/27/2009
60% Design Development Progress Set L: 175. Klickitat Hatchery Pit Tag & Enumeration Design 09/30/2010 09/30/2010
Klickitat Hatchery Conceptual Design Study Report M: 174. Klickitat Hatchery Conceptual Design Study 08/31/2010 09/30/2010
Wahkiacus Hatchery Conceptual Design Study N: 174. Wahkiacus Hatchery Conceptual Design Study 08/17/2010 09/30/2010
Step 3 submittals O: 169. ISRP, NPCC and NOAA submittals 04/30/2011
Manage and Administer D & C Project P: 119. Manage and Adminster D&C Project - through remainder of performance period 04/30/2011 04/30/2011
Design Studies Q: 175. Klickitat Hatchery and Wahkiacus Hatchery Design Revisions 11/01/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 174 Produce Plan
  • 6 instances of WE 175 Produce Design
  • 2 instances of WE 169 Council 3-step Process: Step 2
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 5 instances of WE 175 Produce Design
  • 2 instances of WE 169 Council 3-step Process: Step 2

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer D & C Project 02/09/2007
B 99 Update BPA, NPCC, and YKFP web sites w/ Project information 02/09/2007
C 132 Submit Annual Progress Report 02/09/2007
D 185 Periodic Status Reports for BPA 02/09/2007
E 169 NPCC, ISRP, HSRG, and agency review 02/09/2007
F 165 Produce Step 2 NEPA documents 02/09/2007
G 165 Klickitat Hatchery EIS Pre-Scoping 02/09/2007
H 175 Lyle Falls Fishway Improvements 02/09/2007
I 175 Lyle Falls Brood Collection Design 02/09/2007
J 175 Castile Falls Fishway Improvements 02/09/2007
K 175 Klickitat Hatchery Vehicle Bridge 02/09/2007
L 175 Klickitat Hatchery Pit Tag & Enumeration Design 02/09/2007
M 174 Klickitat Hatchery Conceptual Design Study 02/09/2007
N 174 Wahkiacus Hatchery Conceptual Design Study 02/09/2007
O 169 ISRP, NPCC and NOAA submittals 02/09/2007
P 119 Manage and Adminster D&C Project - through remainder of performance period 09/15/2008
Q 175 Klickitat Hatchery and Wahkiacus Hatchery Design Revisions 09/15/2008