| 35962: 2003-017-00 EXP ISEMP - NOAA COORDINATION AND PROJECT DESIGN |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Environmental Compliance supporting documentation | A: 165. Environmental Compliance | 05/01/2009 | 05/01/2009 | |
| Funding Package - Submit draft to COTR | B: 119. Manage and Administer Projects | 01/15/2010 | 02/28/2010 | |
| In-water work -- Beaver Dam Support | C: 29. Install Beaver Dam Support structures | 03/15/2010 | 03/01/2010 | |
| Riparian Tree Planting | D: 47. Riparian Planting | 03/15/2010 | 03/15/2010 | |
| Beaver Pond and BDS monitoring data | E: 157. Monitor Beaver Dam Support structures | 03/15/2010 | 03/15/2010 | |
| Beaver survival monitoring | F: 157. Monitor Beaver Population | 03/15/2010 | 03/15/2010 | |
| PIT tag based juvenile O. mykiss population data | G: 158. PIT tag juvenile O.mykiss | 03/15/2010 | 03/15/2010 | |
| Habitat survey for Bridge Creek IMW | H: 157. Habitat monitoring | 03/15/2010 | 03/15/2010 | |
| Bridge Ck. IMW data analysis | I: 162. Bridge Ck. IMW data analysis | 03/15/2010 | ||
| Enterprise-level tools to manage project data | J: 160. Develop pilot enterprise-level data management system | 04/30/2010 | 04/30/2010 | |
| PIT tag antenna design | K: 156. PIT tag antenna design and installation | 04/30/2010 | 04/30/2010 | |
| ISEMP Project Data Reduction and Analysis | L: 162. ISEMP data analysis coordination | 03/15/2010 | 03/15/2010 | |
| Final Approved Annual Report uploaded to BPA web site | M: 132. Combined Annual report of all project participants | 04/30/2010 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Environmental Compliance | 02/09/2007 | ||||||
| B | 119 | Manage and Administer Projects | 02/09/2007 | ||||||
| C | 29 | Install Beaver Dam Support structures | 04/27/2009 | ||||||
| D | 47 | Riparian Planting | 04/27/2009 | ||||||
| E | 157 | Monitor Beaver Dam Support structures | 03/05/2009 | ||||||
| F | 157 | Monitor Beaver Population | 03/05/2009 | ||||||
| G | 158 | PIT tag juvenile O.mykiss | 03/05/2009 | ||||||
| H | 157 | Habitat monitoring | 03/05/2009 | ||||||
| I | 162 | Bridge Ck. IMW data analysis | 02/09/2007 | ||||||
| J | 160 | Develop pilot enterprise-level data management system | 02/09/2007 | ||||||
| K | 156 | PIT tag antenna design and installation | 04/27/2009 | ||||||
| L | 162 | ISEMP data analysis coordination | 02/09/2007 | ||||||
| M | 132 | Combined Annual report of all project participants | 02/09/2007 | ||||||
| N | 185 | Periodic Status Reports for BPA | 02/09/2007 |