Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 41809: 200203200 EXP USGS SNAKE R. FALL CHIN LIFE HISTORY INVESTIGATIONS
Project Number:
Title:
Snake River Fall Chinook Salmon Life History Investigations
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
41809
Contract Title:
200203200 EXP USGS SNAKE R. FALL CHIN LIFE HISTORY INVESTIGATIONS
Contract Continuation:
Previous: Next:
36373: 200203200 EXP USGS SNAKE R. FALL CHIN LIFE HISTORY INVESTIGATIONS
  • 46831: 2002-032-00 EXP BIOP USGS SR FALL CHIN LIFE HISTORY
Contract Status:
Closed
Contract Description:
This project will be conducted by the US Geological Survey (USGS), US Fish and Wildlife Service (USFWS), Pacific Northwest National Laboratory (PNNL), and the University of Washington (UW). The goal of this project is to provide empirical data and analyses on the dam passage timing, travel rate, survival, and life history variation of fall Chinook salmon juveniles passing downstream in the four lower Snake River reservoirs from spring to winter.  The lack of this information has made it difficult to plan and evaluate aspects of hydrosystem operation including transportation and the timing and location of summer spill.  We propose to use radio telemetry, acoustic telemetry, and PIT tags to study migratory behavior, survival, and life history.  Subyearling fall Chinook salmon will be collected and tagged monthly from May through November in the Snake and Clearwater rivers.  We will use radio telemetry to collect migration behavior and passage timing information.  We will use acoustic telemetry to measure survival and determine where and when fall Chinook salmon juveniles stop migrating and begin to exhibit the reservoir-type life history.  We will collect water velocity and temperature information throughout the reservoirs and use hydrodynamic modeling to characterize the environmental conditions where fish are located.  This will be done by linking observed patterns in juvenile fall Chinook salmon behavior with hydraulic data.  We will use a statistical approach to estimate survival of subyearling fall Chinook salmon that exhibit a reservoir life history.  Previously this has not been possible.  The results from this study will assist fish managers in making informed decisions about operating the hydrosystem, including issues associated with juvenile transportation and summer spill.
Account Type(s):
Expense
Contract Start Date:
04/01/2009
Contract End Date:
03/31/2010
Current Contract Value:
$639,846
Expenditures:
$639,846

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brian Bellgraph Pacific Northwest National Laboratory No Interested Party brian.bellgraph@pnnl.gov (509) 371-7185
William Connor US Fish and Wildlife Service (USFWS) Yes Interested Party william_connor@fws.gov (208) 476-2242
Deborah Docherty Bonneville Power Administration Yes COR dldocherty@bpa.gov (503) 230-4458
Israel Duran Bonneville Power Administration No Env. Compliance Lead induran@bpa.gov (503) 230-3967
David Geist Pacific Northwest National Laboratory No Interested Party david.geist@pnnl.gov (509) 371-7165
Elizabeth Gordon US Geological Survey (USGS) No Administrative Contact egordon@usgs.gov (509) 538-2299x241
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Alec Maule US Geological Survey (USGS) No Supervisor amaule@usgs.gov (509) 538-2299x239
Geoffrey (PNL) McMichael Pacific Northwest National Laboratory No Interested Party geoffrey.mcmichael@pnl.gov (509) 372-0874
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Craig Scanlan University of Washington No Interested Party cpscan@uw.edu (206) 685-1995
John Skalski University of Washington No Interested Party skalski@uw.edu (206) 616-4851
John Sneva Washington Department of Fish and Wildlife (WDFW) No Interested Party snevajgs@dfw.wa.gov (360) 902-2762
Kenneth Tiffan US Geological Survey (USGS) Yes Contract Manager ken_tiffan@usgs.gov (509) 538-2972
Richard Townsend University of Washington No Interested Party rich@u.washington.edu (206) 616-7492
Nancy Weintraub Bonneville Power Administration No Interested Party nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Ensure environmental compliance requirements are complete A: 165. Complete environmental compliance requirements 03/31/2010 03/31/2010
Install radio telemetry detection equipment B: 70. Install radio telemetry detection equipment 06/30/2009 06/30/2009
Collect fish for tagging C: 157. Collect fish for tagging 08/31/2009 08/10/2009
Tag fish with radio tags D: 158. Tag fish with radio tags 08/31/2009 08/13/2009
RESCHEDULE - Tag fish with radio tags E: 158. RESCHEDULE - Tag fish with radio tags 08/31/2009 08/13/2009
Conduct tag-life tests F: 157. Conduct tag-life tests 12/31/2009 12/31/2009
RESCHEDULE - Conduct tag life tests G: 157. RESCHEDULE - Conduct tag life tests 12/31/2009 12/31/2009
Monitor fish movement with mobile tracking H: 157. Monitor fish movement with mobile tracking 10/30/2009 10/27/2009
RESCHEDULE - Monitor fish movement with mobile tracking I: 157. RESCHEDULE - Monitor fish movement with mobile tracking 10/30/2009 10/27/2009
Monitor fish movement with fixed gear J: 157. Monitor fish movement with fixed gear 11/02/2009 11/02/2009
RESCHEDULE - Monitor fish movement with fixed gear K: 157. RESCHEDULE - Monitor fish movement with fixed gear 11/02/2009 11/02/2009
Determine the number of reservoir-type fish that overwinter in Lower Granite Reservoir L: 157. Determine the number of reservoir-type fish that overwinter in Lower Granite Reservoir 03/31/2010 03/31/2010
Confirm hydroacoustic fish targets M: 157. Confirm hydroacoustic fish targets 03/31/2010 03/31/2010
PIT tag fish for mark-recapture N: 158. PIT tag fish for mark-recapture 03/31/2010
Determine the migration histories of tagged fish O: 162. Determine the migration history of tagged fish 03/31/2010
Determine the migration histories of tagged fish P: 162. RESCHEDULE - Determine the migration history of tagged fish 03/31/2010
Estimate fish population with hydroacoustics Q: 162. Estimate fish population with hydroacoustics 03/31/2010 03/31/2010
Estimate fish population with mark-recapture R: 162. Estimate fish population with mark-recapture 03/31/2010
Manuscript S: 183. Winter Passage Paper 03/31/2010
Attach Progress Report in Pisces T: 132. Submit Progress Report for the period Apr 2007 to Mar 2008 07/31/2009 08/21/2009
Attach Progress Report in Pisces U: 132. Submit Progress Report for the period Apr 2008 to Mar 2009 09/30/2009 09/15/2009
Complete all project management and administrative activities for contract V: 119. Contract and project management for 2002-032-00 03/31/2010 03/31/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 183 Produce Journal Article
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 9 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 158 Mark/Tag Animals
  • 4 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete environmental compliance requirements 02/09/2007
B 70 Install radio telemetry detection equipment 02/09/2007
C 157 Collect fish for tagging 04/14/2009
D 158 Tag fish with radio tags 04/14/2009
E 158 RESCHEDULE - Tag fish with radio tags 04/14/2009
F 157 Conduct tag-life tests 02/09/2007
G 157 RESCHEDULE - Conduct tag life tests 02/09/2007
H 157 Monitor fish movement with mobile tracking 02/09/2007
I 157 RESCHEDULE - Monitor fish movement with mobile tracking 02/09/2007
J 157 Monitor fish movement with fixed gear 02/09/2007
K 157 RESCHEDULE - Monitor fish movement with fixed gear 02/09/2007
L 157 Determine the number of reservoir-type fish that overwinter in Lower Granite Reservoir 02/09/2007
M 157 Confirm hydroacoustic fish targets 04/14/2009
N 158 PIT tag fish for mark-recapture 04/14/2009
O 162 Determine the migration history of tagged fish 02/09/2007
P 162 RESCHEDULE - Determine the migration history of tagged fish 02/09/2007
Q 162 Estimate fish population with hydroacoustics 02/09/2007
R 162 Estimate fish population with mark-recapture 02/09/2007
S 183 Winter Passage Paper 02/09/2007
T 132 Submit Progress Report for the period Apr 2007 to Mar 2008 02/09/2007
U 132 Submit Progress Report for the period Apr 2008 to Mar 2009 02/09/2007
V 119 Contract and project management for 2002-032-00 02/09/2007
W 185 Periodic Status Reports for BPA 02/09/2007