Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 41866: 200900300 EXP UPPER COLUMBIA HABITAT RESTORATION
Project Number:
Title:
Upper Columbia Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 20.00%
Methow 40.00%
Wenatchee 40.00%
Contract Number:
41866
Contract Title:
200900300 EXP UPPER COLUMBIA HABITAT RESTORATION
Contract Continuation:
Previous: Next:
n/a
  • 47761: 200900300 EXP UPPER COLUMBIA HABITAT RESTORATION
Contract Status:
Closed
Contract Description:
The Upper Columbia Habitat Restoration Project works to restore natural function to the Wenatchee, Entiat and Methow Watersheds. Our restoration  efforts take a comprehensive approach to the restoration of habitat for fisheries resources including salmonids and bull trout.  This contract will allow the YN to begin partnering with other entities in the Upper Columbia.  Although this contract will not be executed in time for any on the ground work to be performed in 2009, we will be able to engineer and permit several projects and have them ready for implementation in 2010.
Account Type(s):
Expense
Contract Start Date:
04/15/2009
Contract End Date:
07/31/2012
Current Contract Value:
$7,357,730
Expenditures:
$7,357,730

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes Yes Technical Contact adas@yakamafish-nsn.gov (509) 945-0754
Brenda Aguirre Bonneville Power Administration Yes Interested Party baguirre@bpa.gov (503) 230-5928
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Dori Blackburn Methow Conservancy Yes Technical Contact personid6024@nowhere.com (509) 996-5005
Jason Breidert Yakama Confederated Tribes Yes Technical Contact brej@yakamafish-nsn.gov (509) 860-5351
Chris Butler Yakama Confederated Tribes Yes Technical Contact butlerc@yakamafish-nsn.gov (509) 449-8215
Christopher Clemons Yakama Confederated Tribes Yes Technical Contact clec@yakamafish-nsn.gov (509) 881-5746
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
John Jorgensen Yakama Confederated Tribes Yes Technical Contact jorj@yakamafish-nsn.gov (509) 670-7298
Kim Levesque Yakama Confederated Tribes Yes Technical Contact levk@yakamafish-nsn.gov (509) 423-7614
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Jay Marcotte Bonneville Power Administration Yes COR jgmarcotte@bpa.gov (503) 230-3943
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jackie Olney Yakama Confederated Tribes Yes Administrative Contact olnj@yakamafish-nsn.gov (509) 865-5121x6313
Steve Parker Yakama Confederated Tribes No Supervisor pars@yakamafish-nsn.gov (509) 865-6262x6342
Brandon Rogers Yakama Confederated Tribes Yes Contract Manager rogb@yakamafish-nsn.gov (509) 949-4109
Hans Smith Yakama Confederated Tribes Yes Technical Contact h.smith@methownet.com (509) 449-2750
Jennifer Stolz Bonneville Power Administration No Interested Party jpstolz@bpa.gov (503) 230-3233
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Completed Habitat Restoration Project B: 29. Keystone Canyon Habitat Project - 2009-01 07/30/2011 06/29/2010
Reintroduce 4 Families of Beavers into the Upper Methow Watershed C: 36. Reintroduce Beavers - Methow Watershed 2009-19 12/31/2009 12/31/2009
3 completed project plans as per the Work Element Description F: 174. 2nd CCR Methow River Fender Mill Engineering 2009-15 12/31/2009 12/31/2009
Produce Geo-rectified thermal IR imagery in known vertical and horizontal survey datum. G: 157. Conduct Thermal Infrared (TIR) Flight in Methow Basin - 2009-16 12/31/2009 12/31/2009
Replace Culverts with Bridges H: 184. Heath Phase II Install 2 Bridges - 2009-03 08/31/2010 06/30/2010
Completed Habitat Restoration Project I: 29. 5th CCR Hancock Springs Restoration 2009-14 09/30/2011 09/30/2011
One completed assessment document as per the Work Element Description J: 174. Lower Peshashtin Creek Assessment - 2009-07 08/01/2010 06/30/2010
5 passage barrier culverts replaced with non passage barrier structures K: 184. Chumstick Creek Culvert Replacements - 2009-08 10/31/2009 10/31/2009
Complete pre-acquisition work on the Marracci Property M: 172. Conservation Easement, Marracci - MC - 2009-06 11/01/2009 11/01/2009
Complete pre-acquisition work on the Canan Property N: 172. Conservation Easements Canan - MC - 2009-10 12/01/2009 12/01/2009
Complete pre-acquisition work on the Epps Property O: 172. Conservation Easement, Epps - MC - 2009-11 10/01/2009 10/01/2009
Activities completed to acquire Cedarosa properties P: 172. Purchase, Cedarosa properties - MC - 2009-13 07/28/2010 09/30/2010
Funding Package - Submit draft to COTR Q: 119. Manage Restoration Projects 07/31/2011 07/31/2011
Prepare for report to be written in year 2 R: 132. Not required for year 1 - year 1 results will be reported on as a deliverable in year 2 02/28/2010 02/28/2010
Completed environmental permit applications, submitted to Washington State S: 191. Project Permit Development & Coordination 07/31/2011 10/31/2009
Road Conditions Survey complete U: 115. 1st CCR Road Condition Survey 2009-18 11/30/2009 11/30/2009
Conduct Pre-Acquisition Activities for the Hancock Springs Conservation Easement W: 172. 1st CCR Hancock Springs Property Acquisition 2009-21 07/31/2011 06/30/2010
Submit reports documenting all contacts made X: 191. 5th, 3rd, 1st CCR Outreach Supporting Habitat Restoration Activities (Methow) 2009-22 07/31/2012 07/31/2012
Restoration feasibility study on the Big Valley Wildlife Area complete Y: 174. 1st CCR Big Valley Wildlife Area Feasability Study 2009-24 12/31/2009 09/01/2009
Completed Reach Assesments on the Lower Twisp and Chewuch Rivers Z: 174. 1st CCR Lower Twisp and Chewuch Reach Assessments - 2009-25 06/01/2010 06/01/2010
Construct one bank stabilization project AB: 29. 1st CCR Wolf Creek Road Bank Stabilization Project 2009-23 03/04/2010 03/04/2010
Produce plan for re-activation of the Goodfellow Sidechannel AC: 175. 1st CCR Goodfellow Sidechannel Project 2009-09 04/15/2010 04/15/2010
Conduct pre acquisition activities associated with the Parrington Property AE: 172. 2nd CCR Pre Acquisition Activities Associated with the Parrington Property CE - 2009-27 10/01/2010 09/30/2010
One completed assessment document as per the Work Element Description AF: 115. 2nd CCR 3D Entiat River Assesment 2009-29 03/31/2010 02/17/2010
One completed assessment document as per the Work Element Description AG: 115. 2nd CCR Upper Wenatchee River Assesment 2009-28 07/31/2012 07/31/2012
Produce Plans for Restoration of Reach 3-D AH: 175. 3rd CCR Entiat 3-D Engineering 2010-46 10/30/2010 10/30/2010
Produce Plans for Restoration of Middle Methow Reach - Lewisia Road to Twisp AI: 175. 3rd CCR Lewisia Road to Twisp, Middle Methow Reach Engineering 2010-56 07/31/2012 07/31/2012
Reintroduce 4 Families of Beavers into the Upper Methow Watershed AJ: 36. 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 07/31/2012 07/31/2012
Oversight of efforts to Purchase Conservation Easement AK: 172. 3rd CCR Beaver Creek Schoolhouse Property - 2010-55 07/31/2012 07/31/2012
Complete Survey and Hydraulic Modeling as per the milestones in this WE AL: 114. 5th, 3rd CCR UC Survey and hydraulic modeling Contract - 2010-58 07/31/2012 07/31/2012
Produce Designs for Small Restoration Projects AM: 175. 5th, 3rd CCR UC Engineering Design - 2010-57 07/31/2012 07/31/2012
contract for lwd harvest and hauling AN: 98. 5th, 3rd CCR LWD Procurement - 2010-59 07/31/2012 07/31/2012
Landowner Outreach completed AO: 99. 4th CCR (21150) CCD Landowner Outreach & Coordination - 2010-60 07/31/2012 07/31/2012
Construct Chewuch River Mile 10 Project AP: 30. 5th CCR Chewuch River Mile 10 Backwater Channel- 2010-47 07/31/2012 07/31/2012
Design reports, outreach materials, and final construction documents AV: 175. 5th CCR Twisp River RM 3.5 Restoration Design - 2011-64 07/31/2012
Complete the USFS NEPA projects for projects in the Chewuch AW: 165. 5th CCR Chewuch River USFS NEPA Process 07/31/2012 07/31/2012
Reintroduce Families of Beavers into the Upper Methow Watershed AY: 190. 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 07/31/2012 07/31/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 184 Install Fish Passage Structure
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 6 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 6 instances of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 5 instances of WE 174 Produce Plan
  • 4 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 84 Remove/Install Diversion
  • 2 instances of WE 184 Install Fish Passage Structure
  • 1 instance of WE 98 Other
  • 4 instances of WE 174 Produce Plan
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 6 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 2 instances of WE 184 Install Fish Passage Structure
  • 7 instances of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 115 Produce Inventory or Assessment
  • 5 instances of WE 174 Produce Plan
  • 5 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Brook (Salvelinus fontinalis)
  • 1 instance of WE 174 Produce Plan
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 4 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 174 Produce Plan
  • 5 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/09/2007
B 29 Keystone Canyon Habitat Project - 2009-01 08/24/2010
C 36 Reintroduce Beavers - Methow Watershed 2009-19 02/09/2007
D 84 Batie Diversion Reconfiguration (Beaver Creek) 2009-02 09/03/2009
E 30 Beaver Creek Channel Realignment - 2009-02 09/03/2009
F 174 2nd CCR Methow River Fender Mill Engineering 2009-15 11/09/2009
G 157 Conduct Thermal Infrared (TIR) Flight in Methow Basin - 2009-16 02/09/2007
H 184 Heath Phase II Install 2 Bridges - 2009-03 05/12/2010
I 29 5th CCR Hancock Springs Restoration 2009-14 02/09/2007
J 174 Lower Peshashtin Creek Assessment - 2009-07 02/09/2007
K 184 Chumstick Creek Culvert Replacements - 2009-08 01/26/2009
L 172 Conservation Easement, Riley MSRF - 2009-05 02/09/2007
M 172 Conservation Easement, Marracci - MC - 2009-06 02/09/2007
N 172 Conservation Easements Canan - MC - 2009-10 02/09/2007
O 172 Conservation Easement, Epps - MC - 2009-11 02/09/2007
P 172 Purchase, Cedarosa properties - MC - 2009-13 02/09/2007
Q 119 Manage Restoration Projects 02/09/2007
R 132 Not required for year 1 - year 1 results will be reported on as a deliverable in year 2 02/09/2007
S 191 Project Permit Development & Coordination 02/09/2007
T 186 1st CCR Repair Twisp River Side Channel Backup Pump - 20090-4
U 115 1st CCR Road Condition Survey 2009-18 02/09/2007
V 172 1st CCR Dryden Property Acquisition 2009-20 02/09/2007
W 172 1st CCR Hancock Springs Property Acquisition 2009-21 02/09/2007
X 191 5th, 3rd, 1st CCR Outreach Supporting Habitat Restoration Activities (Methow) 2009-22 02/09/2007
Y 174 1st CCR Big Valley Wildlife Area Feasability Study 2009-24 02/09/2007
Z 174 1st CCR Lower Twisp and Chewuch Reach Assessments - 2009-25 02/09/2007
AA 165 1st CCR Assist with EC on 2009-4, 2009-17, 2009-18 and Dryden 02/09/2007
AB 29 1st CCR Wolf Creek Road Bank Stabilization Project 2009-23 08/21/2009
AC 175 1st CCR Goodfellow Sidechannel Project 2009-09 06/09/2010
AD 172 2nd CCR Pre Acquisition Associated with the Sugar Dike land purchases 2009-26 04/15/2009
AE 172 2nd CCR Pre Acquisition Activities Associated with the Parrington Property CE - 2009-27 04/15/2009
AF 115 2nd CCR 3D Entiat River Assesment 2009-29 04/15/2009
AG 115 2nd CCR Upper Wenatchee River Assesment 2009-28 04/15/2009
AH 175 3rd CCR Entiat 3-D Engineering 2010-46 04/15/2009
AI 175 3rd CCR Lewisia Road to Twisp, Middle Methow Reach Engineering 2010-56 04/15/2009
AJ 36 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 04/15/2009
AK 172 3rd CCR Beaver Creek Schoolhouse Property - 2010-55 04/15/2009
AL 114 5th, 3rd CCR UC Survey and hydraulic modeling Contract - 2010-58 04/15/2009
AM 175 5th, 3rd CCR UC Engineering Design - 2010-57 04/15/2009
AN 98 5th, 3rd CCR LWD Procurement - 2010-59 09/22/2010
AO 99 4th CCR (21150) CCD Landowner Outreach & Coordination - 2010-60 04/15/2009
AP 30 5th CCR Chewuch River Mile 10 Backwater Channel- 2010-47 05/25/2011
AQ 29 5th CCR Chewuch River 8-Mile Ranch LWD- 2010-48 06/21/2011
AR 47 5th CCR Chewuch River 8-Mile Rach Re-vegetation - 2010-48 06/21/2011
AS 174 5th CCR River User Safety Plan - 2011-61 04/15/2009
AT 40 5th CCR Remove and Install Fence for 8 Mile Ranch - 2010-48 06/21/2011
AU 29 5th CCR Sunnyslope ELJ - 2011-63 08/23/2011
AV 175 5th CCR Twisp River RM 3.5 Restoration Design - 2011-64 04/15/2009
AW 165 5th CCR Chewuch River USFS NEPA Process 04/15/2009
AX 29 5th CCR Chewuch River Mil 10 Instream LWD - 2010-47 05/25/2011
AY 190 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 04/15/2009