| Completed Habitat Restoration Project |
B: 29. Keystone Canyon Habitat Project - 2009-01 |
|
07/30/2011 |
06/29/2010 |
| Reintroduce 4 Families of Beavers into the Upper Methow Watershed |
C: 36. Reintroduce Beavers - Methow Watershed 2009-19 |
|
12/31/2009 |
12/31/2009 |
| 3 completed project plans as per the Work Element Description |
F: 174. 2nd CCR Methow River Fender Mill Engineering 2009-15 |
|
12/31/2009 |
12/31/2009 |
| Produce Geo-rectified thermal IR imagery in known vertical and horizontal survey datum. |
G: 157. Conduct Thermal Infrared (TIR) Flight in Methow Basin - 2009-16 |
|
12/31/2009 |
12/31/2009 |
| Replace Culverts with Bridges |
H: 184. Heath Phase II Install 2 Bridges - 2009-03 |
|
08/31/2010 |
06/30/2010 |
| Completed Habitat Restoration Project |
I: 29. 5th CCR Hancock Springs Restoration 2009-14 |
|
09/30/2011 |
09/30/2011 |
| One completed assessment document as per the Work Element Description |
J: 174. Lower Peshashtin Creek Assessment - 2009-07 |
|
08/01/2010 |
06/30/2010 |
| 5 passage barrier culverts replaced with non passage barrier structures |
K: 184. Chumstick Creek Culvert Replacements - 2009-08 |
|
10/31/2009 |
10/31/2009 |
| Complete pre-acquisition work on the Marracci Property |
M: 172. Conservation Easement, Marracci - MC - 2009-06 |
|
11/01/2009 |
11/01/2009 |
| Complete pre-acquisition work on the Canan Property |
N: 172. Conservation Easements Canan - MC - 2009-10 |
|
12/01/2009 |
12/01/2009 |
| Complete pre-acquisition work on the Epps Property |
O: 172. Conservation Easement, Epps - MC - 2009-11 |
|
10/01/2009 |
10/01/2009 |
| Activities completed to acquire Cedarosa properties |
P: 172. Purchase, Cedarosa properties - MC - 2009-13 |
|
07/28/2010 |
09/30/2010 |
| Funding Package - Submit draft to COTR |
Q: 119. Manage Restoration Projects |
|
07/31/2011 |
07/31/2011 |
| Prepare for report to be written in year 2 |
R: 132. Not required for year 1 - year 1 results will be reported on as a deliverable in year 2 |
|
02/28/2010 |
02/28/2010 |
| Completed environmental permit applications, submitted to Washington State |
S: 191. Project Permit Development & Coordination |
|
07/31/2011 |
10/31/2009 |
| Road Conditions Survey complete |
U: 115. 1st CCR Road Condition Survey 2009-18 |
|
11/30/2009 |
11/30/2009 |
| Conduct Pre-Acquisition Activities for the Hancock Springs Conservation Easement |
W: 172. 1st CCR Hancock Springs Property Acquisition 2009-21 |
|
07/31/2011 |
06/30/2010 |
| Submit reports documenting all contacts made |
X: 191. 5th, 3rd, 1st CCR Outreach Supporting Habitat Restoration Activities (Methow) 2009-22 |
|
07/31/2012 |
07/31/2012 |
| Restoration feasibility study on the Big Valley Wildlife Area complete |
Y: 174. 1st CCR Big Valley Wildlife Area Feasability Study 2009-24 |
|
12/31/2009 |
09/01/2009 |
| Completed Reach Assesments on the Lower Twisp and Chewuch Rivers |
Z: 174. 1st CCR Lower Twisp and Chewuch Reach Assessments - 2009-25 |
|
06/01/2010 |
06/01/2010 |
| Construct one bank stabilization project |
AB: 29. 1st CCR Wolf Creek Road Bank Stabilization Project 2009-23 |
|
03/04/2010 |
03/04/2010 |
| Produce plan for re-activation of the Goodfellow Sidechannel |
AC: 175. 1st CCR Goodfellow Sidechannel Project 2009-09 |
|
04/15/2010 |
04/15/2010 |
| Conduct pre acquisition activities associated with the Parrington Property |
AE: 172. 2nd CCR Pre Acquisition Activities Associated with the Parrington Property CE - 2009-27 |
|
10/01/2010 |
09/30/2010 |
| One completed assessment document as per the Work Element Description |
AF: 115. 2nd CCR 3D Entiat River Assesment 2009-29 |
|
03/31/2010 |
02/17/2010 |
| One completed assessment document as per the Work Element Description |
AG: 115. 2nd CCR Upper Wenatchee River Assesment 2009-28 |
|
07/31/2012 |
07/31/2012 |
| Produce Plans for Restoration of Reach 3-D |
AH: 175. 3rd CCR Entiat 3-D Engineering 2010-46 |
|
10/30/2010 |
10/30/2010 |
| Produce Plans for Restoration of Middle Methow Reach - Lewisia Road to Twisp |
AI: 175. 3rd CCR Lewisia Road to Twisp, Middle Methow Reach Engineering 2010-56 |
|
07/31/2012 |
07/31/2012 |
| Reintroduce 4 Families of Beavers into the Upper Methow Watershed |
AJ: 36. 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 |
|
07/31/2012 |
07/31/2012 |
| Oversight of efforts to Purchase Conservation Easement |
AK: 172. 3rd CCR Beaver Creek Schoolhouse Property - 2010-55 |
|
07/31/2012 |
07/31/2012 |
| Complete Survey and Hydraulic Modeling as per the milestones in this WE |
AL: 114. 5th, 3rd CCR UC Survey and hydraulic modeling Contract - 2010-58 |
|
07/31/2012 |
07/31/2012 |
| Produce Designs for Small Restoration Projects |
AM: 175. 5th, 3rd CCR UC Engineering Design - 2010-57 |
|
07/31/2012 |
07/31/2012 |
| contract for lwd harvest and hauling |
AN: 98. 5th, 3rd CCR LWD Procurement - 2010-59 |
|
07/31/2012 |
07/31/2012 |
| Landowner Outreach completed |
AO: 99. 4th CCR (21150) CCD Landowner Outreach & Coordination - 2010-60 |
|
07/31/2012 |
07/31/2012 |
| Construct Chewuch River Mile 10 Project |
AP: 30. 5th CCR Chewuch River Mile 10 Backwater Channel- 2010-47 |
|
07/31/2012 |
07/31/2012 |
| Design reports, outreach materials, and final construction documents |
AV: 175. 5th CCR Twisp River RM 3.5 Restoration Design - 2011-64 |
|
07/31/2012 |
|
| Complete the USFS NEPA projects for projects in the Chewuch |
AW: 165. 5th CCR Chewuch River USFS NEPA Process |
|
07/31/2012 |
07/31/2012 |
| Reintroduce Families of Beavers into the Upper Methow Watershed |
AY: 190. 5th, 3rd CCR Reintroduce Beavers - Methow Watershed 2009-19 |
|
07/31/2012 |
07/31/2012 |