| Province | Subbasin | % |
|---|---|---|
| Columbia Cascade | Entiat | 20.00% |
| Methow | 40.00% | |
| Wenatchee | 40.00% |
| Previous: | Next: |
|---|---|
| 41866: 200900300 EXP UPPER COLUMBIA HABITAT RESTORATION |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Construct Goodfellow Side Channel | C: 30. Goodfellow Sidechannel Project 2010-34 | 07/31/2010 | 06/30/2010 | |
| One completed assessment document as per the Work Element Description | D: 115. Upper Wenatchee River Assessment 2009-28 | 05/31/2012 | ||
| Groundwater pump tests complete | E: 148. Install Piezometer Wells and Conduct Groundwater Pump Tests 2010-37 | 05/31/2012 | 05/31/2012 | |
| Relocate Bromas Creek Road | F: 33. Bromas Creek Road Relocation 2010-36 | 10/30/2010 | 06/30/2010 | |
| track MSRF pre acquisition activities | H: 172. Beaver Creek Right R/L SM 05-01-C Property Acquisition | 05/31/2012 | 05/31/2012 | |
| A completed project design plan | I: 175. KIZ 1-3 Engineering 2009-32 | 05/31/2012 | 05/31/2012 | |
| Funding Package - Submit draft to COTR | K: 119. Manage Restoration Projects | 01/15/2011 | 12/31/2010 | |
| assistance provided to BPA EC staff | L: 165. Provide assistance to KEC on projects | 05/31/2012 | 05/31/2012 | |
| track MSRF pre-acquisition activities as described in WE Description | M: 172. Methow Right RM 44-01-C Pre-Acquisition | 05/31/2012 | 05/31/2012 | |
| track MSRF pre-acquisition activities | N: 172. Methow Right RM 42-01-S Property Pre-Acquisition | 05/31/2012 | ||
| Libby Creek Reach Assessment (Mile 0 to 1) | O: 115. 1st CCR 22021 - Libby Creek Assessment 2011 - 2010-41 | 05/31/2012 | ||
| Design reports, outreach materials, and final construction documents | P: 175. 1st CCR 22021 - Twisp River RM 0.7 to RM 1.7 Restoration Design - 2010-54 | 05/31/2012 | 05/31/2012 | |
| Design reports, outreach materials, and final construction documents | Q: 175. 1st CCR 22021 - Sunnyslope ELJ - 2010-45 | 05/31/2012 | 03/30/2011 | |
| UCHRP Public Outreach Campaign | U: 99. 1st CCR 22021 - UCHRP Public Relations Liaison - 2010-42 | 05/31/2012 | 05/31/2012 | |
| Pre-acquisition complete for Natapoc property in Upper Wenatchee | V: 172. 1st CCR 22021 - Natapoc - Upper Wenatchee Property | 06/29/2012 | ||
| Vegetation Maintenance | W: 22. 1st CCR 22021 - Methow Subbasin Vegetation Maintenance - 2010-43 | 05/31/2012 | 05/31/2012 | |
| Wetland Delineations and Rare Plant Surveys completed | X: 165. 1st CCR 22021 - Wetland Delineation and Rare Plant Surveys - 2010-44 | 05/31/2012 | 05/31/2012 | |
| Construct 3-D Habitat Enhancement Features | Y: 29. 1st CCR 22021 - 3-D Stillwaters Habitat Enhancement Project - 2009-29 | 05/31/2012 | 05/31/2012 | |
| Design reports, outreach materials, and final construction documents | Z: 175. 1st CCR 22021 - Chewuch River RM 10 Restoration Design - 2010-47 | 05/31/2012 | 03/30/2011 | |
| Design reports, outreach materials, and final construction documents | AA: 175. 1st CCR 22021 - Chewuch River 8-Mile Ranch Project Retoration Design - 2010-48 | 05/31/2012 | 03/30/2011 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
| Coho (O. kisutch) - Unspecified Population |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Lamprey, Pacific (Entosphenus tridentata) |
|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | 02/01/2010 | ||||||
| B | 30 | Fender Mill Side Channel Project 2010-33 | 06/01/2010 | ||||||
| C | 30 | Goodfellow Sidechannel Project 2010-34 | 04/28/2011 | ||||||
| D | 115 | Upper Wenatchee River Assessment 2009-28 | 06/01/2010 | ||||||
| E | 148 | Install Piezometer Wells and Conduct Groundwater Pump Tests 2010-37 | 09/09/2010 | ||||||
| F | 33 | Bromas Creek Road Relocation 2010-36 | 06/08/2011 | ||||||
| G | 172 | Chewuch Right RM 04-01-L Property Acquisition | 06/01/2010 | ||||||
| H | 172 | Beaver Creek Right R/L SM 05-01-C Property Acquisition | 06/01/2010 | ||||||
| I | 175 | KIZ 1-3 Engineering 2009-32 | 06/01/2010 | ||||||
| J | 132 | Annual Progress report submitted under Project 2009-006-00 Program Coordination & Administration | 04/01/2010 | ||||||
| K | 119 | Manage Restoration Projects | 04/01/2010 | ||||||
| L | 165 | Provide assistance to KEC on projects | 04/01/2010 | ||||||
| M | 172 | Methow Right RM 44-01-C Pre-Acquisition | 06/01/2010 | ||||||
| N | 172 | Methow Right RM 42-01-S Property Pre-Acquisition | 06/01/2010 | ||||||
| O | 115 | 1st CCR 22021 - Libby Creek Assessment 2011 - 2010-41 | 04/01/2010 | ||||||
| P | 175 | 1st CCR 22021 - Twisp River RM 0.7 to RM 1.7 Restoration Design - 2010-54 | 04/01/2010 | ||||||
| Q | 175 | 1st CCR 22021 - Sunnyslope ELJ - 2010-45 | 04/01/2010 | ||||||
| R | 175 | 1st CCR 22021 - Old Schoolhouse Restoration Design - 2010-40 | 04/01/2010 | ||||||
| S | 175 | 1st CCR 22021 - Twisp River RM 4.15 Restoration Design - 2010-38 | 04/01/2010 | ||||||
| T | 175 | 1st CCR 22021 - Twisp River RM 11.25 Restoration Design - 2010-39 | 04/01/2010 | ||||||
| U | 99 | 1st CCR 22021 - UCHRP Public Relations Liaison - 2010-42 | 04/01/2010 | ||||||
| V | 172 | 1st CCR 22021 - Natapoc - Upper Wenatchee Property | 04/01/2010 | ||||||
| W | 22 | 1st CCR 22021 - Methow Subbasin Vegetation Maintenance - 2010-43 | 04/01/2010 | ||||||
| X | 165 | 1st CCR 22021 - Wetland Delineation and Rare Plant Surveys - 2010-44 | 04/01/2010 | ||||||
| Y | 29 | 1st CCR 22021 - 3-D Stillwaters Habitat Enhancement Project - 2009-29 | 06/20/2011 | ||||||
| Z | 175 | 1st CCR 22021 - Chewuch River RM 10 Restoration Design - 2010-47 | 04/01/2010 | ||||||
| AA | 175 | 1st CCR 22021 - Chewuch River 8-Mile Ranch Project Retoration Design - 2010-48 | 04/01/2010 |